My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR0543692
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:14:30 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR0543692
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024830
FACILITY_NAME
ARCO
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746013
CURRENT_STATUS
Temp inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> <br />c. #813 is listed at each UDC. #813 is a PLLD mount. Are you installing leak detectors in each UDC? <br />Alternatively, you don’t have any of these mounts located where leak detectors are shown (#812) in the <br />turbine sumps. <br />d. #823 is listed at each tank sump and UDC. This is a sensor kit that contains a 304 and 208 sensors. But <br />you have these sensors listed separately in the materials list and in this diagram (#806 and #815) as well <br />as this kit (#823). Are you installing 2 sets of 304 and 208? You do not have #315 listed at the UDCs but <br />the quantity listed for this 208 sensor is 23, but there are only 11 listed in the diagram. <br />e. #808 are probes shown in the fill sumps. Probes are typically not located here. <br />f. #808 is shown 4 times on this diagram (at each fill sump) but you only have a quantity of 2 listed on the <br />materials sheet (T&L7). Ensure this matches the correct amount to be installed throughout your plan. <br />g. #812 is shown 4 4 times on the diagram (at each turbine sump) but you only have a quantity of 1 listed <br />on the materials sheet (T&L7). Ensure this matches the correct amount to be installed throughout your <br />plan. <br />h. Item 2 on the list points at the 30k tank as a “NEW UST” but not at the 32k tank. Is the 32k tank not a <br />new UST? <br />i. Item 8 on the list states that there will be 6 #300 dispensers but there is only a quantity of 4 lists on the <br />materials sheet (T&L7). Ensure this matches the correct amount to be installed throughout your plan. <br />j. #833 is shown in the store but there is no #833 on the T&L7. What is this item? <br />k. Note 7 shows two “D” pipe lengths but doesn’t specify which is for B20 and which is for B. It also <br />indicates one is 4” over 3” at 380”, this is measured in inches and not feet? Why is one diesel 3” over 2” <br />and the other 4” over 3”? <br />l. There is no chase piping being monitored shown in the vacuum zones <br />7. Sheet T&L2 <br />1. Detail C6
The URL can be used to link to this page
Your browser does not support the video tag.