My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. #400 is listed in C6 detail but there is no#400 on the materials list <br /> T&L7. Ensure your materials sheet T&L7 corresponds with the numbers listed throughout your <br /> plan. <br /> ii. Detail C6 has#209 pointing to what looks like a UDC but T&L7 <br /> shows#209 as single port spill platform. <br /> iii. What is this tube and where does it lead to? See highlighted item in <br /> the snippet below <br /> :�IZ2.W <br /> TtST PORT <br /> b. #400 is also listed on detail A2 and the penetration details but it is not listed on the materials sheet <br /> T&L7. <br /> 8. Sheet T&L3 <br /> 1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br /> in the fill sumps. Ensure this is cohesive throughout your plan. <br /> 2. Detail F) and DI show the hydrostatic sensor as#804 but#804 is shown on T&L7 as barbed fitting <br /> 3. Detail D1 shows item #403 near piping in the UDC but this#402 is shown on T&L& as a dispenser hose <br /> 9. Sheet T&L4 <br /> 1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br /> in the fill sumps. Ensure this is cohesive throughout your plan. <br /> 2. Detail A3 and A5 shows#400 is listed on this sheet but is not listed on the materials sheet T&L7 <br /> 3. #217 is shown pointing to piping but on the materials sheet T&L7#218 is shown as a containment box <br /> 10. Sheet T&L5 <br /> 1. This sheet refers to a different materials list sheet number that is not included in the plans <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.