Laserfiche WebLink
35 <br /> i. #400 is listed in C6 detail but there is no #400 on the materials list <br />T&L7. Ensure your materials sheet T&L7 corresponds with the numbers listed throughout your <br />plan. <br /> ii. Detail C6 has #209 pointing to what looks like a UDC but T&L7 <br />shows #209 as single port spill platform. <br /> iii. What is this tube and where does it lead to? See highlighted item in <br />the snippet below <br /> <br />b. #400 is also listed on detail A2 and the penetration details but it is not listed on the materials sheet <br />T&L7. <br />8. Sheet T&L3 <br />1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br />in the fill sumps. Ensure this is cohesive throughout your plan. <br />2. Detail F) and D1 show the hydrostatic sensor as #804 but #804 is shown on T&L7 as barbed fitting <br />3. Detail D1 shows item #403 near piping in the UDC but this #402 is shown on T&L& as a dispenser hose <br />9. Sheet T&L4 <br />1. The detail shows the probe (#808) located in the turbine sump but on sheet T&L1 the probes are shown <br />in the fill sumps. Ensure this is cohesive throughout your plan. <br />2. Detail A3 and A5 shows #400 is listed on this sheet but is not listed on the materials sheet T&L7 <br />3. #217 is shown pointing to piping but on the materials sheet T&L7 #218 is shown as a containment box <br />10. Sheet T&L5 <br />1. This sheet refers to a different materials list sheet number that is not included in the plans