50 <br />15. T&L6, Need vacuum communication details. Added to details EHD: end-of-the-line vacuum communication <br />provisions couldn’t be located on UDC (T&L6), please point them out. <br />16. Bravo deflector plates are proposed on T&L6, submit bravo cut sheet and installation <br />information and indicate on plans how they will be installed. Revised to tank manufacturer. EHD: corrected, per <br />plans no deflector plates will be installed, if they will be installed- provide the installation details. <br />17. No chaise piping is shown to 20K diesel fill sump for vent piping run to vent transition sump. <br />No chaise piping is shown for this tank on T&L1, update all necessary sheets as well as vacuum zone <br />details, piping length and volumes. See T&L1 and tanks sections. EHD: corrected. <br />18. It’s unclear if the master/ satellite piping is VPH-monitored double wall piping. Provide a <br />revision that illustrates, that master/ satellite dispenser piping is double wall and VPH monitored. No monitoring <br />details or vacuum hose connections are shown inside the UDCs x-sections for master/satellite dispensers. Update <br />vacuum zones to include pipe lengths and volume details. <br />Revised the details to show this. YES THEY ARE MONITORED EHD: corrected. <br /> <br />19. Not all parts on the list parts and their diamond reference numbers on each respective plan <br />sheet match across the plans. For example, part 402 listed multiple times on T&L2 and appears to <br />point to a Bravo sump penetration, is listed as Fire Flex on the parts list located on page T&L7. To <br />avoid any plan review delays, ensure that all parts lists are accurate on the future submittals (pages <br />T&L7 and T&L7.1) and reference accurate parts on all the plan sheets. Done <br />EHD: some issues are still observed with this item. The following list is not all-inclusive and some other issues may <br />exist with the parts list reference system, here are some of the examples. Part number 823 (on the parts list) is <br />listed as 23 each, this part is a combination of 806 and 815 parts for a complete 823 assembly. However 806 part is <br />also listed separately as 23 each as well as part 815 listed at 23 each- please clarify how many of these will be <br />installed. Part 400 is listed on several plan sheets, but not included on the parts list. Please provide an explanation <br />on part 209 “single port spill platform” installed on the vent sump. Three parts 218 (vent sumps containment <br />boxes) are listed on the parts list, but only one vent sump is proposed on the plans. Part 229 on sheet T&L3 points <br />to the overfill prevention drop tube, part 229 on parts lists is identified as a manhole cover. Also, 6 Wayne ovation <br />dispensers are listed on the parts list (parts 300 and 302), however, based on plans 8 dispensers will be installed on <br />the car side. T&L1 lists 6 of part 300. In the interest of expediency and to eliminate future revision requests, please <br />review all the parts on the parts list and their references on all plan sheets and correct all the discrepancies, not <br />only those listed above. <br /> <br />20. Please confirm that no ball floats are proposed on these plans. Effective October 1, 2018,