Laserfiche WebLink
Reccrnniended Practices for the Testing and Verification of$011,Overfill,Irk Ntmiian and Secondary CcnWnraent Equipment at UST facilities <br /> frank is no more than 95 percent full, the aulomatic 7.2.3 Inspection Equipment,. Test equipment <br /> sbuteff device passes the inspection. shall inclade: <br /> U the automatic shutoff' device dues not function equipment to romovc tht;vent restriction devi€e; <br /> as designed or complete hbutoff of product flow . tape aitr_asure, <br /> is unable, io occur und] dtic tank is mom than 9 <br /> percent full, [lie automatic shutoff device fails the 7.2.E Description of Inspection. The ball float <br /> inspection. valve assembly is rornoved from the tank, inspect- <br /> ed rot proper operation and measured to en uai re,that <br /> 7.2 Ball Float Valves. Tho POI Overfill, release, the ball float assembly is the proper d1ni arsian to <br /> DL[cction and Release, Prevention Equipment 'Testing restrict flow into the tank whcn it is no more than <br /> Committee recommends that ball floats be mmovcd from 90 percent cull. <br /> UM as overfill prevention devices and ancglicr method <br /> or overfill prevention he installed. 7.ZS Reparaticm. Refer to the manufacturer's <br /> Lank chart for [lie capacity in gallons, the diameter <br /> 7.2.1 General. Ball float valves are designed and the vdi me of product with respect try product <br /> to restrict product flow when product in the tank level. <br /> x chcs a ucrtain level by restricting vapor flow <br /> from the tank ullage.When vapor flour is restricted, Use this test pi-ouedure in curijunction with the man- <br /> pressu-e tsuilds in ncr-talc ullage,slowing the Flow ufkAurcr's installalion and maintenance instrcc- <br /> of product into fte tank_ liens. <br /> To opi�rata prcperly, the ball float valve must be Visually verify that all fiofk-top fittings are lrak- <br /> properly installed, positioned at the correct height free and vapor-tight before, strong the te-q proce- <br /> inside the tank and compatible with UST configu- dam. If any fittings air- loose, the- ball float valve <br /> M6011. will not restrict flow. <br /> 7.2.2 Purpose. The purpose of this inspe Linn is Inspect the drop tube to ensure that it does not have <br /> to verify that tho hall float valve is installed prop- an overfill valve, <br /> erly,operates as designed,and is set to restrict flow+ <br /> when the tank is no mare than 90 percent full_ • - Inspection Procedure. <br /> JL Remove the loll float valve assembly From the <br /> 1Mnk. <br /> 2.Visually inspect the ball float and cage.Remove <br /> ,V any dCWN or forcigrt Objcxts. <br /> +f ti <br /> -hEN6ry;'v4.. <br /> - - - - -- - - - - ... •� }''y�*ter, <br /> FIGURE 7-2. l3a;t i"r'oc'if as,3cmNy show ng the bail in the: FMURE 7-3. To avoid damage when removing or rein- <br /> open position. The ball will afloat and cover the vapor stalling the txall ftat, use an extractor toot recomrrmand- <br /> Wh if the product rises above the tevel of the fie. cd by the hall Root manufacturer: <br /> pei.org 40 <br />