Laserfiche WebLink
$ XE RXES CR <br />All three primaries successfully passed a 1h 5-psi pneumatic test. <br />• Interstice pressure and vacuum testsfailed, indicating a secondary breach. Leak <br />Detection Technologies (LDT) was scheduled to perform tracer -gas leak identification. <br />May 1, 2025—Leak Detection Technologies and External Repairs <br />LDTmobilized and conducted tracer -gas diagnostics. <br />• Two external breach locations were identified: <br />o At the reservoir riser pipe connection <br />o Approximately 2 feet below the centerline near the compartment seam <br />(secondary confirmation pending repair of the riser leak) <br />