My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR0543692
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:14:30 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR0543692
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024830
FACILITY_NAME
ARCO
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746013
CURRENT_STATUS
Temp inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> <br />c. #813 is listed at each UDC. #813 is a PLLD mount. Are you installing leak detectors in each UDC? <br />Alternatively, you don’t have any of these mounts located where leak detectors are shown (#812) in the <br />turbine sumps. <br />d. #823 is listed at each tank sump and UDC. This is a sensor kit (330020-536) that contains a 304 and 208 <br />sensors. But you have these sensors listed separately on sheet T&L7 and in this diagram (#806 and #815) <br />as well as this kit (#823). Are you installing 2 sets of 304 and 208? You do not have #315 listed at the <br />UDCs but the quantity listed for this 208 sensor is 23, but there are only 11 listed in the diagram. <br />e. #808 are probes shown in the fill sumps. Probes are typically not located here. <br />f. #808 is shown 4 times on this diagram (at each fill sump) but you only have a quantity of 2 listed on the <br />materials sheet (T&L7). Ensure this matches the correct amount to be installed throughout your plan. <br />g. #812 is shown 4 times on the diagram (at each turbine sump) but you only have a quantity of 1 listed on <br />the materials sheet (T&L7). Ensure this matches the correct amount to be installed throughout your <br />plan. <br />h. Does the 91 product piping come out of both the 91 STP sump and 91 fill sump? As seen in purple <br />below. Or is that dark dashed line an 87 product line based on one of the legends, if so, why is it <br />connected to the 91 STP sump? There are two different legends on this page. See snippets below.
The URL can be used to link to this page
Your browser does not support the video tag.