Laserfiche WebLink
LCCLCL...DESIGNED BY:DRAWN BY:CHECKED BY:ALLIANCE PM:PROJECT NO:BP REPM:ALLIANCE Z&DM:SITE ADDRESS:DRAWING TITLE:SHEET NO:VERSION:UNDERGROUND STORAGETANK STANDARDSELEMENT TPO1V-15.0 2023 SERIESCA-4795AAKTAFCONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:THE RECIPIENT OF THESE MATERIALS UNDERSTANDS THATCOPYRIGHT IN THE MATERIALS IS OWNED BY BP, AND ALSO, THATTHE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL BUSINESSINFORMATION OF BP. ACCORDINGLY, THE RECIPIENT AGREES TORETAIN THESE MATERIALS IN STRICT CONFIDENCE AND AGREES NOTTO DISCLOSE THESE MATERIALS TO ANY OTHER PARTY ANDFURTHER AGREES NOT TO MAKE COPIES OF THE MATERIALS. THERECIPIENT AGREES TO USE THE MATERIALS ONLY FOR THE LIMITEDPURPOSE FOR WHICH BP HAS MADE THE MATERIALS AVAILABLE, ANDRECIPIENT AGREES TO RETURN ALL MATERIALS TO BP EITHER UPONCOMPLETION OF THE INTENDED PURPOSE OR UPON THE REQUESTOF BP, WHICHEVER COMES FIRST.BP DOES NOT AND CANNOT WARRANT THAT THE PLANS FORPETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH ALLLEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE APPLIED INTHE FUTURE. NOR DOES BP WARRANT THAT A FUELING STORAGEAND DELIVERY SYSTEM CONSTRUCTED IN CONFORMITY WITH THESEPLANS WILL BE FREE OF ALL LEAKS. YOU ARE ACCORDINGLYSTRONGLY ENCOURAGED TO CONSULT WITH A FUELING STATIONENGINEER OF YOUR CHOOSING TO INDEPENDENTLY EVALUATEWHETHER THESE PLANS ARE TRULY SUFFICIENT FORCONSTRUCTING THE STORAGE AND DELIVERY SYSTEM AT YOURSTATION.PIPE AND TANK DESIGN DISCLAIMER:bpSEAL:DATENO. REVISION DESCRIPTION1 1/30/2024 INITIAL ISSUE2 2/7/2024 ISSUE FOR PERMIT345678910BP WEST COAST PRODUCTS, LLCFT-24607 S. AIRPORT WAYSTOCKTON, CA 952066,000/20,000/6,000GALLON USTINSTALLATION48" DIA.TURBINE SUMP4" S.S. BUNG FORTANK GAUGE22" S.S. MANWAYOPENINGBRINE RESERVOIR ANDINTERSTITIAL MONITOR14ANCHOR STRAPLOCATION (TYP.)14MANUFACTURER SUPPLIED18"x8-3/4"x18' DEADMAN (TYP. OF 4)8"VAPOR RECOVERYRISER59'-834"FILL42" DIA FILL SUMPFILL RISERVAPORRECOVERY RISER42" DIA FILLSUMPVAPORRECOVERY RISERFILL RISER42" DIA FILL SUMPMONITORRISERTANK LIFTINGLUGS (TYP.)22" DIA. MANWAY48" DIA.TURBINE SUMPTANK GAUGE LOCATIONSTRAP CHANNELTHROUGH SUMP8"8"10'-4" O.D.10' I.D.238" THICK, 4000 PSI FIBERREINFORCED CONCRETE TANKSLAB, SEE SHEET FS-1 FOR SPECSNOTE: SLOPE SIDES OF TANK HOLE (USE OFSLOPING MUST BE RECEIVE PRIORAPPROVAL ON INDIVIDUAL SITE BASIC FROM"BP") OR USE SHORING FOR ALL TANKEXCAVATIONS IN ACCORDANCE WITH OSHA1926 SUBPART P, OSHA STANDARDS -EXCAVATIONS; FINAL RULE OCTOBER 1, 1989EFT-55'-0" MINIMUMBURY DEPTH10'-4"10' DIA. UST = 16'-4" MIN.2' MIN.107BACKFILL WITH PEA GRAVELPER TANK MANUFACTURERSPECIFICATIONS. (TYP.)59'-8 3/4"1871" COND. LOOP TO SUMP1664" FRP RISER TO GRADE203DUAL FLOATHYDROSTATICMONITORINGSENSOR6HOME RUN TO BUILDING6189J-BOX4'-0" MAX. ONLY IFCONDITIONS PERMITAUNDERGROUND 6,000/20,000/ 6,000 SPLIT GAL TANK - PLAN VIEWSCALE: 1/4" = 1'-0"BUNDERGROUND 6,000/20,000/6,000 SPLIT GAL TANK - ELEVATION VIEWSCALE: 1/4" = 1'-0"AFT-3BFT-3CFT-4DFT-4AFT-3BFT-3CDAFT-3BFT-3EFT-4FFT-4AFT-3BFT-3CFT-5DFT-5AFT-3BFT-3EFAFT-3BFT-3AFT-6BFT-645°TYP.2" MIN.5-1/2" MAX.5"TANK GAUGE LOCATION48" DIA. TURBINE SUMP#SEE SHEET FT-1 FOR NOTES14MANUFACTURER SUPPLIED18"x8-3/4"x22' DEADMAN (TYP. OF 2)13131213121313131211102' MIN.101'-0" MIN. PEA GRAVELINSTALLED OVERCOMPACTED SOIL7109TRAPPER SCREEN (TYP.)STEEL STRIKER PLATE TYP. UNDER ALLOPENINGS W/ MANWAYS ON FIBERGLASS TANK(BY TANK MANUFACTURER)NOTE: INDICATES ITEMS FOUND ONMATERIALS LIST SHEETS FM-1 & FM-2#8"FT-5.1FT-5.1FT-5.1FT-5.13/26/2024 REVISED PER C.E.H. COMMENTS20K B206K DEF6K DIESEL5/3/2024 REVISED PER C.E.H. COMMENTS6/14/2024 REVISED PER C.E.H. COMMENTS8