was not addressed with 8/11/2023 submittal, however, It appears that some revised sheets were submitted on <br /> 10/2/2023 and will be reviewed. <br /> 5. Identify smart sensor locations on T&L1 sheet See sheet T&L1. EHD: sensors were identified, however, there are <br /> some discrepancies between the listed sensors and the parts list. Revised sheets were received on 10/2/2023 and <br /> will be reviewed. See below for examples of these discrepancies. <br /> 6. Page T&L2 indicates that if people are entering the excavation OSHA notification and a <br /> permit is required. Please submit this permit copy for the tank set and anchoring work- if not <br /> available yet, this must be submitted before scheduling tank set inspection. Same page detail C6- <br /> "1/4"fuel hose capped"—clarify if this is a fuel hose or a vacuum hose. Also on C6 detail "opening <br /> through primary wall"—no openings through the primary wall are allowed. Contractor will do this. EHD: Still need. <br /> 7. Identify the means to check communication for vacuum monitoring on piping secondary <br /> containment on page T&L2, UDC detail. See details rHD: corrected. <br /> 8.T&L3, detail 5, and T&L4-sump liquid sensor is not shown at the lowest sump point Revised location EHD: <br /> corrected. <br /> 9. Provide cut sheets for tank sumps and penetrations (including electrical) Oand for all UDC <br /> and Vent sump penetrations, leak detectors, overfill. See attached EHD: some cut sheets were provided but some <br /> are still missing, like tank sumps, vent sump, all UDC etc. For example, 131000 cut sheet was included for UDCs, <br /> however, the UDC part number listed on the plans doesn't match the provided UDC cut sheet. Please provide cut <br /> sheets for all the parts listed on the parts list. <br /> 10. The provided parts order list shows 2 tanks with 2 compartments each, plans show two compartment and <br /> three-compartment tanks, clarify and send in the corrected parts order list Revised parts list tanks, 100, 103 see <br /> T&L7 and 7.1 EHD: corrected. <br /> 11. Provide installer/tester certifications for FE Petro and Flex-ing (Fireflex) When we have a contractor EHD: still <br /> need this. <br /> 12. Provide B-20 compatibility information for all components in contact with B-20 See attached sheets. EHD: it's <br /> unclear where this documentation is included, please provide a separate file titled compatibility. <br /> 13. T&L4,the 6K/24K fill sump on 24K tank chaise penetration is not located at sump wall but is <br /> located inside the sump. Also, 6K super tank fill sump has an unlabeled penetration and pipe with <br /> what appears to be an electrical connection that terminates at the bottom of the sump. Revised details EHD: <br /> corrected. <br /> 14. T&L4, details A3 and A4 don't show chaise lines Added line. EHD: corrected. <br /> 49 <br />