My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Won derfu I speaking with youth is afternoon! I have [a id out the proposed TruchekpLan as per our <br /> discussion below. Please confirm with a reply all that it is acceptable for us to start the Truchek early so <br /> that your team is able to witness the finish and the remainder of the testing tomorrow. <br /> I cannot speak to the availability onsite but would hazard a guess that 8am is sufficient. <br /> In response to your questions: <br /> 1. For the 1 Oh test, we would like your permission to start early such that it can finalize while your <br /> team is on site. To help alleviate concerns, we will document with photos the initial level and <br /> have the Level noted in permanent marker on the riser. This will mean that the interstice <br /> continuity test will be watching the brine drop vs watching it climb. <br /> 2. All brine currently in the tank AND to be added comes from Xerxes. Fiberglass Unlimited (techs <br /> onsite) uses only pre-mixed brine directly from Xerxes plants. Xerxes brine is identifiable by it's <br /> green-bLue coLouring. <br /> 3. The riserwilL be placed on the end compartment which is a separate compartment from the brine <br /> reservoir.There will be a visible seam on the outside between the reservoir and temporary riser <br /> that the techs can point out to your team. <br /> 4. Time will be needed to repair the riser, so depending on the timing and the response to point#11, <br /> we may need to schedule that test for another day. <br /> The testing to be concluded tomorrow shall be 1 Oh Truchek testing,witnessing of the brine level change <br /> during brine addition/removaL to confirm interstice continuity, a primary pressure test on all 3 <br /> compartments and I believe the sump top integrity&secondary piping testing by Town and Country. <br /> Regards, <br /> Shelley Gibson <br /> Product Engineer <br /> Xerxes <br /> Mobile: 780-887-8743 <br /> Shelley.Gibson(cDrnattr.com <br /> www.mattr.com I www.xerxes.com <br /> :� XERXES% <br /> 1103 Parsons Road SW, Edmonton,Alberta,T6X OX2,Canada <br /> Xerxes places the highest priority on the security and privacy of our Clients.Therefore,we have <br /> put our efforts into ensuring that this message is free of errors and viruses.Despite our efforts, <br /> you should always scan all emails for any threats with proper software,as the sender does not <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.