$ XE RXES <br />2. Repair Timeline and Actions <br />March 24, 2025— Initial Mobilization and Internal Repair <br />Xerxes crew mobilized to inspect the primary spaces of the tank system. <br />A breach was identified at the interface where the end tank meets the base tank, <br />allowing communication between the primary and interstice. <br />• Internal repair was completed to seal the seam as per drawing and photo below. <br />E%rERNALBRbGE <br />