My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 3:11:44 PM
Creation date
7/30/2024 2:51:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0540987
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023459
FACILITY_NAME
Flying J Travel Center Lathrop - 1017
STREET_NUMBER
345
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
French Camp
Zip
95231
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
345 Roth RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEIlRP1200-12 <br /> alarm devices must automatically restrict flour or alert 7.1.5 inspection Nocedure. <br /> the transfer operator When Obc tank is 110 more than 1.Remove the drop tube from the tank. <br /> 90 pei+ccnt full.Th is approach retlects the more conserva- <br /> tive application of like rtkles. 2.Visually inspect the autnmatic shutoff valve and <br /> float mhanisrrt for any damage and remove <br /> 7.1 Automa#la Shutoff Devices, any debris or foreign objeets_ <br /> 7.1_1 General. Automatic shutoff devices, 3,iulanually move the float mechanism to ensure it <br /> sometimes called flappers or Flapper 'valves, are moves freely, <br /> an integral part oX the drop tube assembly lwaalled 4.With the-float mechanism ixl the shutoff(closed) <br /> within the tank fill riser. They are designed to positiou, visually inspect the drop tube and <br /> initially restrict and subsequently completely shut vciify that the shutoff valve is released and will <br /> off` flow when product has =chLd predetermined move into the product flaw path, <br /> levels duriTig a deliver+. Automatic shutoff valves <br /> geed to I properly positioned And 6perete freely to S.If possible, verify that the bypass valve in the <br /> coaml flow and proven tank overfills. drop tube is open and Free of blockage, <br /> 7.1.2 Purpose. *Me purpose of this inspecti€kn 6.Tr problems with the shutoff valve are found and <br /> is to verify the autamadi shutoff valve is installed defective components need repair or replace- <br /> properly, operates its dcxigncd and is set to cone- mot. notify the appr.'Ofriate person. <br /> pletely shut oft`flow when the tank is no more than 7.Using the autornalic shutoff device rnanufac.- <br /> 95 percent full. tur"-s skiggested procedure, extimirke the drop <br /> 7.:L,3 Description of Inspection. After a pro- tuhe and shulnff valve to determine if product <br /> Lbribiary inspection of the automatic shutoff instal- flaw will he completely shut off at 95 percent of <br /> Iadanp the drop tube is removed from the tank.The tank capacity. Makc any+ adjustments oecessary <br /> autoiatic shutoff is checked for proper opMtion, to ensure that Flow will he compietely shut oft' <br /> and its placement is ineasured to verify that it ,s when the tank is no more than 95 perc=t fitll, <br /> properly heated to completely shut off#low when <br /> the.tank is no krone than 95 pumit full. Y <br /> 7.1.4 preparation. Refer to the tank manufac- j <br /> turer`s c:alibratlon chart fnr the capacity in gal- <br /> lops, (lie diaurketer and the volume of product with <br /> mspect to product level, <br /> It Use automatic shutoff device has s float that <br /> extends from the drop tube in the shutoff(clmcd) <br /> position, verily the proper orientation of the float <br /> mechanism.The float mechanism should be orient- <br /> ed away from any obstructions(ball float,subtnw- <br /> ible. turbine pump (STP), tank wall, tank gauge <br /> probe, etc.) if[he movement of the float n=ha- <br /> nism is restricted,it will not function as designed. <br /> Use this prnctdore ixr eonjunction with the manu- FIGAJRE 7-:1. Check the drop tube and flapper for dam- <br /> tscn=rN installation and main[enanoe instructions. age, like sure that ft flapper moves freely and sht►ts <br /> off Bow when extended. <br /> 7.1-5 Inspectlon Equipment. Test equipment -- <br /> shall include: S.After insp tion of lhc;autuniatic shutnrFdevice, <br /> tools for��cri7oval of the droll ttkhe; n;install the drop tubwc, <br /> tape ttkeasure; 7.1.7 Pass/Fall Criteria. If the automatic shut- <br /> tools for inspection of the automatic shutoff. off deviou furkctions as designed and c,oinl3lcte <br /> .shtlWIT of product flow is able to occur when the <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.