My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2800 - Aboveground Petroleum Storage Program
>
PR0516200
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 2:21:19 PM
Creation date
10/2/2024 7:52:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516200
PE
2833 - AST FAC 100 K + 1 - </=1 M GAL CUMULATIVE
FACILITY_ID
FA0009335
FACILITY_NAME
MUNN & PERKINS
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
247-22-032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
26292 E RIVER RD ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PO BOX 1928 <br />BENICIA, CA 94510 <br />TEL 707 346 5058 <br />FAX 707 922 2284 GEORGE REED INC. STI SP001 EXTERNAL INSPECTION <br />ESCALON, CA <br /> www.powerseicom 7,000 GALLONS OIL TANK <br /> <br />STI-SP001 External George Reed Inc. Escalon, CA Tank 7,000 Gal October 2024 Project #24-378 Rev0 <br />© 2024 PEI Inc. Page 5 of 43 Date Printed: 11/7/24 7:42 AM <br /> <br />6. Consider applying touch up coating on the hardware. <br /> <br />7. Consider installing 100% caulking system on the threaded fittings or replacing with seal-welded <br />counterparts and painting/coating piping systems. <br /> <br />8. Consider replacing with appropriate tank level gauging system. <br /> <br />9. Consider installing nameplate with pertinent tank information and replacing faded tank signages. <br /> <br />10. Consider installing a grounding system that meets NFPA design requirements. <br /> <br />11. Consider installing 100% Caulking system on the threaded fittings or replacing with seal-welded <br />counterparts. <br /> <br />12. Consider installing a proper access structure for the containment. <br /> <br />13. Consider installing a vertical cage ladder to access the tank roof and appurtenances. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.