My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2026 9:47:37 AM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE REGULAR AND PREMIUM <br />STP SUMPS WILL BE IDENTICAL <br />2" INSIDE 3' FRP PIPE 70 FILL SUMP 142 148 <br />2" INSIDE 3' D.W. FRP BONDED ENTRY <br />FITTING W! TEST PORT d PLUG 126 <br />2' CAP. DRILL HOLES IN END AN INSTALL 183 <br />GROMMETS FOR TUBING PASS THROUGH <br />VEEDEP.-ROOT.t GPH I <br />\GNOSTRICTIVE PROBE TANK LEVEL <br />'ROBE WITILS CAP 6 RING. OVERFILL 204 203 <br />1LARM SET O 60% CAPACITY, USE 4" I. <br />FLOAT IN INSTALL KIT I <br />3 SENSOR NO -TANK FOR REGULAR OR 2 <br />SENSOR -NO TANK VACUUM SENSOR <br />ASSEMBLY KIT W/ MOUNTING BRACKET <br />HP VARIABLE SPEED TURBINE W/3 <br />iPH ELECTRONIC LEAK DETECTION <br />WJ SIPHON PORT FOR VACUUM <br />SOURCE <br />NOTE: THE LAST 2 FEET <br />(MINIMUM) OF CONDUITS THAT <br />ENTER THE DOUBLE WALL SUMP <br />SHALL BE PVC COATED RIGID. <br />CONDUIT LOOP FROM FILL SUMP <br />197 SENSORS (ROBROY THROUGH <br />SUMP ONLY) <br />i <br />\124�' <br />1" FRP BONDED ENTRY <br />FITTING <br />(T'fP.) <br />4Q' DOUBLE YJALL BRINE <br />MONITORED SUMP <br />�' '' t � 1• CONDUIT HOM'eRUN TO <br />v 1 I 187 BLDG, TURBINE POWER <br />R, <br />LOOP VACUUM TUBING FROM -'� I <br />1 <br />PRODUCT PIPING TO VAC SEDJSOR lI <br />2" INSIDE 3" D.W. FRP BONDED ENTRY FITTING WJ TEST PORT & 128 <br />VACUUM TUBING LOOPED TO VAC SENSOR ASSEMBLY (TYP,) <br />REGULAR AND PREMIUM STP SUMP -PLAN <br />2" FLEX CONNECTOR <br />147 2' BELLxMALE ADAPTER (TYP.) <br />2° INSIDE 3" FRP PRODUCT <br />142 14B MANIFOLD TO 20K TANK <br />(VACUUM MONITORED) <br />Remove all ball valves on the Vacuum Monitoring. <br />On sheet FT -10, all ball valves in the on the Vacuum Monitoring have been removed. <br />1P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.