Laserfiche WebLink
i. #400 is listed in C6 detail but there is no#400 on the materials list <br /> T&L7. Ensure your materials sheet T&L7 corresponds with the numbers listed throughout your <br /> plan. <br /> ii. Detail C6 has#209 pointing to what looks like a UDC but T&L7 <br /> shows#209 as single port spill platform. <br /> iii. What is this tube and where does it lead to? See highlighted item in <br /> the snippet below <br /> :�IZ2.W <br /> TtST PORT <br /> b. #400 is also listed on detail A2 and the penetration details but it is not listed on the materials sheet <br /> T&L7. <br /> 8. Sheet T&L3 <br /> 1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br /> in the fill sumps. Ensure this is cohesive throughout your plan. <br /> 2. Detail F) and DI show the hydrostatic sensor as#804 but#804 is shown on T&L7 as barbed fitting <br /> 3. Detail D1 shows item #403 near piping in the UDC but this#402 is shown on T&L& as a dispenser hose <br /> 9. Sheet T&L4 <br /> 1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br /> in the fill sumps. Ensure this is cohesive throughout your plan. <br /> 2. Detail A3 and A5 shows#400 is listed on this sheet but is not listed on the materials sheet T&L7 <br /> 3. #217 is shown pointing to piping but on the materials sheet T&L7#218 is shown as a containment box <br /> 10. Sheet T&L5 <br /> 1. This sheet refers to a different materials list sheet number that is not included in the plans <br /> 35 <br />