Laserfiche WebLink
The following is an itemized list of CP22 - AST Non-Qualified violations that have not <br /> been addressed for ReConserve of California - Stockton, Inc as of July 09, 2024. <br /> Open violations from May 21, 2024 inspection <br /> Violation#3-4030038-SPCC has been implemented. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC) Plan was not implemented, as required. <br /> -The SPCC Plans requires monthly testing of the sensors. No records were observed on site. Per Ron Alexander, <br /> General Manager, he will have his employee test the sensor. <br /> - No Annual training records were observed. <br /> REGULATION GUIDANCE: 112.3: The owner or operator or an onshore or offshore facility subject to this section must <br /> prepare in writing and implement a Spill Prevention Control and Countermeasure Plan (hereafter"SPCC Plan"or <br /> "Plan"),"in accordance with§ 112.7 and any other applicable section. 25270.4.5.(a):An owner or operator shall <br /> conduct periodic inspections of the storage tank to ensure compliance with Part 112 (commencing with Section 112.1) <br /> of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. In implementing the spill prevention control <br /> and countermeasure plan, an owner or operator shall fully comply with the latest version of the regulations contained in <br /> Part 112 (commencing with Section 112.1)of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. <br /> CORRECTIVE ACTION: Implement the SPCC plan, as required. Submit proof of correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#11 -4010012-SPCC in writing,follows code seq/cross ref,good eng practice, mgt approval, items <br /> not in place. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC) Plan reviewed at the time of inspection, <br /> dated 5/21/2024, did not follow the order or requirements of 40 CFR Part 112.7. It doesn't follow the required SPCC <br /> rule sequence and doesn't include adequate cross-reference.The Plan doesn't address additional <br /> procedures/methods/equipment not yet fully operational. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a Plan in <br /> accordance with good engineering practices. The Plan must have the full approval of management at a level of <br /> authority to commit the necessary resources to fully implement the Plan. <br /> CORRECTIVE ACTION: Ensure that your SPCC Plan complies with the following requirements It follows the required <br /> SPCC rule sequence and/or includes adequate cross-reference. The plan addresses additional <br /> procedures/methods/equipment not yet fully operational. Provide proof of correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 5 <br />