My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 3:11:44 PM
Creation date
7/30/2024 2:51:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0540987
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023459
FACILITY_NAME
Flying J Travel Center Lathrop - 1017
STREET_NUMBER
345
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
French Camp
Zip
95231
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
345 Roth RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4F <br /> San Joaquin ValleyHEMINY AIR LIVING" <br /> wv,��r.h��l#hk�i�l ivi r�p.e�m <br /> AIR POLLUTION CONTROL DISTRICT NEW 819Chata rWcle2n,1i0 <br /> TP 201.3 <br /> UST Static Pressure Performance Test Report Form <br /> Permit Number: N/A Test Company: Jones Covey Group,Inc. <br /> Site Name: Pilot 1017 Lathrop Technician: Keith Henderson <br /> Site Address: 345 Roth Rd. Certification Number Expiration Date <br /> City: Lathrop Zip: 95330 District: SJV-0242 3/31/2026 <br /> Date/Time of Test: 8/27/2024 @ 11:30am <br /> TEST INFORMATION <br /> Total number of nozzles: 12 1 Are the tanks manifolded? ® Yes ❑ No <br /> Phase I vapor recovery system executive order(as referenced on Permit to Operate) OPW- 102 <br /> Phase II vapor recovery system executive order(as referenced on Permit to Operate) Balance-204 <br /> Nitrogen introduction point ® Phase I vapor coupler I ❑ Phase II vapor riser <br /> Pressure measuring device ❑ incline manometer ® digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device(must be within 90 days of the test) 7/23/2024 <br /> Ending value for digital manometer drift test if applicable(must be 0.01 in.w.c. or less) 0.00 <br /> Initial tank ullage pressure(vent if over 0.5 in.w.c.) 0.00 <br /> Nitrogen introduction flow rate,F(must be between 1 and 5 CFM) 2 CFM <br /> Calculated ullage fill-time,t2(tz=V/1522 x F) 5 Minutes 28 Seconds <br /> Actual fill-time 4 Minute 20 Seconds <br /> Number of hoses with over 100 ml(balance hoses must be drained prior to testing) N/A <br /> TANK INFORMATION <br /> Tank No. 1 2 3 4 ALL <br /> Product grade 87 Unleaded 91 Premium <br /> Actual tank capacity(gallons) 16,537 8.623 25,160 <br /> Gasoline volume(gallons) 6,983 3,314 10,297 <br /> Ullage,V(gallons) 19,554 15,309 114,863 <br /> If tanks are not manifolded,number of nozzles I I I —d 1 <br /> 2 IN. W.C. STATIC PRESSURE TEST <br /> Test No. 1 2 3 4 5 <br /> Start time 11:30am <br /> Initial Pressure,inches of water column(in.w.c.) 2.00 <br /> Pressure at one minute, in.w.c. 2.00 <br /> Pressure at two minutes,in.w.c. 2.00 <br /> Pressure at three minutes,in.w.c. 2.00 <br /> Pressure at four minutes, in.w.c. 2.00 <br /> Pressure at five minutes,in.w.c. 1.98 <br /> Allowable minimum pressure,in.w.c. 1.89 <br /> Pass/Fail(enter"GF"for gross failure) Pass <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the stateZtd infor ation provided in this document are true, accurate, and complete. <br /> Signature of Technician: , Date: 8/27/2024 <br /> Ver. 1.3—08.07.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.