Laserfiche WebLink
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />Date: <br />June 14, 2024 <br /> Facility Address: <br /> 4900 E Mariposa RD, Stockton <br /> Facility Name: <br /> Inter-State Oil Co. - Stockton Cardlock <br /> □ OUT □ R □ COS4045 - Release/Leaks/Spills - General Local Ordinance 86 <br /> □ OUT □ R □ COS4050 - Abandonment/Illegal Disposal/Unauthorized Treatment - General See below 87 <br /> □ OUT □ R □ COS4055 - Abandonment/Illegal Disposal/Unauthorized Treatment - General Local Ordinance 88 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Code of Fed Regulations 112.3 4030038 - SPCC has been implemented. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan was not implemented, as required. <br />-SPCC Plan is not implemented for training, inspections, record keeping, drainage controls/procedures. <br />REGULATION GUIDANCE: 112.3: The owner or operator or an onshore or offshore facility subject to this section must <br />prepare in writing and implement a Spill Prevention Control and Countermeasure Plan (hereafter “SPCC Plan” or <br />“Plan”),” in accordance with § 112.7 and any other applicable section. 25270.4.5.(a): An owner or operator shall <br />conduct periodic inspections of the storage tank to ensure compliance with Part 112 (commencing with Section 112.1) <br />of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. In implementing the spill prevention control <br />and countermeasure plan, an owner or operator shall fully comply with the latest version of the regulations contained in <br />Part 112 (commencing with Section 112.1) of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. <br />CORRECTIVE ACTION: Implement the SPCC plan, as required. Submit proof of correction to the EHD. <br />This is (Class 2) Violation. <br /> 3 <br />Code of Fed Regulations 112.5(b) 4010009 - 5 year review performed on SPCC and documented. <br />OBSERVATION: The facility failed to perform the 5-year review of the SPCC plan. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan was last reviewed on 2/19/2016. <br />REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a) of this section, complete a <br />review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br />this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was <br />required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months <br />of the review to include more effective prevention and control technology if the technology has been field -proven at the <br />time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. <br />You must implement any amendment as soon as possible , but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation , and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br />following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), <br />and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Immediately complete and document the 5-year review of the SPCC Plan and make any <br />necessary amendments (a Professional Engineer must certify any technical amendments). Submit verification of <br />adequate SPCC plan review completion to the EHD. <br />This is (Class 2) Violation. <br /> 10 <br />Code of Fed Regulations 112.7 4010012 - SPCC in writing, follows code seq/cross ref, good eng practice, mgt <br />approval, items not in place. <br />OBSERVATION: The SPCC Plan dated 2/19/2016 is not signed by management. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan failed to have the full approval of management at a level of authority to commit the <br /> 11 <br />FA0014269 PR0530044 SC001 06/14/2024 <br />EHD Rev. 12/06/2021 CP22 - AST Non-Qualified OIRPage 5 of 13 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD