Laserfiche WebLink
accept liability for any damage inflicted by viewing the content of this email. <br /> From: Rivera, Stacy [EHD] <srivera@smgov.org> <br /> Sent:August 18, 2025 12:24 PM <br /> To:Alex Kandathil <Alex.Kandathi I@ mattr.com> <br /> Cc: CJ Dhaliwal <.c0haliwal@norcaloffice.com>; EH-UST<ust@smgov.org>; Dennis Hockenberry <br /> <den nis.hocken berry@ mattr.com>; Robert Dubois<Robert.Dubois@mattr.com>; Michelle Reed <br /> <Michelle.Reed@ mattr.com>; Cary Etter<cary.etter@mattr.com>; David Beard <David.Bearcl@ mattr.com>; Patrick <br /> McDermott<patrick@bostonmcdermott.com>; stefanfiberglassunlimitedinc@gmaii.com; Kevin Amick <br /> <kamick@shieldsharper.com>; Shelley Gibson <Shelley.Gibson@mattr.com.>; Sandy Mann <br /> <s.mann@norcaloffice.com>; Gurkamal Dhaliwal <g.dhaIiwal@norcaIoffice.com>; SeanMurphy <br /> <Sean @tccontractors.com>; 'Daniel Garcia' <fiberglassunlimitedincdg@gmail.com>; 'Chris Schulz' <br /> <fiberglassunlimitedinc@gmail.com>; Saetern, Kristina Gaen [EHD] <ksaetern@sigov.org>;Alaniz,John [EHD] <br /> Subject: RE: ***URGENT***- 250306-1-Stockton Arco#4607-Stockton, CA-Brine in primary <br /> lou don't often get email from srivera@s'gov.org. Learn why this is important <br /> EXTERNAL SENDER: Be cautious with links and attachments. <br /> Hi Alex, <br /> Our inspectors begin work at 7:30 AM and shouLd be able to get to the site by 8 AM.Will.that work ok? I won't <br /> be here tomorrow, but the inspector for the instattation, Kristina Saetern,witl,be there, atong with John <br /> Alaniz, a supervisor with many years of LIST experience. I've included both of them on this email.. Can you <br /> ptease provide a list of the inspections and testing that will be conducted tomorrow so they can be futly <br /> prepared for the inspection? <br /> We atso have a few questions about the testing. <br /> 0 Based on the test procedures, it appears the TruChek test runs for 10 hours. Do you have a estimated <br /> start and end time for the test?And wiLL you be scheduling a separate inspection for the end? <br /> 0 1 wouLd tike to confirm that brine verification wil.l.be taking place prior to any additional,brine being <br /> added to the tank for testing. <br /> 0 Based on the drawings of the tanks, the brine reservoir is connected to the center compartment.We <br /> wouLd like to confirm that the riser being instalLed for interstice continuity testing wit[ be pLaced on a <br /> separate compartment from the brine reservoir. <br /> 0 Air testing is planned for after removal of the added riser and patching of the hote.Wit[that test atso <br /> be conducted tomorrow?Or will they need time to patch it and wit[you be scheduling that test for <br /> another day? <br /> 6 <br />