My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONOTE:INDICATES ITEMS FOUND ON NOTE: b <br /> A. NOTES:UST ANCHORING p <br /> MATERIALS LIST SHEETS FM-1&FM-2 DEFLECTION MEASUREMENT BEFORE&AFTER 1. WHEN WORKING BELOW GRADE,EXTREME CARE MUST BE TAKEN TO ASSURE <br /> TANK INSTALLATION SHALL BE ACCORDING TO WORKMEN SAFETY.SLOPING AND SHORING SHALL BE PROVIDED TO COMPLY WITH <br /> MANUFACTURER'S REQUIREMENTS AND SHALL BE OSHA CONSTRUCTION INDUSTRY STANDARDS 29 CFR PART 1926 SUBPART P,OSHA <br /> WITHIN MANUFACTURER'S TOLERANCES.ALL STANDARDS-EXCAVATIONS:FINAL RULE OCTOBER 1,1989.HARD HATS SHALL BE <br /> 8"THICK,4000 PSI.FIBER INFORMATION SHALL BE COMPLETED AS PER THE WORN BY ALL WORKMEN OPERATING IN EXCAVATION OR WHERE OVERHEAD WORK <br /> 2 3 REINFORCED CONCRETE SLAB MANUFACTURER'S WARRANTY DOCUMENTATION. <br /> IS PROGRESSING. <br /> SEE SHEET FS-1 FOR SPECS. 2. TANK ANCHORING REQUIRED WHEN A HIGH WATER TABLE IS ENCOUNTERED OR IS <br /> ASPHALT&STONE AS SPECIFIED EXTEND CONTINUOUS ASPHALT AND STONE PER REQUIRED BY LOCAL REGULATION.CONSULT WITH OWNER'S REPRESENTATIVE. <br /> BY PROJECT SPECIFICATIONS FILTER FABRIC TO SLAB PROJECT SPECIFICATIONS 3. INSTALL DEADMAN ANCHORS PER TANK MANUFACTURERS INSTALLATION <br /> INSTRUCTIONS. <br /> 4. DIMENSIONS OF MANUFACTURER SUPPLIED DEADMAN FOR 10'DIA.30,000 GAL. <br /> .. .. <br /> TANK ARE 18"x8-3/4"x18'L,QTY:(4),10'DIA.32,000 GAL TANK ARE 18"X8-3/4"X181, <br /> QTY.L L AND 1 OF FIELD <br /> CO,QTY CONSTRUCTED <br /> 5. TOTAL LENGTH OF FIELD CONSTRUCTED DEADMAN IS MIN.12"GREATER THAN <br /> OVERALL LENGTH OF TANK. <br /> 6. EACH TANK REQUIRES DEADMAN ON EACH SIDE. <br /> \\\/x\ \\// 7. HOLD DOWN STRAPS ARE REQUIRED FOR 10,000,1 MANUFACTURER. <br /> &20,000 GALLON " <br /> NOTE:SLOPE SIDES OF TANK 1 ///// TANKS AS SPECIFIED AND SUPPLIED BY TANK MANUFACTURER. <br /> HOLE(USE OF SLOPING MUST \\/\ 8. LOCATE STRAPS ON RIBS WHERE INDICATED ON TANK. <br /> BE RECEIVE PRIOR APPROVAL \//\\ / / 9. FASTEN WIRE WITH AT LEAST THREE CLAMPS AROUND DEADMAN AND THROUGH <br /> ON INDIVIDUAL SITE BASIC \ THE END POINT OF THE HOLD DOWN STRAP.CLAMPS SHALL BE ALTERNATED 180" ARCO <br /> \ 15 15 V// 16 FILTER FABRIC <br /> FROM"BP')OR USE SHORING \/\\ � \\/ FROM EACH OTHER. <br /> FOR ALL TANK EXCAVATIONS //\\ 2'MIN. 10'-4" 3' 1 10'-4" 2'MIN. // 10. ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES.UNIFORMLY <br /> IN ACCORDANCE WITH OSHA \// // ' "3RD LIFT OF PEA GRAVEL TIGHTEN ALL STRAPS TO ACHIEVE EQUAL TENSION WITHOUT TANK DEFLECTION. BP WEST COAST PRODUCTS,LLC <br /> 8-0 <br /> 1926 SUBPART P,OSHA \ \ \\j/'qw TO TOP LIFT <br /> TANK MEASURE TANK DIAMETER BEFORE AND AFTER TIGHTENING STRAPS TO ENSURE <br /> STANDARDS-EXCAVATIONS; \//\ \//\/ NO TANK DEFLECTION. <br /> FINAL RULE OCTOBER 1,1989 7 8 13 \\\ \ 12. TURNBUCRE KLES:PE I HOOK TYPE-1--MUM R114"DIAMETER,JAW TYPE-314"DIAMETER,EYE <br /> TYPE-3/4"DIAMETER <br /> 13. COAT ALL EXPOSED STRAPS,CABLES,TURNBUCKLES,AND REINFORCING BARS <br /> WITH PITCHMASTIC. <br /> 12"2ND LIFT OF PEA GRAVEL 14. INSTALL USTs SO THAT TOP OF TANKS ARE AT SAME HEIGHT. <br /> 12"1ST LIFT OF PEA GRAVEL 15. IN UNSTABLE SOIL(AS DEFINED BY SOILS REPORT)THE DIMENSION MUST BE 4 FT. <br /> FROM BOTH SIDES AND ENDS(WITH FIBERGLASS TANKS) <br /> 12"BED 16. FILTER FABRIC(DUPONT TYPAR OR MIRAFI SOOX)IS REQUIRED FOR WET HOLE <br /> 2 3 4 5 5 <br /> 18" T MIN. OF HOLE WITH WIRE,ETC.SEAMS MUST BE LAPPED 1'MINIMUM. <br /> 4'-0"MAX TYP. NO. DATE REVISION DESCRIPTION <br /> V-0"MIN.PEA GRAVEL INSTALLED OVER IL 4 IN-ISSUEFILTER FABRIC ON BOTTOM&SIDES COMPACTED SOIL.IN WET HOLE INSTALLATIONS, <br /> OF TANK HOLE(WET HOLE ONLY) 16 7 INCREASE TO 18"MINIMUM PER MANUFACTURER'S zQ znizoz4 IS- <br /> RECOMMENDED <br /> RECOMMENDED INSTALLATION GUIDELINES. Q aznzoz4 REVISED PER C.E.H.COMMENTS <br /> 0 <br /> zil <br /> Zkl <br /> IL <br /> Zkl <br /> TANK ANCHORING zil <br /> ASCALE:1/4"=1'-O" io <br /> *NOTE: NOTE:CONTRACTOR TO USE ADDITIONAL <br /> CONTRACTOR SHALL BE HELD RESPONSIBLE FOR PROPER GALVANIZED FITTINGS AS REQUIRED TO MINIMIZE <br /> INSTALLATION&PREPARATION PER MANUFACTURERS BENDS IN FLEXIBLE CONNECTORS <br /> INSTRUCTIONS AND SHALL REINSTALL SUMPS IF HYDROSTATIC <br /> TESTING SHOWS LEAKING IN THIS AREA OF THE SUMP. <br /> # NOTE: <br /> SUMPS MUST BE ORIENTED SUCH THAT THE FACE OF THE INDICATES ITEMS FOUND ON MATERIALS LIST SHEETS FM-1& <br /> SUMP PANEL IS PARALLEL WITH ADJACENT TANK SUMP PANEL FM-2 <br /> IN ORDER TO ACHIEVE THE 45°ANGLES REQUIRED TO ROUTE O NOTES: <br /> THE PIPING WHILE MAINTAINING THE DESIRED 1. SLOPE CONCRETE AWAY FROM ALL MANHOLES 1"RISE OVER <br /> PERPENDICULAR ANGLE INTO THE SUMP, MINI HYDROSTATIC 217 12"RUN. <br /> SENSOR 2. FIBER REINFORCEMENT TO BE USED.PRE-MIX UNIFORMLY <br /> CONTRACTOR TO ADDITIONALLY GLASS WRAP&LAMINATE AT 34"LID O.D. THROUGHOUT CONCRETE. _ <br /> CONNECTION FOLLOWING CURING OF ADHESIVE.SPECIFIC 3. REINFORCING BARS TO BE NO LESS THAN 2"AND NO MORE <br /> SUMP ATTENTION MUST BE GIVEN TO SURFACE PREP AS TESTING x� �osEaA`��x.x"Ax <br /> FIBERGLASS PIPING,2"NOMINAL,BONDED TO 2 WIRE THAN 4"FROM SURFACE. <br /> SUMP OR UDC INNER WALL USING GASOLINE REQUIREMENTS WILL DETECT THE SMALLEST OF FLAWS.ALL FACTORY SUPPLIED TANK DESIGN DiscuiMER: <br /> SHIELDED MATERIALS MUST BE COMPATIBLE WITH GASOLINE,GASOLINE SUMP RESERVOIR 32-3/4"NECK O.D. 4. REINFORCE CONCRETE SLAB AROUND MANHOLE WITH BO <br /> COMPATIBLE EPDXY RESIN.BOTTOM OF PIPE TO CABLE WITH 15%MTBE(METHYL TERTIARY-BUTYL ETHER),OR GASOLINE \ REBAR 60"IN LENGTH.PLACE REBAR 6"FROM SIDES OF BOX. <br /> IN- <br /> BE IN CONTACT WITH LOWEST PART OF SUMP WITH 10%ETOH(ETHANOL).FIBERGLASS AND RESIN MUST 5. ONE 1"STANDARD MONITORING HOMERUN CONDUIT TO EACH <br /> OR UDC. EXTEND 1/2"BEYOND COVERAGE OF ADHESIVE. ' TANK.FOR STANDARD MONITORING DEVICES,LOOP <br /> 3 / CONTAINMENT SUMP SENSORS,PLLD,VAC SENSORS&TANK <br /> SUMP MONITOR LIQUID I / 1 GAUGE TO TANK INTERSTITIAL SENSOR LOCATION AND *�Ox "DTMEs.o ..x"o".,,�a"srs..x..roxR <br /> 202 SENSOR INSIDE HOLDER I� HOMERUN TO BLDG.PROVIDE SEAL-OFFS IN BUILDING&PRIOR <br /> p <br /> CONTRACTOR TO BOND UNISTRUT CHANNEL TO TO LEAVING HAZARDOUS AREA.ROUTE TO INTRINSICALLY DEVELOPMENT INFORMATION. <br /> HOLDER TO ALLOW FIBERGLASS PIPE TO CLEAR \ / \ / SAFE TROUGH IN BUILDING.CONDUITS SHALL CONTAIN ONLY <br /> SUMP COLLAR"LIP".CONTRACTOR TO USE / LOW VOLTAGE WIRING FOR SENSORS.ALL CONDUIT UNDERGROUND STORAGE <br /> GASOLINE-COMPATIBLE EPDXY TO BOND APEX OF TANK \ PENETRATIONS MUST BE MADE WITH ROBROY PVC COATED TANK STANDARDS <br /> SPACER TO SUMP AND PIPE.CONTRACTOR MAY to 30"LD. CONDUIT ONLY. ELEMENT TPO1 <br /> USE UNISTRUT,FIBERGLASS PIPE,OR ANY 6. PEA GRAVEL BACKFILL.ALL SUBSTITUTES MUST BE APPROVED <br /> OTHER EQUIVALENT MATERIAL THAT CAN SLIP ON RISER BY MANUFACTURER AND OWNER'S FIELD REPRESENTATIVE. V-15.0 2023 SERIES <br /> WITHSTAND ENVIRONMENT OF SUMP. ROUND BODY 7. PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A <br /> FIELD SEALED JOINT. EXTENSION 6"COMPACTED PEA GRAVEL BEDDING.PIPING SHALL NOT BE <br /> (ADHESIVE SUPPLIED W/KITUPPORTED BY BLOCKS,PLANKS,OR OTHER DEBRIS. <br /> ) \ 48"I.D.D TURBINE SIDE SUMP SENSORS TO BE MOUNTED 8. ALL ENTRIES TO BE PERPENDICULAR TO CONTAINMENT SUMP. SITEADDREss: <br /> BELOW APEX OF TANK,AT BOTTOM OF SUMP AT FIBERGLASS _��n OFFLINE INSTALLATION NOT PERMITTED. <br /> SIDE OF TANK WHERE PRODUCT PENETRATIONS TANK / \ / v° 9. REAM ALL RISERS FOR FULL PIPE BORE IF REQUIRED. 4607 S.AIRPORT WAY <br /> INTO SUMP ARE MADE AND BELOW LOWEST 10. INSTALL TANK ID MARKERS IN THE SPILL CONTAINMENT <br /> PENETRATION FITTING WITHIN SUMP AREA. <br /> FIBERGLASS SUMP MANHOLES.COVERS SHALL BE PRIMED AND PAINTED STOCKTON,CA 95206 <br /> 1 1 <br /> PRODUCT PIPING TO DISPENSERS,PRODUCT INSIDE TANK / 1 \ ACCORDING TO SPECIFICATIONS. <br /> PIPING CROSS CONNECTION BETWEEN SUMPS COLLAR LIP I \ 11. SECONDARY CONTAINMENT IS REQUIRED FOR ALL VENT AND <br /> AND SIPHON PIPING PENETRATIONS ARE UNISTRUT 1.SENSOR HOLDER STAGE II VAPOR RECOVERY PIPING,EXCEPT DEF VENT PIPING. <br /> DESIGNED TO ENTER THE SAME SIDE OF THE CHANNEL BONDED TO I 3/8"Xi/4"SS I 12. NOT USED. DESIONEDer: AAK AuwrvcEuoM: <br /> SUMP AS SHOWN.IF PRODUCT PENETRATION UNISTRUT CHANNEL BUSHING 13. LAYOUT TANKS&STAGE II VAPOR RECOVERY PIPING SUCH <br /> ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD I INSTALLED AT I COLLAR BONDED oz THAT THE STAGE II PIPING DRAINS&ENTERS INTO REGULAR O.Dsr. REFM. <br /> CONDITIONS,THEN DUAL SENSORS AT TURBINE I FACTORY TO TANK 1 UNLEADED TANK FIRST W/3"CONNECTIONS,AND CONTINUES wN sr. TAF ALLIANCE PM. <br /> SUMP WILL BE REQUIRED TO BE INSTALLED. 2.SENSOR HOLDER I 3"TO OTHER TANKS. ION RRmEcr rvo <br /> AND UNISTRUT FACTORY LAY-UP 14. CONCRETE SHALL BE THICKENED AT THE THE FILL SUMPS . <br /> CHANNEL BONDED / DOWN TO BELOW THE TOP OF CONTAINMENT OF THE DOUBLE VERSION CA-4795 <br /> TO SUMP WALL.DO I WALL SUMP AS REQUIRED.DIMENSION OF SLAB THICKNESS <br /> NOT PENETRATE I v oRAwINGTInE: <br /> JOINT DETAILS <br /> � VARIES WITH SITE CONDITIONS. <br /> SUMP! I \ / I 15. CROSSING FLEX CONNECTORS MUST MAINTAIN A MINIMUM OF UST ANCHORING <br /> 1 2 INCH CLEARANCE OR THE USE OF AN ANTI CHAFING DEVICE AND SUMP DETAILS <br /> J I MUST INSTALLED. <br /> 16. OVERFLOW PROTECTION:UST OVERFLOW COMPLIANCE IS <br /> ACHIEVED BY USE OF OVERFLOW PREVENTION DROP TUBE <br /> FLAPPER VALVE SET AT 95%AND IS IN ACCORDANCE WITH SHEET NO <br /> 48"DIA.POLYGON SUMP BODY 1/4"DRAIN/TEST BUSHING. FEDERAL AND STATE GUIDELINES FOR UST OVERFILL <br /> SUMP SENSOR HOLDER (8-20"X19"FLAT PANELS) FACTORY INSTALLED REQUIREMENTS. <br /> 1 SCALE:1"=T-O" DOUBLE WALL TURBINE SUMP RISER AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO FT 3 <br /> SCALE:1"=1'-O" THE VEEDER ROOT AUTOMATIC TANK GAUGE SYSTEM.THE <br /> MONITORING SYSTEM PROVIDES AN AUDIBLE AND VISUAL <br /> ALARM WHEN THE TANK(S)ARE FILLED TO THE 90%LEVEL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.