Laserfiche WebLink
<br /> <br />Forward Composting Facility Report of Composting Site Information <br />January 2022 <br /> 5.3 Communication Facilities ..................................................................................... 5-1 <br /> 5.4 Lighting ................................................................................................................. 5-1 <br /> 5.5 Fire Fighting Equipment ....................................................................................... 5-2 <br /> 5.6 Protection of Users .............................................................................................. 5-2 <br /> 5.7 Safety Equipment ................................................................................................. 5-3 <br /> 5.8 Power Failure ....................................................................................................... 5-3 <br />6.0 POST-OPERATIONAL USE ................................................................................................. 6-1 <br />7.0 RECORD KEEPING ............................................................................................................. 7-1 <br /> 7.1 Inspection of Records .......................................................................................... 7-1 <br /> 7.2 Special Occurrences ............................................................................................. 7-1 <br /> 7.3 Record of Public Complaints ................................................................................ 7-1 <br /> 7.4 Records of Types and Quantities of Materials ..................................................... 7-1 <br /> 7.5 Load Checking Program Records ......................................................................... 7-2 <br /> 7.6 Article 7 Test Results Records .............................................................................. 7-2 <br /> 7.7 Record of Serious Injury ....................................................................................... 7-2 <br /> 7.8 Training Records .................................................................................................. 7-2 <br />8.0 CONDITIONS, CRITERIA, AND REQUIREMENTS ................................................................ 8-1 <br /> <br /> <br />TABLES <br />Table 1: Regional Hydrogeologic Characteristics <br />Table 2: Summary of Subsurface Soil Properties and Unit Weights <br />Table 3: Maximum Acceptable Metal Concentrations <br />Table 4: Minimum Temperature and Process Time Requirements for Pathogen Reduction <br />Table 5: Emergency Contact List <br />Table 6: Medical Emergency Contact List <br />Table 7: Agency Notification for Hazardous Waste Disposal Incidents <br />Table 8: Equipment List <br />Table 9: Local Climatological Data Stockton Area <br /> <br />FIGURES <br />Figure 1: Vicinity Map and Site Location Map <br />Figure 2: Site Plan <br />Figure 3: 1,000 ft. Radius/Adjacent Land Use Map <br />Figure 4: Windrow Machine Turned <br />Figure 5: Traffic Flow Plan <br />Figure 6: Grading and Drainage Plan and Earthwork Sections <br />Figure 7: Isohyetal Map <br />Figure 8: Flood Plain Map <br />Figure 9: Wind Rose <br /> <br />APPENDICES <br />Appendix A: Operating Permits and Approvals <br />Appendix B: Design Calculations