My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2022 [REV] RCSI W/CHANGES
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieve Reports
>
ARCHIVED REPORTS_2022 [REV] RCSI W/CHANGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:37:57 AM
Creation date
5/14/2024 2:31:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2022 [REV] RCSI W/CHANGES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> <br />Forward Composting Facility Report of Composting Site Information <br />January 2022 <br />FORWARD COMPOSTING FACILITY <br />REPORT OF COMPOSTING SITE INFORMATION <br /> <br />TABLE OF CONTENTS <br /> <br />1.0 FACILITY OVERVIEW ......................................................................................................... 1-1 <br />1.1 Introduction ......................................................................................................... 1-1 <br />1.2 Site Location ......................................................................................................... 1-2 <br /> 1.2.1 Site Location Map .................................................................................... 1-2 <br /> 1.2.2 Site Facilities/Features ............................................................................. 1-2 <br /> 1.2.3 Surrounding Land Use .............................................................................. 1-3 <br />1.3 Quantity of Materials to be Accepted ................................................................. 1-4 <br /> 1.3.1 Maximum Daily Load Capacity ................................................................. 1-5 <br /> 1.3.2 Average Daily Throughput ....................................................................... 1-6 <br /> 1.3.3 Average Load Capacity Next Five Years ................................................... 1-6 <br /> 1.3.4 Design Capacity ........................................................................................ 1-6 <br /> 1.3.5 Feedstock Material Types ........................................................................ 1-7 <br />1.4 Types and Numbers of Vehicles Anticipated to Enter the Facility ...................... 1-7 <br />2.0 COMPOST PROCESSING SITE DESIGN, MONITORING, AND SITE IMPROVEMENTS ......... 2-1 <br /> 2.1 Composting Site Design ....................................................................................... 2-1 <br /> 2.1.1 Site Plan.................................................................................................... 2-1 <br /> 2.1.2 Design Details ........................................................................................... 2-3 <br /> 2.1.3 Facility Construction ................................................................................ 2-5 <br /> 2.1.4 Grading and Drainage Plan ...................................................................... 2-6 <br /> 2.1.5 Pad Composition and Dimensions ........................................................... 2-7 <br /> 2.1.6 Drainage Control ...................................................................................... 2-7 <br /> 2.1.7 Leachate Control ...................................................................................... 2-7 <br /> 2.1.8 Site Access ................................................................................................ 2-8 <br /> 2.1.9 Development Stages ................................................................................ 2-9 <br /> 2.1.10 Amendments and Additives ..................................................................... 2-9 <br /> 2.1.11 Physical Site Conditions Report ............................................................... 2-9 <br /> 2.2 Monitoring ......................................................................................................... 2-13 <br /> 2.3 Composting Site Improvements ........................................................................ 2-14 <br /> 2.3.1 Identification Signs ................................................................................. 2-14 <br /> 2.3.2 Entry Signs .............................................................................................. 2-14 <br /> 2.3.3 Facility Security ...................................................................................... 2-14 <br /> 2.3.4 Roads ...................................................................................................... 2-14 <br /> 2.3.5 Visual Screening ..................................................................................... 2-15 <br />3.0 COMPOSTING FACILITY OPERATIONS .............................................................................. 3-1
The URL can be used to link to this page
Your browser does not support the video tag.