My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024 Q1 WATER QUALITY RPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_2024 Q1 WATER QUALITY RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:50:50 AM
Creation date
5/31/2024 8:38:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024 Q1 WATER QUALITY RPT
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brendan Kenny <br />April 12, 2024 <br />Page 2 <br />limit for this instrument is approximately 0.10 percent by volume. Compliance testing for gas <br />monitoring probes is included below. <br />Gas Monitoring Probe Testing Procedures <br />Connect sample tubing, open test valve; observe pressure and record data. <br />For probes 20 feet deep or less, turn on sample pump, observe and record methane, oxygen, <br />and carbon dioxide gas concentrations, when readings have stabilized for 30 seconds. <br />For probes more than 20 feet deep, turn on sample pump, extract a minimum of one probe <br />volume, observed and record methane, oxygen, and carbon dioxide gas concentrations, when <br />readings have stabilized for 30 seconds. <br />Close test valve, disconnect sample instruments and secure sample location. <br />GCCS OPERATIONS AND MAINTENANCE <br />SCS Engineers (SCS) is contracted by Forward to conduct the Operation and Maintenance (O&M) of <br />the GCCS at the Landfill. During the first quarter of 2024, the following O&M activities were <br />conducted: <br />Quarterly monitoring of LFG probes was conducted; <br />Ongoing wellfield monitoring and tuning of the GCCS was performed; <br />Inspection of condensate sumps and pumps for proper operations was conducted. Any <br />required maintenance as a result of the inspections was performed; <br />There were no known GCCS system failures during the first quarter of 2024. The GCCS <br />operated continuously for 24 hours per day. The flare station experienced standard <br />malfunction, shutdown and startups, but there was no significant downtime; and <br />The instantaneous total flow rate of LFG on March 9, 2024 and March, 15, 2024, was 1,228 <br />standard cubic feet per minute (scfm) at the LFG-to-energy (LFGTE) facility, 2,609 scfm at <br />Flare A-1, and 1,328 scfm at Flare A-2.
The URL can be used to link to this page
Your browser does not support the video tag.