Laserfiche WebLink
RE: SR0083837 - 4607 Airport Way <br /> Alex Korek <Alex.Korek@diamondzengineering.com> <br /> Wed 6/12/2024 2:19 PM <br /> To:Saetern, Kristina Gaen (EHD] <ksaetern@sjgov.org> <br /> Cc:Gurkamal Dhaliwal <g.dhaliwal@norcaloffice.com>;s.mann@norcaloffice.com <s.mann@norcaloffice.com> <br /> 0 1 attachments (7 MB) <br /> BP Arco-Airport Stockton,CA-Revised Per CEH Comments- 2024-06-12.pdf,- <br /> Good Afternoon Kristina, <br /> Per our conversation earlier today, I have updated the drawings and have responses to the comments below in GREEN. <br /> Thank you, <br /> Alex Korek <br /> Diamond Z Engineering, Inc. <br /> 5670 State Road-Cleveland, OH 44134 <br /> (440) 842-6501 (Office) <br /> (440) 596-8523 (Cell) <br /> From: Saetern, Kristina Gaen [EHD] <ksaetern@sjgov.org> <br /> Sent:Tuesday,June 11, 2024 11:52 AM <br /> To: Alex Korek<Alex.Korek@diamondzengineering.com>; s.mann@norcaloffice.com <br /> Cc: Gurkamal Dhaliwal <g.dhaliwal@norcaloffice.com> <br /> Subject:SR0083837 -4607 Airport Way <br /> Hello, <br /> After reviewing the plans, we've noticed there are multiple ball valves in the plans. Please remove all ball valves on the vacuum zone and the <br /> rest of the plans. <br /> We also, had concerns with the wiring (highlighted in yellow) of the vacuum monitoring on multiple detail drawings. Can you confirm that all <br /> the wiring are to be install in this manner? If so, please provide a written statement. <br /> On sheet FT-4, all details have been updated to remove the ball valves. <br /> On sheet FT-4, all details have been updated to add tees to display the vacuum tubing connecting to the vacuum chase piping secondary and <br /> passing through the chase pipe. <br /> All of the vacuum tubing will be installed per the plans attached. <br />