My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3028
>
2800 - Aboveground Petroleum Storage Program
>
PR0530029
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 2:39:03 PM
Creation date
5/22/2024 10:47:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0530029
PE
2834
FACILITY_ID
FA0019299
FACILITY_NAME
PELICAN RENEWABLES LLC
STREET_NUMBER
3028
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14502008
CURRENT_STATUS
01
SITE_LOCATION
3028 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for PELICAN RENEWABLES LLC as of May 01, 2024. <br /> Open violations from October 26, 2022 inspection <br /> Violation#601 -Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan reviewed at the time of <br /> inspection,dated 9/28/2018, did not follow the order or requirements of 40 CFR Part 112.7. The plan doesn't <br /> include adequate cross-reference. The following items are inaccurate: <br /> -The requirements for verbal discharge reporting were referenced as being in section 4.2.5 but were actually <br /> located in section 4.2.2. <br /> -The Inspections, Tests, and Records section references Table 6.1 but there is no Table 6.1 in the SPCC plan. <br /> -The Facility Layout is listed as being in section 3.1 but was actually referenced in section 3.2 of the SPCC plan. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a <br /> Plan in accordance with good engineering practices.The Plan must have the full approval of management at a <br /> level of authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in <br /> writing. If you do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan <br /> acceptable to the Regional Administrator that meets all of the applicable requirements listed in this part, and you <br /> must supplement it with a section cross-referencing the location of requirements listed in this part and the <br /> equivalent requirements in the other prevention plan. If the Plan calls for additional facilities or procedures, <br /> methods, or equipment not yet fully operational,you must discuss these items in separate paragraphs and must <br /> explain separately the details of installation and operational start-up. <br /> CORRECTIVE ACTION: Ensure that your SPCC Plan complies with the following requirements: 1. It follows the <br /> required SPCC rule sequence and/or includes adequate cross-reference. Provide proof of correction to the EHD. <br /> ---------------------------------------------- <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan failed to have the full approval <br /> of management at a level of authority to commit the necessary resources to fully implement the Plan. Page 2, <br /> Section 1.3 Management Approval was not signed. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a <br /> Plan in accordance with good engineering practices.The Plan must have the full approval of management at a <br /> level of authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in <br /> writing. If you do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan <br /> acceptable to the Regional Administrator that meets all of the applicable requirements listed in this part, and you <br /> must supplement it with a section cross-referencing the location of requirements listed in this part and the <br /> equivalent requirements in the other prevention plan. If the Plan calls for additional facilities or procedures, <br /> methods, or equipment not yet fully operational,you must discuss these items in separate paragraphs and must <br /> explain separately the details of installation and operational start-up. <br /> CORRECTIVE ACTION: Immediately obtain required management approval for the SPCC Plan for this facility. <br /> Provide proof of correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).