Laserfiche WebLink
17 <br /> �OR <br /> 0 a <br /> coo <br /> 24K -87 <br /> VACU CHA UN <br /> (,jn <br /> c. #813 is listed at each UDC.#813 is a PLILD mount.Are you installing leak detectors in each UDC? <br /> Alternatively,you don't have any of these mounts located where leak detectors are shown (#812) in the <br /> turbine sumps. <br /> d. #823 is listed at each tank sump and UDC.This is a sensor kit that contains a 304 and 208 sensors. But <br /> you have these sensors listed separately in the materials list and in this diagram (#806 and#815) as well <br /> as this kit (#823).Are you installing 2 sets of 304 and 208?You do not have#315 listed at the UDCs but <br /> the quantity listed for this 208 sensor is 23, but there are only 11 listed in the diagram. <br /> e. #808 are probes shown in the fill sumps. Probes are typically not located here. <br /> f. #808 is shown 4 times on this diagram (at each fill sump) but you only have a quantity of 2 listed on the <br /> materials sheet (T&I-7). Ensure this matches the correct amount to be installed throughout your plan. <br /> g. #812 is shown 4 4 times on the diagram (at each turbine sump) but you only have a quantity of 1 listed <br /> on the materials sheet (T&I-7). Ensure this matches the correct amount to be installed throughout your <br /> plan. <br /> h. Item 2 on the list points at the 30k tank as a "NEW UST" but not at the 32k tank. Is the 32k tank not a <br /> new UST? <br /> i. Item 8 on the list states that there will be 6#300 dispensers but there is only a quantity of 4 lists on the <br /> materials sheet (T&I-7). Ensure this matches the correct amount to be installed throughout your plan. <br /> j. #833 is shown in the store but there is no#833 on the T&I-7. What is this item? <br /> k. Note 7 shows two "D" pipe lengths but doesn't specify which is for B20 and which is for B. It also <br /> indicates one is 4" over 3" at 380",this is measured in inches and not feet?Why is one diesel 3" over 2" <br /> and the other 4" over 3"? <br /> 1. There is no chase piping being monitored shown in the vacuum zones <br /> 7. Sheet T&L2 <br /> 1. Detail C6 <br /> 34 <br />