Laserfiche WebLink
DISPENSERS SHALL BE MOUNTED <br /> PER MANUFACTURER'S INSTALLATION bp <br /> T-7 1/2" INSTRUCTIONS. 6 BOLTS REQUIRED. <br /> T-7 1/4" INSIDE DISPENSER SKIN-\\ <br /> V-5' 1" N.P.T. VAPOR \,IIII, 1 <br /> 1-1/2"N.P.T. INLET (3) RECOVERY OUTLET CABLE TO JUNCTION BOX —1_� 215 VAPOR PRESSURE SENSOR <br /> 2-WAY CALIBRATION VALVE—,,, <br /> =)o CD 0 21 VAPOR FLOW SENSOR <br /> 1" SHORT NIPPLE 82 VAPOR SHEAR VALVE <br /> E-4 ;t 04 <br /> 0 — <br /> ll� C? STABILIZER ASSEMBLY <br /> 1/4" OD COPPER TUBING. AVOID REDUCE THREADS FROM 1-1/2"TO <br /> 7,--L ----1 1/4" W/ DOUBLE TAP BUSHING(S) <br /> D c ANY TRAPS! (BY CONTRACTOR) <br /> / 0 —5—L-1 <br /> PRODUCT#1 (REGULAR) F� \_ %" x 2" SLOTS FOR ANCHOR <br /> 10 112" V-1. 7 <br /> PRODUCT#2 (PREMIUM) -4 1 BOLTS, 6 SPACES VAPOR RETURN BACK TO TANKS <br /> SIDE "A" JUNCTION BOX CONTAINMENT SUMP ARCO <br /> BP WEST COAST PRODUCTS,LLC <br /> �ER�M O�U N�T I N�G �Dl A�GR�AM� <br /> SCA <br /> NOTE: CONDUITS SHALL NOT <br /> PENETRATE SUMP. ROUTE THROUGH <br /> DISPENSER SUMP FRAME OFFSET FRAME CAVITY. DO NOT CUT <br /> (ADJUSTABLE HEIGHT) SIDE PANELS OF DISPENSER <br /> RUN CONDUITS THROUGH <br /> OFFSET CAVITY IN 1/30/2024 INITIAL ISSUE <br /> DISPENSER SUMP FRAME 1 0 0 0 '10 2/7/2024 ISSUE FOR PERMIT <br /> 0 <br /> A2/27/2024 REVISED PER C.E.H.COMMENTS <br /> C C <br /> 0 <br /> 0 <br /> 0 0 <br /> POUR CONCRETE WITHIN THE ELECTRICAL OFFSET OPENING STEEL—] <br /> FRAME BETWEEN DISPENSER SUMP, SEAL WHERE CONCRETE OR <br /> CONDUIT MEET STEEL. SEAL THE DOWNSIDE OF THE SLOPE AND THE D <br /> CONDUIT AREA WITH "VULKEM 116" (SEE DETAIL ON SHT. FS-1) Ll SEAL: <br /> p <br /> SCA <br /> CONFIDENTIALITY STATEMENT: <br /> NOTE: IF THERE IS NO ROOM TO INSTALL THE VAPOR T E RECIPIENT OF THESE MATERIA S UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP,AND ALSO,THAT <br /> FLOW METER ABOVE THE SHEAR VALVE, IT IS THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL BUSINESS <br /> INFORMATION OF B P ACCORDINGLY,THE RECIPIENT AGREES TO <br /> ACCEPTABLE TO INSTALL FLOW METER BELOW RETAIN THESE MATERIALS IN STRICT CONFIDENCE AND AGREES NO <br /> TO DISCLOSE THESE MATERIALS TO ANY OTHER PARTY AND <br /> U THEIR AGREES NOT TO MAKE COPIES OF THE MATERIALS.THE <br /> -202 RECIPIENT AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> SHEAR VALVE PER LATEST EDITION OF E.O. VR F <br /> P RPOSE FOR WHICH BP HAS MADE THE MATERIALS AVAILABLE,AN <br /> ON HEALY SOLUTION & E.O. VR-204 ON VST RECIPIENT AGREES TO RETURN A L MATERIALS TO BP EITHER UPON <br /> "B" SIDE OF DISPENSER COMPLETION OF THE INTENDED PURPOSE OR UPON THE REQUEST <br /> SOLUTION. SEE MOST RECENT VEEDER ROOT OF BP,WHICHEVER COMES FIRST. <br /> INSTALLATION INSTRUCTIONS FOR ISD FLOW METERS <br /> 2-IN-1 SENSOR 217 81 PRODUCT SHEAR VALVE (TYP.) RifbEEANE)rTAN&DFfSWbNFD�ffaLAMERLANS FOR <br /> BOX PETR ILEUM STORAGE AND DISPENSING ARE COMPLIANT ITH ALL <br /> VAPOR PRESSURE SENSOR LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE APPLIED IN <br /> THE FUTURE.NOR DOES BP WARRANT THAT A FUELING STORAGE <br /> SUMP SENSOR (ONLY 1 PER SITE) AND DELIVERY SYSTEM ONSTRUCTED IN CONFORMITY WITH THES <br /> PLAN S WI L BE FREE OF ALL LEAKS.YOU ARE ACCORDINGLY <br /> J-BOX 0� PIPING UNIONS BY WAYNE STRONGLY ENCOURAGED TO CONSULT WITH A FUELING STATION <br /> WAYNE OVATION DISPENSER FRAME----_.. ENGINEER OF YOUR CHOOSING TO INDEPENDENTLY EVALUATE <br /> WHETHER THESE PLANS ARE TRULY SUFFICIENT FO <br /> DISPENSER SKIN DISPENSER CONSTRUCTING THE STORAGE AND DELIVERY SYSTEM AT YOUR <br /> ELBY CAPPED J-BOX 2" OR 3" UNISTRUT PIPE 214 VAPOR FLOW SENSOR STATION. <br /> 3 E 0 82 VAPOR SHEAR VALVE CLAIMP AS REQUIRED DEVELOPMENT INFORMATION: <br /> HYDROSTATIC SENSOR INSIDE 12 DISPENSER ISLAND, SEE SHEET UNDERGROUNDSTORAGE <br /> IMARY MAN R DISPENSER ISLAND SEE SHEET FS-1 FS-1 FOR CONSTRUCTION DETAIL 81 PRODUCT SHEAR VALVE 2-IN-1 SENSOR BOX 217 DISPENSER <br /> RESERVOIR ATTACHED TO SUMP FOR CONSTRUCTION DETAIL TANKSTANDARDS <br /> 6" WIDE DETECTABLE SUMP SENSOR J-BOX ELEMENT TP01 <br /> UNDERGROUND MARKING TAPE C 82 VAPOR SHEAR VALVE 189 3 <br /> & 4 <br /> SEAL OFF (TYP.) 90 STEEL FORM BURIED 6"-12" BELOW FINISHED ELBY CAPPED ELBOW (TYP.) - BRINE RESERV07),11R& V-15.0 2023 SERIES <br /> 2" OR 3" UNISTRUT PIPE CLAIMP GRADE: EMPIRE MAGNATEC#31-143 90 STEEL FORM <br /> AS REQUIRED SEAL-OFF (TYP.) — ATTACHED TO SUMP <br /> <1 RUN CONDUITS THROUGH OFFSET SITE ADDRESS: <br /> 1" INTERCOM 4 < IN DISPENSER SUMP FRAME (TYP.) <br /> CONDUIT < < DISPENSER 4607 S. AIRPORT WAY <br /> 1" POWER/DATA ---------------------- JUNCTION BOX (TYP.) <br /> CONDUIT(jl�87F <br /> '--ATMOSPHERIC MANOMETER 1-1/2"x`18" FLEX CONNECTOR STOCKTON, CA 95206 <br /> 1" MONITORING 2" INSIDE 3" D.W. FRP <br /> CONDUIT 1 7 1-1/2"x`18" FLEX CONNECTOR BONDED ENTRY LA <br /> FITTING W/TEST PORT OR <br /> OR & 1/4" PLUG (TYP.) <br /> 2" INSIDE 3" FRP 1-1/2"x`12" FLEX CONNECTOR 1-1/2"x`12" FLEX CONNECTOR DESIGNED BY: ALLIANCE Z&DM: <br /> PRODUCT LINE 2" INSIDE 3" FRP 142 l4b AAK <br /> RECOVERY LINE 1" DISPENSER CHECKED BY: BP REPM: <br /> 2" INSIDE 3" D.W. FRP BONDED(� 2" FRP TEE FITTING W/ INTERCOM CONDUIT 87 <br /> ENTRY FITTING W/TEST PORT 2" INSIDE 3" FRP VAPOR LINE 2" INSIDE 3" FRP REDUCER BUSHINGS AT 1 DRAWN BY: TAF ALLIANCE PM: <br /> & 1/4" PLUG (TYP.) PRODUCT LINE DISPENSER ONLY, 2" FRP <br /> VERSION: PROJECTIN <br /> ELBOW AT ALL OTHERS <br /> 3 Al 1" DISPENSER POWER & CA-4795 <br /> o pcp. DATA CONDUIT 87 <br /> 80 0, 0 81 D <br /> SUMP SENSOR IN HOLDER 202 oc�-oc�-oc�-oc�-oc�-oc�-oc�-Sc�-Sc�-S DRAWING TITLE: <br /> ­_y�- , ,000000000000 Doonono <br /> b.— c�oo oc� ocWcWcWcp <br /> DOUBLE WALL UNDER DISPENSER CONTAINMENT COMPACTED OR NATIVE <br /> SUMP FILLED WITH PROPYLENE GLYCOL SUMP SENSOR IN HOLDER 202 SOIL (TYPICAL) 1" MONITORING CONDUIT 87 SUMP MONITOR LIQUID SENSOR 3+0 AUTO <br /> INTERSTITIAL FLUID, SUPPLIED BY BRAVO ONLY PEA GRAVEL 3 X DISPENSER DETAILS <br /> 1-1/2" FNPT SHING 144 164 DOUBLE WALL UNDER DISPENSER CONTAINMENT <br /> SUMP FILLED WITH PROPYLENE GLYCOL <br /> INTERSTITIAL FLUID, SUPPLIED BY BRAVO ONLY <br /> SHEET NO: <br /> SECTION C-C DISPENSER SUMP - FRONT ELEVATION- SECTION D-D DISPENSER SUMP - SIDE ELEVATION FD �2 <br /> c SCALE: 1" = V-10" I D SCALE: 1" = V-0" �SCAT <br />