My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISPENSERS SHALL BE MOUNTED <br /> PER MANUFACTURER'S INSTALLATION bp <br /> T-7 1/2" PRODUCT#3 (DIESEL) INSTRUCTIONS. 6 BOLTS REQUIRED. <br /> T-7 1/4" INSIDE DISPENSER SKIN <br /> 1" N.P.T. VAPOR <br /> 1-1/2"N.P.T. INLET (3) RECOVERY OUTLET CABLE TO JUNCTION BOX 215 VAPOR PRESSURE SENSOR <br /> 2-WAY CALIBRATION VALVE—,., <br /> =0 CD 0 214 VAPOR FLOW SENSOR <br /> 04 <br /> 1" SHORT NIPPLE-- 82 VAPOR SHEAR VALVE <br /> ll� C? STABILIZER ASSEMBLY <br /> 1/4"OD COPPER TUBING. AVOID REDUCE THREADS FROM 1-1/2"TO <br /> /c C=4 0 co oc#,\ c ANY TRAPS! (BY CONTRACTOR) 1/4" W/ DOUBLE TAP BUSHING(S) <br /> PRODUCT#1 (REGULAR) 10 112" V x 2" SLOTS FOR ANCHOR VAPOR RETURN BACK TO TANKS <br /> PRODUCT#2 (PREMIUM) _/ - BOLTS, 6 SPACES <br /> SIDE "A" JUNCTION BOX CONTAINMENT SUMP ARCO <br /> BP WEST COAST PRODUCTS,LLC <br /> ��ER�M O�U N�T I N�G �Dl A�GR�AM� <br /> SCA SET <br /> NOTE: CONDUITS SHALL NOT <br /> PENETRATE SUMP. ROUTE THROUGH <br /> DISPENSER SUMP FRAME OFFSET FRAME CAVITY. DO NOT CUT <br /> (ADJUSTABLE HEIGHT) SIDE PANELS OF DISPENSER <br /> RUN CONDUITS THROUGH N DATE REVI I N DE RIPTION <br /> OFFSET CAVITY IN 1/30/2024 INITIAL ISSUE <br /> DISPENSER SUMP FRAME 1 0 0 0 0 2/7/2024 ISSUE FOR PERMIT <br /> 0 <br /> A2/27/2024 REVISED PER C.E.H.COMMENTS <br /> C C <br /> liol m <br /> 0 <br /> 0 0- 0 40 <br /> 'TEEL—1 <br /> POUR CONCRETE WITHIN THE ELECTRICAL OFFSET OPENING S <br /> FRAME BETWEEN DISPENSER SUMP, SEAL WHERE CONCREI <br /> CONDUIT MEET STEEL. SEAL THE DOWNSIDE OF THE SLOPE AND THE D Ll <br /> CONDUIT AREA WITH "VULKEM 116" (SEE DETAIL ON SHT. FS-1) SEAL: <br /> D' <br /> CONFIDENTIALITY STATEMENT: <br /> NOTE: IF THERE IS NO ROOM TO INSTALL THE VAPOR T E RECIPIENT OF THESE MATERIA S UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP,AND ALSO,THAT <br /> FLOW METER ABOVE THE SHEAR VALVE, IT IS THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL BUSINESS <br /> INFORMATION OF B P ACCORDINGLY,THE RECIPIENT AGREES TO <br /> ACCEPTABLE TO INSTALL FLOW METER BELOW RETAIN THESE MATERIALS IN STRICT CONFIDENCE AND AGREES NO <br /> TO DISCLOSE THESE MATERIALS TO ANY OTHER PARTY AND <br /> U THEIR AGREES NOT TO MAKE COPIES OF THE MATERIALS.THE <br /> -202 RECIPIENT AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> SHEAR VALVE PER LATEST EDITION OF E.O. VR F <br /> P RPOSE FOR WHICH BP HAS MADE THE MATERIALS AVAILABLE,AN <br /> ON HEALY SOLUTION & E.O. VR-204 ON VST RUCIPIENT AGREES TO RETURN A L MATERIALS TO BP EITHER UPON <br /> "B" SIDE OF DISPENSER COMPLETION OF THE INTENDED PURPOSE OR UPON THE REQUEST <br /> SOLUTION. SEE MOST RECENT VEEDER ROOT OF BP,WHICHEVER COMES FIRST. <br /> INSTALLATION INSTRUCTIONS FOR ISD FLOW METERS <br /> 2-IN-1 SENSOR BOX 217 81 PRODUCT SHEAR VALVE (TYP.) RifbEEANE)rTA6&�\DFnSWbNFD�ffaLAMERLANS FOR <br /> PETR ILEUM STORAGE AND DISPENSING ARE COMPLIAN WITH ALL <br /> VAPOR PRESSURE SENSOR LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE APPLIED IN <br /> DISPENSER J-BOX 215 THE FUTURE.NOR DOES BP WARRANT THAT A FUELING STORAGE <br /> SUMP SENSOR J-BOX (ONLY 1 PER SITE) AND DELIVERY SYSTEM ONSTRUCTED IN CONFORMITY WITH THES <br /> 189 PLANS WI L BE FREE OF ALL LEAKS.YOU ARE ACCORDINGLY <br /> PIPING UNIONS BY WAYNE STRONGLY ENCOURAGED TO CONSULT WITH A FUELING STATION <br /> WAYNE OVATION DISPENSER FRAME ENGINEER OF YOUR CHOOSING TO INDEPENDENTLY EVALUATE <br /> WHETHER THESE PLANS ARE TRULY SUFFICIENT FO <br /> DISPENSER SKIN CONSTRUCTING THE STORAGE AND DELIVERY SYSTEM AT YOUR <br /> ELBY CAPPED ELBOW (TYP.) 2" OR 3" UNISTRUT PIPE VAPOR FLOW SENSOR STATION. <br /> 82 VAPOR SHEAR VALVE CLAIMP AS REQUIRED DEVELOPMENT INFORMATION: <br /> HYDROSTATIC SENSOR INSIDE 212 DISPENSER ISLAND, SEE SHEET UNDERGROUNDSTORAGE <br /> PRIMARY MANOMETER DISPENSER ISLAND SEE SHEET FS-1 FS-1 FOR CONSTRUCTION DETAIL 81 PRODUCT SHEAR VALVE 2-IN-1 SENSOR BOX 217 DISPENSER TANKSTANDARDS <br /> RESERVOIR ATTACHED TO SUMP FOR CONSTRUCTION DETAIL <br /> 3 6" WIDE DETECTABLE 82 VAPOR SHEAR VALVE SUMP SENSOR J-BOX 189 ELEMENT TP01 <br /> STEEL FORM UNDERGROUND MARKING TAPE 3 <br /> SEAL OFF (TYP.) 191 r V-15.0 2023 SERIES <br /> BURIED 6"-12" BELOW FINISHED ELBY CAPPED ELBOW (TYP.) — BRINE RESERVOIR& <br /> < 212 to <br /> 2" OR 3" UNISTRUT PIPE GRADE: EMPIRE MAGNATEC#31-143 STEEL FORM SEAL-OFF (TYP.) — HYDROSTATIC SENSOR <br /> CLAIMP AS REQUIREE ATTACHED TO SUMP <br /> IN DISPENSER SUMP FRAME (TYP.) SITE ADDRESS: <br /> 1" INTERCOM CONDUIT 187 4 RUN CONDUITS THROUGH OFFSET DISPENSER JUNCTION BOX (TYP.) 4607 S. AIRPORT WAY <br /> -------------- <br /> 1 POWER/DATA CONDUIT 187 ATMOSPHERIC MANOMETER 1-1/2"xl8" FLEX CONNECTOR STOCKTON, CA 95206 <br /> 1" MONITORING CONDUIT 1-1/2"xl8" FLEX CONNECTOR 3" D.W. FRP BONDED <br /> ENTRY FITTING W/TEST OR <br /> OR PORT& 1/4" PLUG (TYP.) <br /> 1-1/2"xl2" FLEX CONNECTOR <br /> 2" INSIDE 3" FRP PRODUCT LINE 1-1/2"xl2" FLEX CONNECTOR DESIGNED BY: ALLIANCE Z&DM: <br /> 2" INSIDE 3" FRP 142 148 AAK <br /> 2" INSIDE 3" D.W. FRP BONDED RECOVERY LINE 1" DISPENSER 87 CHECKED BY: BP REPM: <br /> ENTRY FITTING W/TEST PORT& 2" FRP TEE FITTING W/ INTERCOM CONDUIT <br /> 1/4" PLUG (TYP.) 2" INSIDE 3" FRP VAPOR LINE 2" INSIDE 3" FRP 142 148 REDUCER BUSHINGS AT 1 DRAWN BY: TAF ALLIANCE PM: <br /> PRODUCT LINE DISPENSER ONLY, 2" FRP <br /> 3 �o ELBOW AT ALL OTHERS VERSION: PROJECT NO: <br /> To Oc�-.0�1�t-I D c� <br /> 1" DISPENSER POWER & CA-4795 <br /> SUMP SENSOR IN HOLDER 202 !LL;;;A 0 87 <br /> c� <br /> DATA CONDUIT DRAWING TITLE: <br /> lb.—.I-Ol.-I 11011-P,1001V 1001up llc4v, 0 no 0��on�� n <br /> DOUBLE WALL UNDER DISPENSER CONTAINMENT )qc)qc)lq 0 0 0 , 1 1-1 OMPACTED OR NATIVE 3 <br /> 85 SUMP FILLED WITH PROPYLENE GLYCOL PEA GRAVEL SUMP SENSOR IN H 02 SOIL (TYPICAL) 1" MONITORING CONDUIT 87 SUMP MONITOR LIQUID SENSOR 3+1 AUTO <br /> INTERSTITIAL FLUID, SUPPLIED BY BRAVO ONLY 3 X L-1�11 DISPENSER DETAILS <br /> 1-1/2" FNPT B HING 144 164 DOUBLE WALL UNDER DISPENSER CONTAINMENT <br /> SUMP FILLED WITH PROPYLENE GLYCOL <br /> INTERSTITIAL FLUID, SUPPLIED BY BRAVO ONLY <br /> SHEET NO: <br /> SECTION C-C DISPENSER SUMP - FRONT ELEVATION SECTION D-D DISPENSER SUMP - SIDE ELEVATION FD � 3 <br /> SCALE: 1" = l'-O" SCALE: 1" = l'-O" �SCA <br />
The URL can be used to link to this page
Your browser does not support the video tag.