My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR0543692
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:14:30 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR0543692
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024830
FACILITY_NAME
ARCO
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746013
CURRENT_STATUS
Temp inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35 <br /> i. #400 is listed in C6 detail but there is no #400 on the materials list <br />T&L7. Ensure your materials sheet T&L7 corresponds with the numbers listed throughout your <br />plan. <br /> ii. Detail C6 has #209 pointing to what looks like a UDC but T&L7 <br />shows #209 as single port spill platform. <br /> iii. What is this tube and where does it lead to? See highlighted item in <br />the snippet below <br /> <br />b. #400 is also listed on detail A2 and the penetration details but it is not listed on the materials sheet <br />T&L7. <br />8. Sheet T&L3 <br />1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br />in the fill sumps. Ensure this is cohesive throughout your plan. <br />2. Detail F) and D1 show the hydrostatic sensor as #804 but #804 is shown on T&L7 as barbed fitting <br />3. Detail D1 shows item #403 near piping in the UDC but this #402 is shown on T&L& as a dispenser hose <br />9. Sheet T&L4 <br />1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br />in the fill sumps. Ensure this is cohesive throughout your plan. <br />2. Detail A3 and A5 shows #400 is listed on this sheet but is not listed on the materials sheet T&L7 <br />3. #217 is shown pointing to piping but on the materials sheet T&L7 #218 is shown as a containment box <br />10. Sheet T&L5 <br />1. This sheet refers to a different materials list sheet number that is not included in the plans
The URL can be used to link to this page
Your browser does not support the video tag.