My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2350
>
1600 - Food Program
>
PR0549056
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:00:14 AM
Creation date
9/18/2024 9:57:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0549056
PE
1618
FACILITY_ID
FA0028162
FACILITY_NAME
FIVE BELOW INC
STREET_NUMBER
2350
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2350 W KETTLEMAN LN
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Plan Approval Procedures For Food Facilities <br />Pursuant to the California Health & Safety Code, Division 104, Environmental Health, Part 7, California <br />Retail Food Code (CRFC), Section114380, a plan approval must be obtained from the San Joaquin County <br />Environmental Health Department (EHD) before constructing or remodeling any building for use as a food <br />facility. Remodel of a food facility means construction, building, enlarging, altering, converting or repairing <br />that requires a permit from the local building authority. The following procedures are required to process <br />and approve food facility plans as well as to obtain final approval to open for business: <br />The plans must include sufficient information to demonstrate compliance with the "Minimum <br />Requirements for Food Facility Plans." (See page 6) <br />Plans may be prepared by an architect, draftsman, designer, contractor, or owner. All plans must be <br />drawn in a concise, detailed, and professional manner. Inadequate plans will be rejected. <br />A minimum of two (2) sets of detailed plans and specifications, a completed food construction plan <br />application, and required plan check fees of $456 (three-hour minimum) must be submitted. All <br />overtime review shall be charged the hourly rate calculated at one and one half times, with a one hour <br />minimum ($228 per hour). <br />Upon approval, one (1) set of plans will be returned to the applicant, and the second set will be kept on <br />file by the EHD until construction has been completed. The approved set of plans must be maintained <br />at the construction site until the final inspection has been made. <br />Before commencing construction, approvals must be obtained from the EHD, local building authority <br />and other appropriate agencies. Building permits for food facilities are not to be issued until plan <br />approval has been obtained from the local health department. <br />If any changes on the approved plans are desired, revised plans shall be submitted for review and <br />approval prior to construction. Additional fees shall be required for review of revised plans at a charge <br />of $152 per hour (one-hour minimum). <br />All construction and equipment installation shall be subject to afield inspection. The food facility shall <br />not open for business until final approval is obtained from the EHD and a valid Health Permit is issued. <br />Call (209) 468-3420 for inspections or appointment(s). <br />Approval of the plans shall become null and void if the work authorized is not commenced within 180 <br />days from the date of approval, or if the work authorized by such plans is abandoned. In order to <br />renew action on a permit after expiration, the permittee will pay a full plan check fee. <br />EHD 16-01 3 PLAN CHECK GUIDE <br />7/5/17
The URL can be used to link to this page
Your browser does not support the video tag.