My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: INSTALLATION NOTES: <br /> • CONTRACTOR ASSUMES RESPONSIBILITY TO 1 INSTALL DOUBLE WALL FIBERGLASS TANKS WITH CONTINUOUS MONITORING bp <br /> ASSURE THAT THE OPERABLE SYSTEM MEETS THE OF HYDROSTATIC ANNULAR SPACES BY "VEEDER-ROOT" TANK AND PIPING <br /> DESIGN INTENT AND THE CONTRACTOR IS MONITOR AND ALARM SYSTEM. ALL TANK. SUMPS SHALL BE DOUBLE WALL <br /> PERMITTED TO ADJUST PIPING LOCATIONS BASED AND BE INDIVIDUALLY CONTINUOUSLY MONITORED BY "VEEDER-ROOT" <br /> ON ACTUAL FIELD CONDITIONS AND INSTALLATION LIQUID SENSORS TIED INTO THE TANK& PIPING MONITOR SYSTEM. TANKS TO <br /> TECHNIQUES. BE SET MIN. 60" BELOW FINISH GRADE. TANK INSTALLATION SHALL BE IN <br /> • PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER 2. INSTALL A 8" CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE <br /> FOOT PREFERRED. DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN <br /> • SECONDARY CONTAINMENT PIPING IS SHOWN BY WITH A 1-1/2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE <br /> NOTE ONLY, NOT GRAPHICALLY. ALL PIPING TO BE SURROUNDING SLAB ELEVATION. CONSTRUCT SLAB PER CIVIL SLAB <br /> DOUBLE CONTAINMENT PIPE. INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS. <br /> 3. INSTALL MULTIPORT FILL PACKAGE IN A DOUBLE WALL FILL SUMP. <br /> 4. INSTALL VARIABLE SPEED TURBINES IN UNDERGROUND STORAGE TANKS. <br /> VERIFY PROGRAMMING REQUIREMENTS FOR ALTERNATING STARTS WITH <br /> PROPERTY LINE LOCAL AGENCY AS REQUIRED. TURBINE SYSTEMS TO BE EQUIPPED WITH 3 <br /> GPH ELECTRONIC LINE LEAK DETECTION. LEAK DETECTORS ARE TO BE <br /> TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR <br /> TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN <br /> 71023'00"E 116.6 1 ' CLOSE OUT BINDER. SET TURBINE INTAKES AT 5" FROM BOTTOM OF TANKS. <br /> TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS <br /> TO LABEL TURBINES AND CONTROLLERS AS TO WHICH PRODUCT THEY ARCO <br /> SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE <br /> OFF OR LOSE POWER. BP WEST COAST PRODUCTS, LLC <br /> 5. INSTALL 3" INSIDE 4" FIBERGLASS STAGE 11 VAPOR RECOVERY HEADER FOR <br /> VAPOR RECOVERY SYSTEM. SLOPE 1/8" PER FOOT MINIMUM TO TANKS. <br /> INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. <br /> CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING. TESTING OF <br /> SLOPE ALL VENT PIPING 1/4" Ot\-Q, VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING <br /> PER FOOT PREFERRED, 1/8"' AND BEFORE STATION OPERATION. SEE DETAILS AND SCOPE OF WORK ON <br /> PER FOOT MINIMUM SHEETS CS-1 & CS-2 FOR PIPE SIZING AT UNDERGROUND STORAGE TANKS. <br /> 6. INSTALL 2" INSIDE 3" DOUBLE WALL FIBERGLASS PRODUCT SUPPLY LINES TO <br /> DISPENSERS. PIPING SHALL BE INSTALLED PER MANUFACTURER'S <br /> 204 216 217 <br /> 217 218 9 SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A <br /> - - - - - - - - - MINIMUM SLOPE OF 1/8" PER FOOT FROM THE FURTHEST DISPENSER SUMP <br /> 11 203 0 0 VENT RISER DOWN TO THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER TAPE <br /> ASSEMBLY WITH PRODUCT PIPING. TESTING OF PRODUCT LINES SHALL BE PERFORMED <br /> I PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. <br /> TO TRUCK 0 7. INSTALL "VEEDER-ROOT" TANK AND LINE ALARM CONTROL PANEL IN BUILDING NO. DATE REVISION DESCRIPT10N <br /> DISPENSER, - - - - - - - - - - - - - - - Z--- z--- - - - - - - - - - - - - - - - - - 0 AT NORMALLY OCCUPIED LOCATION IN BUILDING. SEE ARCHITECTURAL AND 1/30/2024 INITIAL ISSUE <br /> - - - - - - - - - - - - - - - ----------------------- - - - -------- ------------- ------ ---- ---------------- Z� <br /> SEE SHEET - - - - - - - - - - --- ---- ---=1 3 717171 DEF6 ELECTRICAL DRAWINGS FOR EXACT LOCATION. <br /> F-3 17 i rT=- - - - - - 4- - - - - - - - - - - - - - - - - - 8. INSTALL A SINGLE 2" INSIDE 3" FRP VENT LINE FOR EACH UNDERGROUND <br /> 0 2/7/2024 ISSUE FOR PERMIT <br /> 0 STORAGE TANK AND A SINGLE 2" SW FRP VENT LINE FOR THE DEF TANK. <br /> 2/27/2024 REVISED PER C.E.H.COMMENTS <br /> 00, F REMO El SLOPE 1/4" PER FOOT (1/8" PER FOOT MINIMUM) TO TANKS AS SHOWN. <br /> SLOPE ALL PIPING 1/8" PER 4 FILL BOX 1 CONTRACTOR TO INSTALL TRACER TAPE WITH VENT PIPING. SECONDARY 3/26/2024 REVISED PER C.E.H.COMMENTS <br /> FOOT BACK TO TANKS CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION <br /> 214 215 217 ONLY - <br /> 77) 1 1 REGULAR 9. TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12'ABOVE GRADE <br /> 24K <br /> 8 AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT <br /> 15 (TYP. CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE <br /> B20 WITH UNIFORM FIRE CODE REQUIREMENTS. VERIFY LOCAL REGULATIONS <br /> DIESEL FOR ADDITIONAL EQUIPMENT OR INSTALLATION REQUIREMENTS. <br /> 3+0 39+0 3+0 3+1 1 10. INSTALL A SINGLE 1" RIGID GALVANIZED CONDUIT FOR EACH NEWLY <br /> 20 _j 20K <br /> INSTALLED TURBINE PUMP. <br /> 0 11. INSTALL DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SEAL: <br /> z <br /> E-STOP AND SENSORS. SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER <br /> 19 OVERFILL AL RM AND SUMPS. <br /> 12. INSTALL EXTRACTOR ASSEMBLIES FOR VENT, AND STAGE 11 VAPOR <br /> 3+0 3+0 11 11 3+0 20 CN 3+1 1 1 1 RECOVERY AT TURBINE SIDE SUMP. VERIFY WITH LOCAL JURISDICTION FOR <br /> I I I 1 1 4 204 206 208 217 218 ALTERNATE REQUIRED LOCATIONS. <br /> 3+0 <br /> 0 0 TYP. 3 12 <br /> 13. INSTALLA GPH MAG PROBE TANK LEVEL GAUGES AT TURBINE SUMPS AS <br /> L SHOWN. <br /> 0 0 at4 I <br /> L TYP. 14. TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API <br /> _t '�8e - 10 q�� <br /> 214 217 (TYP. OF 7) 203 11 IDENTIFICATION MARKINGS AT FILL MANHOLES. <br /> c__ 15. INSTALL WAYNE OVATION SERIES, MULTI-PRODUCT DISPENSERS AS SHOWN. <br /> DISPENSERS TO BE FITTED WITH STAGE 11 HOSES, NOZZLES AND BREAKAWAY <br /> 31' TYPICAL 2133 <br /> PREMIUM 6K 4 VALVES. CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES, NOZZLES F! -n Ty TE <br /> AND BREAKAWAYS. INSTALL DOUBLE WALL UNDER DISPENSER CONTAINMENT CON DEN ALI STA MENT' <br /> INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING T E RECIPIENT OF THESE MATERIALS UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP,AND ALSO,THAT <br /> THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL BUSINESS <br /> DIESEL SENSORS. START UP BY MANUFACTURER REPRESENTATIVE. GENERAL INFORMATION OF Bp ACCORDINGLY,THE RECIPIENT AGREES TO <br /> 113' (CANOPY) AUTO CANOPY, SEE RETAIN THESE MATERIALS IN STRICT CONFIDENCE AND AGREES NO <br /> 6K CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH TO DISCLOSE THESE MATERIALS TO ANY OTHER PARTY AND <br /> MANUFACTURER 204 206 208 217 218 FU THER AGREES NOT TO MAKE COPIES OF THE MATERIALS.THE <br /> 0 EACH HOSE/NOZZLE. ANY AIR POCKETS OR START UP PROBLEMS DUE TO RECIPIENT AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> PLANS FOR DETAILS P RPOSE FOR WHICH BP HAS MADE THE MATERIALS AVAILABLE,AN <br /> RECIPIENT AGREES TO RETURN ALL MATERIALS TO BP EITHER UPON <br /> IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS COMPLETION OF THE INTENDED PURPOSE OR UPON THE REQUEST <br /> 2 1 14 ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING OF BP,WHICHEVER COMES FIRST <br /> THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, PIPE AND TANK DESIGN DISCLAIMER: <br /> BP DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR <br /> CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED FILTERS WITH NEW PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH ALL <br /> LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE APPLIED IN <br /> FILTERS. THE FUTURE.NOR DOES BP WARRANT THAT A FUELING STORAGE <br /> AND D LIVERY SYSTEM CONSTRUCTED IN CONFORMITY WITH THES <br /> 16. INSTALL WAYNE OVATION SERIES, HIGH FLOW DISPENSERS AS SHOWN. PLANS WI L BE FREE OF ALL LEAKS.YOU ARE ACCORDINGLY <br /> STRONGLY ENCOURAGED TO CONSULT WITH A FUELING STATION <br /> DISPENSERS TO BE FITTED WITH HOSES, NOZZLES AND BREAKAWAY VALVES. ENGINEER OF YOUR CHOOSING TO INDEPENDENTLY EVALUATE <br /> WHETHER THESE PLANS ARE TRULY SUFFICIENT FOR <br /> CONSTRUCTING THE STORAGE AND DELIVERY SYSTEM AT YOUR <br /> CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES, NOZZLES AND STATION. <br /> BREAKAWAYS. INSTALL DOUBLE WALL UNDER DISPENSER CONTAINMENT <br /> MINIMUM 20' INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING DEVELOPMENT INFORMATION: <br /> E-STOP RADIUS SENSORS. START UP BY MANUFACTURER REPRESENTATIVE. GENERAL <br /> CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH UNDERGROUND STORAGE <br /> EACH HOSE/NOZZLE. ANY AIR POCKETS OR START UP PROBLEMS DUE TO TANK STANDARDS <br /> L MAXIMUM 100' <br /> E-STOP RADIUS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING ELEMENT TPO1 <br /> THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, V-15.0 2023 SERIES <br /> NTRA T R I T REPLA E THE FA T RY IN TALLED FILTER WITH NEW <br /> FILTERS. <br /> 17. FILL AND STAGE I VAPOR RECOVERY RISERS &ANNULAR RISER SHALL BE <br /> GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS. SITE ADDRESS: <br /> SEE CS-1 & CS-2 FOR CALIFORNIA DESIGN WITH DOUBLE WALL SUMPS. <br /> LEGEND: 18. ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS <br /> MAXIMUM 100' RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. 4607 S. AIRPORT WAY <br /> E-STOP RADIUS REGULAR GASOLINE PRODUCT PIPING, 2"/3" D/W F/G 19. INSTALL OVERFILL ALARM &ACKNOWLEDGMENT SWITCH, ESO IN LOCATION STOCKTON, CA 95206 <br /> PREMIUM PRODUCT PIPING, 2"/3" D/W F/G SHOWN. ALARM AND SWITCH TO BE LOCATED TO PROVIDE AN <br /> E-STOP UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION <br /> OF FREE STANDING POLE. SEE WIRING DIAGRAM AND DETAIL FOR MOUNTING <br /> B-20 PRODUCT PIPING, T74" D/W F/G REQUIREMENTS. DESIGNED BY- ALLIANCE Z&DM: <br /> ..... VENT PIPING, 2"/3" D/W F/G 20. PROVIDE FIRE EXTINGUISHER- KID-10-460 10#4-A-60-BC OR EQUAL. AAK <br /> VAPOR RECOVERY PIPING, 2"/3" D/W F/G CHECIi BY. BP REPM: <br /> FE-JI ED VAPOR RECOVERY PIPING, 3"/4" D/W F/G DRAWN BY- ALLIANCE PM: <br /> TAF <br /> -------- DEF PRODUCT PIPING, 2"/3" D/W F/G <br /> VERSION: PROJECT NO: <br /> ------ DEF VENT PIPING, 2" S/W F/G <br /> CA-4795 <br /> SEE MATERIALS ON SHEET FM-1 AND FM-2 DRAWING TITLE: <br /> AUTO DISPENSER <br /> AV AND TANK <br /> WORK AREA <br /> AM/PM SHEET NO: <br /> C-STORE <br /> (7) 20 0 10 20 <br /> ==mi F �2 <br /> 1 INCH = 10 FEET <br />
The URL can be used to link to this page
Your browser does not support the video tag.