Laserfiche WebLink
bp <br /> ARCO <br /> BP WEST COAST PRODUCTS,LLC <br /> 73 FUELWHIPHOSE 73 FUELWHIPHOSE FUEL WHIP HOSE 73 <br /> 0 0 FUEL HOSE 74 <br /> BREAKAWAY <br /> 74 FUEL HOSE 74 FUEL HOSE <br /> BREAKAWAY BREAKAWAY <br /> FUEL HOSE 72 <br /> IF 55 DRESSER X__ 56 DRESSER <br /> WAYNE WAYNE <br /> OVATION2 OVATION2 <br /> 0 DISPENSER 0 DISPENSER <br /> NO. DATE REVISION DESCRIPTION <br /> X <br /> 1/30/2024 INITIAL ISSUE <br /> 2/7/2024 ISSUE FOR PERMIT <br /> x <br /> 72 FUEL HOSE 72 FUEL HOSE HYDROSTATIC SENSOR INSIDE <br /> NOZZLE 70 217 <br /> > PRIMARY MANOMETER <br /> x <br /> > RESERVOIR ATTACHED TO SUMP <br /> A <br /> 0 <br /> SWIVEL 71 DISPENSER ISLAND <br /> NOZZLE 70 NOZZLE SEE SHEET FS-1 FOR <br /> CONSTRUCTION DETAIL <br /> L J r--------I <br /> A <br /> 71 SWIVEL 71 SWIVEL <br /> 90 IF STEEL FORM REQUIRED SEAL: <br /> USE PRE-FAB FORM <br /> x <br /> ir EXPANSION JOINT (TYP.) SEE <br /> CONCRETE DETAILS SHEET <br /> Wi 46" FS-1 FOR DETAIL <br /> kLA) <br /> < F—i Fjh <br /> im 4aws "m T < <br /> 7 \'&,y za 9 r--(cw T— 3 <br /> < <br /> T E RECIPIENT OF THESE MATERIALS UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP,AND ALSO,THAT <br /> THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL BUSINESS <br /> INFORM TION OF BP.ACCORDINGLY,THE RECIPIENT AGREES TO <br /> RETAIN THESE MATERIALS IN STRICT CONFIDENCE AND AGREES NO <br /> 2"xl8 FLEX T <br /> FURTHER A REES NOT TO MAKE COPIES OF THE MATERIALS.THE <br /> CONNECTOR 2" FRP ELBOW WITH 2" FRP X RECIPIENT AGREES TO USE THE MATERIALS 0 LY FOR THE LIMITED <br /> 144 164 PURPOSE FOR WHICH BP HAS MADE THE MATERIALS AVAILABLE,AN <br /> 1-112" FNPT BUSHING RECIPIENT AGREES TO RETURN A L MATERIALS TO BP EITHER UPON <br /> COMPLETION OF THE INTENDED PURPOSE OR UPON THE REQUEST <br /> 1-1/2"X18" FLEX OF BP,WHICHEVER COMES FIRST. <br /> CONNECTOR 2" INSIDE 3" FRP OUT RifbEEANOrTA6&DESWbNFD�ffaLAMERLANS FOR <br /> PET OLEUM STORAGE AND DISPENSING ARE COMPLIANT ITH ALL <br /> TO SATELLITE (TYP.) LEGALREQ IREMENTS THAT EXIST OR AS THEY MAYBE APPLIED IN <br /> THE FUTURE.NOR DOES BP WARRANT THAT A FUELING STORAGE <br /> AND DELIVERY SYSTEM ONSTRUCTED IN CONFORMITY WITH THES <br /> PLAN S WI L BE FREE OF ALL LEAKS.YOU ARE ACCORDINGLY <br /> NGLY ENCOURAGED TO CONSULT WITH A FUELING STATION <br /> ENGINEER OF YOUR CHOOSING TO INDEPENDENTLY EVALUATE <br /> WHETHER THESE PLANS ARE TRULY SUFFICIENT FO <br /> 2" INSIDE 3" D.W. BONDED CONSTRUCTING THE STORAGE AND DELIVERY SYSTEM AT YOUR <br /> 126 STATION. <br /> 2" GALVANIZED ELBOW FRP ENTRY FITTING (TYP.) DEVELOPMENT INFORMATION: <br /> 147 2" BELL x MALE ADAPTER <br /> 142 2" INSIDE 3" FRP FROM UNDERGROUNDSTORAGE <br /> DIESEL MASTER IN <br /> DOUBLE WALL UNDER DISPENSER 86 DOUBLE WALL UNDER DISPENSER 148 (TYP.) 87 DOUBLE WALL UNDER DISPENSER TANKSTANDARDS <br /> CONTAINMENT SUMP FILLED WITH 87 CONTAINMENT SUMP FILLED WITH CONTAINMENT SUMP FILLED WITH ELEMENT TP01 <br /> PROPYLENE GLYCOL INTERSTITIAL FLUID, PROPYLENE GLYCOL INTERSTITIAL FLUID, PROPYLENE GLYCOL INTERSTITIAL FLUID, <br /> SUPPLIED BY BRAVO ONLY SUPPLIED BY BRAVO ONLY SUPPLIED BY BRAVO ONLY V-15.0 2023 SERIES <br /> SITE ADDRESS: <br /> 4607 S. AIRPORT WAY <br /> STOCKTON, CA 95206 <br /> MASTER/SAT/DEF DISPENSER REAR ELEVATION SINGLE SATELLITE DISPENSER - FRONT ELEVATION DESIGNED BY: AAK ALLIANCE Z&DM: <br /> ASCALE: 1" = l'-O" B SCALE: 1 l'-O" CHECKED BY: BP REPM: <br /> DRAWN BY: TAF ALLIANCE PM: <br /> VERSION: PROJECT NO: <br /> CA-4795 <br /> DRAWING TITLE: <br /> TRUCK DISPENSER <br /> DETAILS <br /> SHEET NO: <br /> FD � 5 <br />