My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> �OR <br /> 0 a <br /> coo <br /> 24K -87 <br /> VACU CHA UN <br /> (,jn <br /> c. #813 is listed at each UDC.#813 is a PLILD mount.Are you installing leak detectors in each UDC? <br /> Alternatively,you don't have any of these mounts located where leak detectors are shown (#812) in the <br /> turbine sumps. <br /> d. #823 is listed at each tank sump and UDC.This is a sensor kit that contains a 304 and 208 sensors. But <br /> you have these sensors listed separately in the materials list and in this diagram (#806 and#815) as well <br /> as this kit (#823).Are you installing 2 sets of 304 and 208?You do not have#315 listed at the UDCs but <br /> the quantity listed for this 208 sensor is 23, but there are only 11 listed in the diagram. <br /> e. #808 are probes shown in the fill sumps. Probes are typically not located here. <br /> f. #808 is shown 4 times on this diagram (at each fill sump) but you only have a quantity of 2 listed on the <br /> materials sheet (T&I-7). Ensure this matches the correct amount to be installed throughout your plan. <br /> g. #812 is shown 4 4 times on the diagram (at each turbine sump) but you only have a quantity of 1 listed <br /> on the materials sheet (T&I-7). Ensure this matches the correct amount to be installed throughout your <br /> plan. <br /> h. Item 2 on the list points at the 30k tank as a "NEW UST" but not at the 32k tank. Is the 32k tank not a <br /> new UST? <br /> i. Item 8 on the list states that there will be 6#300 dispensers but there is only a quantity of 4 lists on the <br /> materials sheet (T&I-7). Ensure this matches the correct amount to be installed throughout your plan. <br /> j. #833 is shown in the store but there is no#833 on the T&I-7. What is this item? <br /> k. Note 7 shows two "D" pipe lengths but doesn't specify which is for B20 and which is for B. It also <br /> indicates one is 4" over 3" at 380",this is measured in inches and not feet?Why is one diesel 3" over 2" <br /> and the other 4" over 3"? <br /> 1. There is no chase piping being monitored shown in the vacuum zones <br /> 7. Sheet T&L2 <br /> 1. Detail C6 <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.