Laserfiche WebLink
ADA COMPLIANCE NOTE: bp <br /> WHEN DISPENSERS ARE INSTALLED <br /> AS SHOWN ON THIS DRAWING, THE <br /> REQUIREMENTS REGARDING <br /> HANDICAPPED VERTICAL AND <br /> ALL DEF HANGING HARDWARE INSIDE HORIZONTAL ACCESSIBILITY ARE <br /> FUEL WHIP HOSE 73 CABINET WITH HEATER PROTECT FULLY MET. <br /> 77 FUEL HOSE BREAKAWAY/SWIVEL SAFETY NOTE: <br /> FUEL HOSE BREAKAWAY 74 f WHEN DISPENSERS ARE INSTALLED <br /> 76 FUEL HOSE AS SHOWN ON THIS DRAWING, THE <br /> REQUIREMENTS OF NFPA 30A 6.3.9 <br /> 75 <br /> NOZZLE AND 6.3.9.1 REGARDING SHEAR <br /> SECTIONS ARE FULLY MET. <br /> DRESSER WAYNE OVATION2 DISPENSER 55 NOTE: <br /> CAT 5 CABLE SHALL BE INSTALLED <br /> FIRE EXTINGUISHER FOR BOTH ENHANCED OR <br /> FUEL HOSE 72 STANDARD ELECTRONICS <br /> ADA CARD READER 93 <br /> ARCO <br /> NOZZLE (TYP.) 70 BP WEST COAST PRODUCTS,LLC <br /> 0 <br /> Lo 0 STEEL CANOPY <br /> COLUMN <br /> )00 0 <br /> SWIVEL (TYP.) 71 91 HEIGHT MAY VARY FOR <br /> ADA REQUIREMENTS <br /> TRASH CONTAINER <br /> .1 Mn I <br /> ��a "mi r <4 <br /> NO. DATE REVISION DESCRIPTION <br /> 1/30/2024 INITIAL ISSUE <br /> 2/7/2024 ISSUE FOR PERMIT <br /> z� <br /> 4 4 6 <br /> A <br /> <4 <br /> 4 4 <br /> < jj' 1 4 % <br /> 4 <br /> DOUBLE WALL UNDER DISPENSER <br /> CONTAINMENT SUMP FILLED WITH 87 <br /> PROPYLENE GLYCOL INTERSTITIAL <br /> FLUID, SUPPLIED BY BRAVO ONLY SEAL: <br /> 0 ISLAND CONFIGURATION MASTER/SAT/DEF DISPENSER ELEVATION <br /> ASCALE: 3/4" l'-O" <br /> CONFIDENTIALITY STATEMENT: <br /> T E RECIPIENT OF THESE MATERIA S UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP,AND ALSO,THAT <br /> THE ATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL BUSINESS <br /> 15' INFOMMATION OF Bp ACCORDINGLY,THE RECIPIENT AGREES TO <br /> RETAIN THESE MATERIALS IN STRICT CONFIDENCE AND AGREES NO <br /> TO DISCLOSE THE S E MATERIALS TO ANY OTHER PARTY AND <br /> FURTHER AGREES NOT TO MAKE COPIES OF THE MATERIALS.THE <br /> RECIPIENT AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> PU RPOSE FOR WHICH BP HAS MADE THE MATERIALS AVAILABLE,AN <br /> RECIPIENT AGREES TO RETURN A L MATERIALS TO BP EITHER UPON <br /> COMPLETION OF THE INTENDED PURPOSE OR UPON THE REQUEST <br /> 142 148 2 INSIDE 3" FRP MAIN OF BP,WHICHEVER COMES FIRST. <br /> 2" INSIDE 3" FRP SATELLITE 142 148 PRODUCT LINE FROM TANKS NOZZLE REACH RADIUS RifbEEANOrTAN&DESWbNFD�ffaLAMERLANS FOR <br /> PET OLEUM STORAGE AND DISPENSING ARE COMPLIANT ITH ALL <br /> LINE IN FROM MASTER 2" INSIDE 3" FRP DEF LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAYBE APPLIED IN <br /> D F (1��421 48 THE FUTURE.NOR DOES BP WARRANT THAT A FUELING STORAGE <br /> LINE FROM DEF TANK N <br /> A D D LIVERY SYSTEM CONSTRUCTED IN CONFORMITY WITH THES <br /> PLANS WI L BE FREE OF ALL LEAKS.YOU ARE ACCORDINGLY <br /> 2" INSIDE 3" um. BONDED STRONGLY ENCOURAGED TO CONSULT WITH A FUELING STATION <br /> 126 ENGINEER OF YOUR CHOOSING TO INDEPENDENTLY EVALUATE <br /> FRP ENTRY FITTING (TYP.) WHETHER THESE PLANS ARE TRULY SUFFICIENT FO <br /> CONSTRUCTING THE STORAGE AND DELIVERY SYSTEM AT YOUR <br /> F 2" FRP TEE WITH STATION. <br /> 1"SS FLEX CONNECTOR <br /> DEVELOPMENT INFORMATION: <br /> -L:-: UNDERGROUNDSTORAGE <br /> TANKSTANDARDS <br /> ELEMENT TP01 <br /> c= c= c= c= STEEL CANOPY COLUMN <br /> OUT <br /> (EVERY OTHER ISLAND) 0 SITE ADDRESS: <br /> TRASH CONTAINER 0 N <br /> L <br /> V-611 TOWEL HOLDER 4607 S. AIRPORT WAY <br /> STOCKTON, CA 95206 <br /> 4'-9" DESIGNED BY: AAK ALLIANCE Z&DM: <br /> T-6" 7'-6" CHECKED BY: BP REPM: <br /> DOUBLE WALL UNDER DISPENSER CONTAINMENT DRAWN BY: TAF ALLIANCE PM:: <br /> SUMP FILLED WITH PROPYLENE GLYCOL 87 VERSION: PROJECT NO: <br /> INTERSTITIAL FLUID, SUPPLIED BY BRAVO ONLY 2" INSIDE 3" FRP SATELLITE D F *-J\�� 2" INSIDE 3" FRP LINE TO CA-4795 <br /> LINE OUT FROM MASTER FOLLOWING DEF DISPENSER DRAWING TITLE: <br /> TRAFFIC FLOW TRUCK DISPENSER <br /> ISLAND LAYOUT <br /> SHEET NO: <br /> OISLAND CONFIGURATION MASTER/SAT/DEF DISPENSER PLAN FD �4 <br /> BSCALE: 3/4" = l'-O" <br />