Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for PELICAN RENEWABLES LLC as of May 01, 2024. <br /> Open violations from October 26, 2022 inspection <br /> Violation#203-Failure to implement the SPCC Plan. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan was not implemented, as <br /> required. Monthly secondary containment tank inspections and trainings were not conducted by the facility as per <br /> their SPCC plan. <br /> REGULATION GUIDANCE: 112.3: The owner or operator or an onshore or offshore facility subject to this section <br /> must prepare in writing and implement a Spill Prevention Control and Countermeasure Plan (hereafter"SPCC <br /> Plan"or"Plan"),"in accordance with§ 112.7 and any other applicable section. 25270.4.5.(a):An owner or operator <br /> shall conduct periodic inspections of the storage tank to ensure compliance with Part 112 (commencing with <br /> Section 112.1)of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. In implementing the <br /> spill prevention control and countermeasure plan, an owner or operator shall fully comply with the latest version of <br /> the regulations contained in Part 112 (commencing with Section 112.1)of Subchapter D of Chapter I of Title 40 of <br /> the Code of Federal Regulations. <br /> CORRECTIVE ACTION: Implement the SPCC plan, as required. Submit proof of correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 8 <br />