24 <br /> <br />i. Item 2 on the list points at the 30k tank as a “NEW UST” but not at the 32k tank. Is the 32k tank not a <br />new UST? <br />j. Item 8 on the list states that there will be 6 #300 dispensers but there is only a quantity of 4 lists on the <br />materials sheet (T&L7). The Shield, Harper & Co Equipment List (4/14/2022) shows 8 UDCs. Ensure this <br />matches the correct amount to be installed throughout your plan. <br />k. #833 is shown in the store but there is no #833 on the T&L7. What is this item? <br />l. Why is B20 piping 4” over 3” instead of 3” over 2” like the other diesel? <br />m. Note 7 shows 4” over 3” and 3” over 2” for vapor piping length. Why are there 2 different sets? <br />n. Vacuum zones: <br /> i. There is a table with vacuum zones and there is a list of vacuum <br />zones on top of the page. What is the correct vacuum zone set up. <br /> ii. In the table of vacuum zones, only 4 zones are listed. Just verifying <br />that you only have one vacuum pulling from each turbine that is monitoring every line (Zone 1 <br />monitoring 87, vapor, 87 vent & 87 chase, Zone 2 monitoring 91, 91 vent & 91 chase, Zone 3 <br />monitoring diesel, diesel vent & diesel chase, Zone 4 monitoring B20, B20 vent, B20 chase). <br />Please show how these lines are all connected. <br />OR does your zone set up in the table actually mean: <br />Vacuum Kit 1 (87 STP) <br />330020-485 3 lines <br />Zone 1 87 product <br />Zone 2 Vapor recovery <br />Zone 3 87 vent, 87 fill-STP chase <br />Vacuum Kit 2 (91 STP) <br />330020-480 2 lines <br />Zone 4 91 product <br />Zone 5 91 vent, 91 fill-STP chase <br />Zone 6 Diesel product