Laserfiche WebLink
A dOAQU1N Environmental Health Department <br /> COUNTY <br /> CP22 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> VAN DE POL ENT INC/PACIFIC PRIDE 351 N BECKMAN RD, LODI June 25 2024 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> CORRECTIVE ACTION: Immediately discontinue deposition of petroleum into this tank until the component is repaired <br /> or replaced by a properly licensed,trained, and certified contractor under permit and inspection of the EHD. If the spill <br /> container can't be replaced immediately,there is a possibility that the Diesel (tank 005) UST system may be red <br /> tagged to prevent fuel inputs. <br /> This is a repeat violation (Class 2) Violation. <br /> 56 CA Code of Regulations 2716(a-e)2030013-DO inspections completed at least every 30 days and meet all <br /> requirements(TCR 12). <br /> OBSERVATION:The designated operator(DO)failed to check and note the correct test dates for the secondary <br /> containment testing on the designated operator inspection reports. The correct date for secondary containment testing <br /> is 8/9/2022. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that DO performing inspections at this facility are including all of the required <br /> information on the reports. <br /> OBSERVATION: DO reports were not signed within the required time frame. <br /> -The 12/29/2023 designated operator report was signed by the owner/operator on 01/02/2024. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection,the <br /> DO shall sign and provide the owner or operator with a copy of the inspection report. Within 72 hours of being provided <br /> a signed copy of the report,the owner or operator shall provide a description of each corrective action taken or to be <br /> taken and shall sign and date the report, acknowledging the identified compliance issues. <br /> CORRECTIVE ACTION: Ensure all DO inspection reports are completed and signed within the required time frame in <br /> the future. <br /> OBSERVATION:The DO failed to check and note all required items on the visual inspection reports. The incorrect and <br /> missing information included the following from the inspection reports: <br /> -The wrong date was written in section 2 and section 4 of the DO reports. <br /> REGULATION GUIDANCE: During the visual inspection, the DO shall check that all required testing and maintenance <br /> for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including all <br /> of the required information on the reports. <br /> This is a repeat violation (Class 2) Violation. <br /> FA0003773 PR0231310 SCO01 06/25/2024 <br /> EHD Rev.12/06/2021 Page 6 of 7 CP22-UST FULL OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />