Laserfiche WebLink
33 <br />a. Check off a billing address <br />b. Enter a title on the APPLICANT SIGNATURE <br />2. On the APPLICATION FOR UNDERGROUND STORAGE TANK INSTALLATION PERMIT: <br />a. Page 3 of 8 - Enter information for HAZARDOUS WASTE CERTIFICATE <br />b. Page 3 of 8 - In the table about the tank information, “See Attached Sheet” is written but a sheet was <br />not attached <br />c. Pages 6 of 8, 7 of 8 and 8 of 8 were not completed <br />3. An ELD work plan specific for this project was not submitted. The submitted document was just an explanation <br />of ELD testing. <br />4. Certifications <br />a. Missing certification for Xerxes <br />b. Missing certification for Veeder Root <br />c. Received certifications for CSI tanks and sump installation but CSI tanks were not listed in the plan. Are <br />you planning on installing CSI tanks/sumps? <br />d. Received certifications for Hose Master flex connects but it looks like Franklin Fueling FireFlex is being <br />used. Are you planning on installing Hose Master? <br />5. On sheet number CO <br />a. Scope of Work #14 states that the tank slab of concrete will be 12” thick but the buoyancy calculations <br />have the safety factor calculated at 8” thick. (Sheet T&L3, T&L4 also has 12” slab of concrete shown) <br />b. Drawing Index shows two E2s but there is one E2 and an E3 <br />6. On sheet number T&L1 <br />a. The DEF turbine sump does not have a 304 sensor listed like all the other sumps. Will this sump be <br />hydrostatically monitored like the other tank sumps? <br />b. There appears to be a square sump between the 87 fill sump and turbine sump. Will you have a <br />transition sump between them? If so, what will be monitoring this sump? See snippet below with square <br />sump highlighted. There is no detail showing another sump on T&L4