Laserfiche WebLink
2-16 <br />Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - August 2019January 2022 <br />z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2019-2020\rcsi 2019\text\sec 2.doc <br />The wheel wash station is located along the exit road as shown on F igure 2. The wheel <br />wash (Tracinator) station removes mud from the tires of trucks by shaking the vehicle as it <br />drives across the steel washboard channels. In addition, the concrete basin is filled to an <br />approximate 7-inch depth with water delivered by a water truck . As trucks drive through the <br />wheel wash station, water in the concrete basin washes away the mud on the tires. Mud will <br />be cleared from the wheel wash station, as needed, by filling the concrete basin with clean <br />water and pumping the water into a holding tank. The water in the holding tank will be <br />disposed of in accordance with WDR Order No. R5 -2014-0006. A water truck with a <br />pressurized hose will also be used to clean the basin. Due to the limited traffic volume, <br />traffic is not anticipated to back up at the tracinator. The site is graded to provide all- <br />weather access. <br />2.3.5 Visual Screening <br />A portion of the southern and eastern (Austin Road) sides of the site have a 5 -foot high <br />earthen berm to limit the site visibility from the road. In addition, the eastern side of the site <br />(Austin Road), southern side of the site, and the Compost Facility/RRF entrance area have <br />been landscaped with trees and brush.