Laserfiche WebLink
For your convenience, I added boxes around the tank sizes and weights on the buoyancy calculations and <br /> tank cut sheets. <br /> On the appLication for UST Tank Installation Permit, page 3 of 8, needs the Hazardous waste Certificate" <br /> and Workers Comp#".See snippet. <br /> Inc <br /> -�Abwffjr- <br /> 21r-S LupaN nf.RAr-m-1-10 rCIFE&VA,CA,9524Z <br /> S15Xk1[WFfMD0PL <br /> No OLLL"Tit <br /> PLO!1111110100111"NA01 @ATM <br /> 0 <br /> n, --n <br /> The project does not include hazardous waste removal.The workers comp#has been added to the UST <br /> Tank Installation Permit. I have also attached the workers compensation document. <br /> Page 7 of 8 of the appLication, Section G,you have listed the 71 SO-41 OC-EVR but on the FIVI-11 page there <br /> are two Overfill Prevention. Please cLarify which overfill prevention you will be using. <br /> 4-A 11'3'vkoP TUBE wiovEm ILL PREVEN I ION VALVE "QPW*hAODE <br /> 4'x1G,5'E)RCii E W 0VERF1L PREVENTION VALVE <br /> BP W1 JACK SCREVY LOCK DOWN DEVICE *Opvr MODE, <br /> Wi SHORT FACE SEAL ADAPTER -OPW'MODE <br /> W1 TANK BOTTOM PROTECTOR -OPW-MODE <br /> W1 INSTALLATICKINI TOOL-PER CAR13 EVR EXEC ORDER V-R-102 -()PW-MODE <br /> On sheet FM-1, he 4"x13' drop tube has been eliminated and the 4"x19' drop tube w/overfill prevention <br /> valve part number has been updated to 71SO-41C. <br /> On 7 of 8 of the application, Section G,the part number has been updated to 71SO-410C to match FIVI-1. <br /> • Page 8 of 8, Section 1, aLarm panel.needs cLarification.The FIVI-2 page list a different model.number. <br /> On FIVI-2, part number 200 has been updated to 860091-302. Page 8 of 8 Section I alarm panel model number <br /> has been updated to 860091-302 to match FIVI-2. <br /> • FT-11, section B, needs cLarification forthe drop tube. Per Xerxes cut sheet, Service Fitting on Flat#25 is <br /> for vent onLy." <br /> On FT-1, section 13,the drop tube has been switched with the vapor/vent connection.The "Service Fitting on Flat <br /> #25" is now a vent connection per the Xerxes cut sheet. <br /> On FT-5, section A& B, has been updated to be a regular only fill sump. <br /> Sheet FT-5.1 has been added for the new Premium Fill sump section A& B. <br /> • FT-2, section A&B needs cLarification for the drop tube/fill risers. Per Xerxes cut sheet,the pLacement of <br /> the drop tubes should not be place in those locations. <br /> 4 <br />