Laserfiche WebLink
14 <br /> <br /> <br />5. Page 4 of the revised plans does not have a sheet number and is not clear what details it was describing on the 3 <br />compartment tank. Zoomed in, nothing is legible. <br /> <br />6. Sheet T&L4 <br />a. Detail A3 for 87 gas turbine sump does not show the vent piping being vacuum monitored <br />b. The 91 STP sump shows vacuum monitoring for product, vapor and vent. This does not match your <br />vacuum zones. Per your vacuum zones, the 91 STP will have a vacuum kit monitoring 91 product ad 91 <br />vent. T&L1 does not show any vapor piping coming out of the 91 STP sump. <br />7. Sheet T&L5 <br />a. Note 9 states that the vapor recovery piping enters the 87 unleaded tank and then continues to the <br />other tanks. What other tanks does this connect to? The vapor recovery piping per T&L1 only goes to <br />the 87 STP sump. <br />b. Note 16 states to refer to the diesel UST installation drawing for stand-alone UST or as an extension of <br />this design. What does this mean? The diesel tank in the plans are part of a compartmentalized tank.