Laserfiche WebLink
49 <br />was not addressed with 8/11/2023 submittal, however, It appears that some revised sheets were submitted on <br />10/2/2023 and will be reviewed. <br />5. Identify smart sensor locations on T&L1 sheet See sheet T&L1. EHD: sensors were identified, however, there are <br />some discrepancies between the listed sensors and the parts list. Revised sheets were received on 10/2/2023 and <br />will be reviewed. See below for examples of these discrepancies. <br />6. Page T&L2 indicates that if people are entering the excavation OSHA notification and a <br />permit is required. Please submit this permit copy for the tank set and anchoring work- if not <br />available yet, this must be submitted before scheduling tank set inspection. Same page detail C6- <br />“1/4” fuel hose capped” – clarify if this is a fuel hose or a vacuum hose. Also on C6 detail “opening <br />through primary wall” – no openings through the primary wall are allowed. Contractor will do this. EHD: Still need. <br />7. Identify the means to check communication for vacuum monitoring on piping secondary <br />containment on page T&L2, UDC detail. See details EHD: corrected. <br />8. T&L3, detail 5, and T&L4- sump liquid sensor is not shown at the lowest sump point Revised location EHD: <br />corrected. <br />9. Provide cut sheets for tank sumps and penetrations (including electrical) 0and for all UDC <br />and Vent sump penetrations, leak detectors, overfill. See attached EHD: some cut sheets were provided but some <br />are still missing, like tank sumps, vent sump, all UDC etc. For example, B1000 cut sheet was included for UDCs, <br />however, the UDC part number listed on the plans doesn’t match the provided UDC cut sheet. Please provide cut <br />sheets for all the parts listed on the parts list. <br />10. The provided parts order list shows 2 tanks with 2 compartments each, plans show two compartment and <br />three-compartment tanks, clarify and send in the corrected parts order list Revised parts list tanks , 100, 103 see <br />T&L7 and 7.1 EHD: corrected. <br />11. Provide installer/tester certifications for FE Petro and Flex-ing (Fireflex) When we have a contractor EHD: still <br />need this. <br />12. Provide B-20 compatibility information for all components in contact with B-20 See attached sheets. EHD: it’s <br />unclear where this documentation is included, please provide a separate file titled compatibility. <br />13. T&L4, the 6K/24K fill sump on 24K tank chaise penetration is not located at sump wall but is <br />located inside the sump. Also, 6K super tank fill sump has an unlabeled penetration and pipe with <br />what appears to be an electrical connection that terminates at the bottom of the sump. Revised details EHD: <br />corrected. <br />14. T&L4, details A3 and A4 don’t show chaise lines Added line. EHD: corrected.