Laserfiche WebLink
bp <br /> THAT THE OPERABLE SYSTEM MEETS THE DESIGN <br /> NOTE: <br /> • CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE <br /> INTENT AND THE CONTRACTOR IS PERMITTED TO <br /> ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD <br /> CONDITIONS AND INSTALLATION TECHNIQUES. <br /> • PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE <br /> TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER <br /> FOOT PREFERRED. <br /> • SECONDARY CONTAINMENT PIPING IS SHOWN BY <br /> NOTE ONLY, NOT GRAPHICALLY. ALL PIPING TO BE <br /> DOUBLE CONTAINMENT PIPE. <br /> PROPERTY LINE ARCO <br /> BP WEST COAST PRODUCTS, LLC <br /> MINIMUM 20' —\,, <br /> U) E-STOP RADIUS <br /> TRUCK CANOPY, SEE B20 PRODUCT PIPING <br /> co MANUFACTURER PLANS <br /> 0 FOR DETAILS DEF PRODUCT PIPING <br /> C) <br /> E� FROM AUTO NO. DATE REVISION DESCRIPT10N <br /> 00 ol — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — DISPENSERS, <br /> M �/S SAT SEE SHEET F-2 1/30/2024 INITIAL ISSUE <br /> 0 0 0 00 2/7/2024 ISSUE FOR PERMIT <br /> .0 .0 .0 .0 <br /> 0 <br /> 0 0 0 -r A I r A 2/27/2024 REVISED PER C.E.H.COMMENTS <br /> o — -- — — — — — — — — — — — — — — — -- El -- — — — — -- — — — — — — — — — — -- o -- — — — — — — o E-STOP <br /> a c a 0 <br /> TYP. <br /> 0 <br /> z <br /> < <br /> 0 LN E <br /> �-o 0� L--j 01 <br /> 0 L SATELLITE (TYP.) <br /> 20' TYPICAL A <br /> SEAL: <br /> 69'-8" (CANOPY) <br /> CONFIDENTIALITY STATEMENT- <br /> T E RECIPIENT OF THESE MATERIA S UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP,AND ALSO,THAT <br /> THE ATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL BUSINESS <br /> INFOMRMATION OF B P ACCORDINGLY,THE RED PI ENT GREESTO <br /> RETAIN THESE MATERIALS IN STRICT CONFIDEN C E AND AGREES NO <br /> TO DISCLOSE THESE MATERIALS TO ANY OTHER PARTY AND <br /> FU THEIR AGREES NOT TO MAKE COPIES OF THE MATERIALS.THE <br /> RECIPIENT AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> P RPOSE FOR WHICH BP HAS MADE THE MATERIALS AVAILABLE,AN <br /> RUCIPIENT AGREES TO RETURN A L MATERIALS TO BP EITHER UPON <br /> COMPLETION OF THE INTENDED PURPOSE OR UPON THE REQUEST <br /> OF BP,WHICHEVER COMES FIRST <br /> PIPE AND TANK DESIGN DISCLAIMER: <br /> BP DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR <br /> PET OLEUM STORAGE AND D IS PENSING ARE COMPLIANT WIT ALL <br /> LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE APPLIED IN <br /> THE FUTURE.NOR DOES BP WARRANT THAT A FUELING STORAGE <br /> AND D LIVERY SYSTEM CONSTRUCTED IN CONFORMITY WITH THES <br /> PLANS WI L BE FREE OF ALL LEAKS.YOU ARE ACCORDINGLY <br /> STRONGLY ENCOURAGED TO CONSULT WITH A FUELING T ION <br /> ENGINEER OF YOUR CHOOSING TO INDEPENDENTLY EVASLUATTE <br /> WHETHER THESE PLANS ARE TRULY SUFFI C ENT ED <br /> CONSTRUCTING THE STORAGE AND DELIVERY SYSTEM AT YOUR <br /> STATION. <br /> DEVELOPMENT INFORMATION: <br /> UNDERGROUND STORAGE <br /> TANK STANDARDS <br /> CAR WASH 3 ELEMENT TPOl <br /> V-15.0 2023 SERIES <br /> LEGEND: <br /> REGULAR GASOLINE PRODUCT PIPING, 2"/3" D/W F/G SITE ADDRESS: <br /> PREMIUM PRODUCT PIPING, 2"/3" D/W F/G 4607 S. AIRPORT WAY <br /> DIESEL PRODUCT PIPING, 2"/3" D/W F/G <br /> B-20 PRODUCT PIPING, 3"/4" D/W F/G STOCKTON, CA 95206 <br /> VENT PIPING, 2"/3" D/W F/G <br /> VAPOR RECOVERY PIPING, 2"/3" D/W F/G <br /> VAPOR RECOVERY PIPING, 3"/4" D/W F/G <br /> -------- DEF PRODUCT PIPING, 2"/3" D/W F/G DESIGNED BY- AAK ALLIANCE Z&DM: <br /> DEF VENT PIPING, 2" S/W F/G CHECKEDBY. 3P REPM: <br /> SEE MATERIALS ON SHEET FM-1 AND FM-2 DRAWN BY- TAF ALLIANCE PM: <br /> VERSION: PROJECT NO: <br /> MAXIMUM 100' SEE INSTALLATION NOTES ON SHEET F-2 CA-4795 <br /> E-STOP RADIUS DRAWING TITLE: <br /> TRUCK DISPENSER <br /> WORK AREA <br /> SHEET NO: <br /> 8 0 4 8 <br /> F � 3 <br /> 3/16" = l'-O" <br />