My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 8:34:06 PM
Creation date
5/1/2024 5:03:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231667
PE
2361 - UST FACILITY
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4075 E MAIN ST STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground d= <br />Designated UST Operator Visual Inspection <br />Yes No NA Date last <br />10. T 61 iNG AND IVIAM T ENANCE performed <br />Has monitoring system certification been completed within the past � � ❑ 5-9-2 <br />12 ii on-ths? <br />Has spill container testing been completed within the past 12 ❑ 5-9-23 <br />months <br />Has overfill prevention equipment inspection been completed L_ C l lJ 5®17-2 ' <br />Within the p,f.,;t 36 rrionthr-3) _ . <br />I las :ste :cii- dai`y ' <br />�Ontaii �rilent testing been conopleted 'vvithin ih�e mast El 11 JO t -1 Z` <br />36 months'? <br />Has tank; tightness testing; leen completed within regUired I_] ❑ LJ <br />timetrary'les' <br />Has line tih;htnecs testing been con-ipleted within the required IA ILI <br />timeframes' <br />Other Test / Maintenance: F-1 ❑El <br />Other Test j Maintenance: ❑ � ❑ C l <br />Other Test / Maintenance: F-1 Fi <br />11. <br />FACILITY _M LOY- TRAINING - 5-1_7-23 _.Yes N_o <br />-_..... - <br />Have all individuals perfurrning facility employee dui.ies vec:eived [lie required facilii.y <br />Pmployee training within thr� vast "l l months? <br />13. COMMENTS <br />This section may be used to record comments or observations that are not current compliance <br />deficiencies. <br />AY onsswers marked "'No' mast be described by the c!esignated UST operator in Section 3. <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.