My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2009-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23701
>
4400 - Solid Waste Program
>
PR0536589
>
CORRESPONDENCE_2009-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 8:45:37 AM
Creation date
8/14/2024 11:30:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2009-2016
RECORD_ID
PR0536589
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0021005
FACILITY_NAME
SNYDER SANITARY GARBAGE DISPOSAL
STREET_NUMBER
23701
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
ESCALON
Zip
95320
CURRENT_STATUS
Active, billable
SITE_LOCATION
23701 S SANTA FE RD
P_LOCATION
06
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
23701 S SANTA FE RD ESCALON 95320
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Keith Powell <br />A L Powell Trucking <br />3534 Arthur Rd <br />Escalon, CA 95320 <br />(209) 838-7470 <br />• Drainage: once finished, the above project will allow rain -water to run off the high "waste" area onto <br />the outer low lying area, over the surrounding land already tested to be clean. There it will be <br />absorbed into the Earth. <br />• Dust Control: We will have a water tank truck on site available to spray water over the dirt during our <br />moving process to mitigate dust if needed. <br />• Timing: As per our order, this work shall commence within 30 days of the acceptance of this <br />proposal, and will attempt to be completed within 90 days, subject only to unforeseen environmental <br />circumstances beyond our control that force a timeline change. <br />• Labor: This work will be done by our employees. They have been trained to use the equipment to be <br />used for this project. The site workers will be trained on this plan so that if waste is encountered they <br />will know how to respond. <br />• Safety: Our crew will be instructed to use dust masks at all times while working on the property, and <br />all work will be done during regular working hours in compliance with local, state, and federal laws. <br />The work will have continual oversight by a foreman, and occasional oversight by an upper level <br />manager. (The training required for un -known hazards is 40 hour "Haz-WOPER" training. If the <br />waste is not disturbed no specialized training will be required.) <br />• Other terms: On site work will not be done without EHD oversight. <br />• Follow -Up: Once this work is done, we will monitor the site in order to maintain the proper grading <br />of the land and the subsequent drainage control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.