Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for PELICAN RENEWABLES LLC as of May 01, 2024. <br /> Open violations from October 26, 2022 inspection <br /> Violation#601 -Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan reviewed at the time of <br /> inspection,dated 9/28/2018, did not follow the order or requirements of 40 CFR Part 112.7. The plan doesn't <br /> include adequate cross-reference. The following items are inaccurate: <br /> -The requirements for verbal discharge reporting were referenced as being in section 4.2.5 but were actually <br /> located in section 4.2.2. <br /> -The Inspections, Tests, and Records section references Table 6.1 but there is no Table 6.1 in the SPCC plan. <br /> -The Facility Layout is listed as being in section 3.1 but was actually referenced in section 3.2 of the SPCC plan. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a <br /> Plan in accordance with good engineering practices.The Plan must have the full approval of management at a <br /> level of authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in <br /> writing. If you do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan <br /> acceptable to the Regional Administrator that meets all of the applicable requirements listed in this part, and you <br /> must supplement it with a section cross-referencing the location of requirements listed in this part and the <br /> equivalent requirements in the other prevention plan. If the Plan calls for additional facilities or procedures, <br /> methods, or equipment not yet fully operational,you must discuss these items in separate paragraphs and must <br /> explain separately the details of installation and operational start-up. <br /> CORRECTIVE ACTION: Ensure that your SPCC Plan complies with the following requirements: 1. It follows the <br /> required SPCC rule sequence and/or includes adequate cross-reference. Provide proof of correction to the EHD. <br /> ---------------------------------------------- <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan failed to have the full approval <br /> of management at a level of authority to commit the necessary resources to fully implement the Plan. Page 2, <br /> Section 1.3 Management Approval was not signed. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a <br /> Plan in accordance with good engineering practices.The Plan must have the full approval of management at a <br /> level of authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in <br /> writing. If you do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan <br /> acceptable to the Regional Administrator that meets all of the applicable requirements listed in this part, and you <br /> must supplement it with a section cross-referencing the location of requirements listed in this part and the <br /> equivalent requirements in the other prevention plan. If the Plan calls for additional facilities or procedures, <br /> methods, or equipment not yet fully operational,you must discuss these items in separate paragraphs and must <br /> explain separately the details of installation and operational start-up. <br /> CORRECTIVE ACTION: Immediately obtain required management approval for the SPCC Plan for this facility. <br /> Provide proof of correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 8 <br />