Laserfiche WebLink
SHEET NUMBER: <br />SHEET CONTENTS: <br />PROJECT NUMBER:PROJECT DATE: <br />CONSULTANTS: <br />Sacramento, CA 95827 <br />PH:(916) 455-6500 FAX:(916) 455-8100 <br />3090 Fite Circle, #104 <br />REVISIONS: <br />20-007 08-14-2020 <br />K12 Architects, Inc <br />DEVELOPER: <br />CONTRACTOR: <br />PROJECT: <br />Fast N <br />Easy <br />RIVER <br />ISLANDS <br />PROFESSIONAL SEALS: <br /> 16460 GOLDEN VALLEY <br />PARKWAY <br />Lathrop, California 95330 <br />1 <br />Muhammad Bilal <br />10445 Chantel Lane <br />Stockton, CA 95212 <br />CONVENIENCE STORE AND <br />FUELING STATION <br />Parcel 1 <br />BUILDING DEPT. COMMENTS 10/4/21 <br />2 PLANNING DEPT REV 10/14/21 <br />3 BUILDING DEPT. COMMENTS 06/22/22 <br />3-25-2022 <br />4 BUILDING DEPT. COMMENTS 09/21/22 <br />5 FIRE DEPT. COMMENTS 10/19/22 <br />6 EHD-HAZMAT 12/12/22 <br />7 EHD-HAZMAT 02/03/23 <br />GENERAL FUEL SYSTEM NOTES <br />CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES AT A MINIMUM: <br />GENERAL ENGINEERING "A" <br />HAZARDOUS MATERIAL SUBSTANCE HANDLING <br />CONTRACTOR SHALL HAVE AND MAINTIAN THE FOLLOWING INSURANCE: <br />PERMITS <br />EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW SUMPS AND PIPING. <br />INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST. <br />PIPING SYSTEMS SHALL BE TESTED AS FOLLOWS: <br />ALL CONDUIT SHALL BE 3/4"(MIN). MIN. BURIAL DEPTH OF 24" <br />1. <br />2. <br />3. <br />4. <br />5. <br />A. <br />B. <br />6. <br />7. <br />8. <br />1. <br />2. <br />3. <br />4. <br />SCOPE OF WORK <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />12. <br />13. <br />14. <br />15. <br />A. <br />B. <br />C. <br />D. <br />A.STEEL PIPING: <br />A.PETROLEUM PIPING TEST PROCEDURE: <br />1. <br />2.CONFIRM TESTING PROCEDURE WITH LOCAL AGENCIES PRIOR TO TESTING. <br />3.PRIMARY TESTING: <br />(1) <br />(2)BEFORE APPLYING PRESSURE, VERIFY THE FOLLOWING HAVE BEEN COMPLETED: <br />*VERIFY SHEAR VALVES ARE CLOSED. <br />*VERIFY THE BALL VALVE CLOSEST TO THE TURBINE IS CLOSED. <br />* <br />(3)PROCEDURES TO FOLLOW WHEN APPLYING PRESSURE: <br />* <br />* <br />* <br />* <br />*SYSTEM SHOULD BE KEPT AT 20 PSI FOR DURATION OF <br />CONSTRUCTION AND SHALL BE CHECKED FREQUENTLY. <br />4.SECONDARY TESTING: <br />(1) <br />5.VENTS, VAPOR, AND TANK RISER TESTING: <br />(1)UPON COMPLETION OF VAPOR RECOVERY PIPING, TEST SYSTEM AS FOLLOWS: <br />(a) <br />6.DUE TO WEATHER CONDITIONS, PRESSURES MAY RISE OR FALL OVER A <br />PERIOD OF TIME. PRESSURES SHALL BE MONITORED AT REGULAR INTERVALS <br />7.VENT AND VAPOR RECOVERY PIPING WITH PHASE II RECOVERY. <br />(1) <br />8.UPON COMPLETION OF THE FUELING SYSTEM, THE FOLLOWING ITEMS ARE REQUIRED: <br />(1)ST-27 TEST. <br />(2)ST-30 TEST. <br />(3)A over L TEST (IF REQUIRED). <br />(4)PLACED IN SERVICE REPORT. <br />(5) <br />(6)ALL METERS SEALED. <br />(7)TANK AND LINE TEST (3rd PARTY). <br />(8)FUEL SYSTEM CHECK TEST. <br />(9)AS BUILT DRAWINGS. <br />(10)MONITORING SYSTEM FINAL WITH APPROPRIATE AGENCY APPROVALS. <br />* <br />* <br />TO PREVENT FALSE READINGS. <br />ALL BLACK IRON PIPING TO BE PAINTED GREY.11. <br />INSTALL MONITORING SYSTEM WITH LIQUID SENSORS IN EACH TANK ANNULAR SPACE. INSTALL MONITOR <br />CONTROL PANEL IN NEW BUILDING AS DIRECTED BY OWNER. INSTALL LIQUID LEVEL PROBES IN TANKS. SEE SITE <br />ELECTRICAL PLAN FOR TANK CONDUIT CONFIGURATION. WHEN A LEAK IS DETECTED, AN AUDIO/ VISUAL ALARM <br />WILL GO ON. LEAK DETECTION @ SUMP WILL CAUSE SUMP SHUT DOWN LEAK DETECTION @ DISPENSER SUMP <br />WILL CAUSE DISPENSER SHUT DOWN. AUDIO/ VISUAL ALARM WILL GO OFF IF ANNULAR SPACE MONITOR OR <br />SUMP. MONITORING SYSTEM SHALL BE INSTALLED TO PERMIT CONDITIONS. MONITORING SYSTEM TO BE <br />INSTALLED TO THE SAME STANDARD FOR COMMUNICATIONS AS REQUIRED BY OWNER. <br />INSTALL NEW CONCRETE TANK MAT AND OTHER CONCRETE AS INDICATED ON SITE PLAN. CONCRETE TO BE <br />INSTALLED ACCORDING TO TYPICAL CONCRETE SPECIFICATIONS. DRIVE SLAB SHALL BE 6" THICK. <br />INSTALL DISPENSERS AND CONSOLES AS INDICATED ON SITE PLAN AND DESCRIBED IN THE EQUIPMENT LIST. <br />THE ABOVE MENTIONED LIST IS FOR REFERENCE ONLY. CITY, COUNTY, OR OTHER GOVERNING <br />AGENCIES, MAY HAVE OTHER REQUIREMENTS THAT MUST BE ADHERED TO. IT IS THE <br />CONTRACTORS RESPONSIBILITY TO CONFIRM AND MEET ALL REQUIREMENTS. <br />CONTRACTOR IS RESPONSIBLE FOR VENT AND VAPOR RECOVERY PIPING SYSTEM PASSING ANY <br />LOCALLY IMPOSED TEST REQUIREMENTS. <br />METER CALIBRATION, CONFIRMED AND ADJUSTED. (RESULTS MUST BE SENT TO WEIGHTS & <br />MEASURES WITHIN 24 HOURS OF COMPLETION) <br />UPON COMPLETION OF PRIMARY PIPING AND BEFORE GLUING. SECONDARY HAS TO BE <br />INSTALLED PRIOR TO GLUING OF PRIMARY. PRESSURE TESTING NOT TO EXCEED THE <br />MAXIMUM WORKING PRESSURE OF FUEL PIPING COMPONENTS. IMPACT VALVES ARE <br />RATED AT 50PSI TESTING TO BE ACCORDING TO PIPE MANUFACTURER'S INSTRUCTIONS. <br />CONTRACTOR SHALL PROVIDE OWNER 48 HOUR NOTICE FOR TESTING AND <br />COMPLY WITH PERMIT CONDITIONS FOR LOCAL INSPECTORS.. <br />UPON COMPLETION OF SECONDARY PIPING AND BEFORE PLACEMENT OF ANY BACKFILL, <br />TEST SECONDARY PIPING AS REQUIRED BY PIPE MANUFACTURER. <br />THERE MUST BE TWO (2) GAUGES (0-100 PSI) PER PRODUCT BEING <br />TESTED. <br />MAKE SURE PERSONNEL ARE KEPT AWAY FROM PIPING SYSTEM DURING ANY TIME <br />INITIAL PRESSURIZATION IS BEING APPLIED. <br />APPLY PRESSURE IN 15-20 PSI INTERVALS UNTIL REACHING A MAXIMUM OF 60 PSI. <br />MARK CRITICAL PRESURES ON GAUGES WITH ELECTRICAL TAPE AT THE BEGINNING OF <br />EACH TEST. <br />AFTER PROVING SYSTEM TIGHTNESS, APPLY 50 PSI PRESSURE, HOLD FOR ONE MINUTE, <br />THEN RELEASE PRESSURE. REPEAT PRESSURIZATION CYCLE A MINIMUM OF (5) TIMES. <br />UPON COMPLETION OF THE ABOVE TESTS, KEEP PRESSURE AT 50 PSI FOR A MINIMUM OF <br />(3) HOURS. OBSERVE PRESSURE GAUGES FOR ANY LOSS. <br />THIS SITE IS PREVIOUSLY UNDEVELOPED AND HAS NO FUEL CONTAMINATION. <br />CONTRACTOR EMPLOYEES SHALL HAVE COMPLETED "APPROPRIATE MANUFACTURERS <br />PIPES TRAINING" (CERTIFICATE REQUIRED). CONTRACTOR SHALL COMPLETE THE "PIPING <br />SYSTEMS INSTALLATION CHECKLIST FOR UNDERGROUND PETROLEUM PIPES" AND SHALL <br />FURNISH THE OWNER WITH COPIES OF ALL APPROPRIATE CERTIFICATES. <br />CONTRACTOR SHALL HAVE BEEN TRAINED BY "TANK MANUFACTURER FOR TANK INSTALLATION" <br />CONTRACTOR SHALL COMPLETE THE "TANK INSTALLATION CHECKLIST" (SUPPLIED TO <br />CONTRACTOR BY MANUFACTURER DURING TANK DELIVERY) AND SHALL FURNISH A COPY OF <br />THIS DOCUMENT TO THE OWNER. <br />CONTRACTOR SHALL DEVELOP A SPECIFIC SITE SAFETY PLAN PRIOR TO THE START OF WORK. <br />CONTRACTOR SHALL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH IT'S EMPLOYEES. <br />CONTRACTOR SHALL SUBMIT PROOF OF ALL REQUIRED INSURANCE TO THE OWNER <br />AND SHALL NAME "ALLIED FUELS " AS "ALSO INSURED." <br />COMPREHENSIVE GENERAL LIABILITY, INCLUDING CONTRACTOR'S PROTECTIVE <br />LIABILITY, COMPLETED OPERATIONS LIABILITY, AND CONTRACTUAL LIABILITY, WITH A <br />COMBINED SINGLE LIMIT OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR <br />BODILY INJURY AND PROPERTY DAMAGE. <br />EMPLOYEES LIABILITY WITH A MINIMUM LIMIT OF LIABILITY OF $1,000,000 FOR EACH <br />OCCURRENCE. <br />AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED VEHICLES WITH A <br />COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY OF NOT LESS THAN <br />$1,000,000 PER OCCURRENCE FOR BODILY INJURY AND PROPERTY DAMAGE. <br />GENERAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND <br />SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE SATISFACTORY <br />COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR REQUIRED BY THE DRAWINGS. <br />ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT 2019 CALIFORNIA FIRE, <br />BUILDING, ELECTRICAL AND MECHANICAL CODES, CCR TITLE 23,DIVISION 3, CHAPTER 16, ARTICLE <br />3; AND CALIFORNIA AIR RESOURCES BOARD REQUIREMENTS. <br />ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND STATE <br />REGULATIONS. THE CONTRACTOR IS REFERRED TO THE OSHA BOOKLET, "EXCAVATING AND <br />TRENCHING OPERATIONS, FOR SAFE WORK PRACTICES GUIDE" FOR PERFORMING EXCAVATION <br />WORK. <br />UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE THE OWNER WITH <br />"AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY THE CONTRACTOR. "AS BUILTS" SHALL <br />BE COMPLETED ON-SITE. <br />CONTRACTOR SHALL PROVIDE A WORK SCHEDULE TO THE OWNER BEFORE <br />COMMENCING ANY CONSTRUCTION WORK. <br />CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND SHALL <br />OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES REQUIRED TO OPERATE <br />THE FACILITY. <br />FENCE OFF FUEL SYSTEM WORK AREA WITH 6' HIGH CHAIN LINK FENCE. AT THE END OF <br />EACH WORK DAY SECURE FENCING PANELS TOGETHER. <br />THE OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF EXCAVATED SOIL AFTER <br />COMPLETION OF ANY NECESSARY REMEDIATION, INCLUDING AERATION. <br />INSTALL NEW PETROLEUM PRODUCT, VENT & VAPOR LINES PER SITE PLAN, STANDARD TANK <br />DRAWINGS, AND PER PIPING GENERAL NOTES ON SHEET FS-1. <br />ALL PIPING OTHER THAN FIBERGLASS SHALL BE <br />BLACK IRON (GALVANIZED PIPE IS NOT ALLOWED). <br />ALL BELOW GRADE PIPING SHALL BE FRP, NO <br />EXCEPTIONS. <br />NOTE: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN TRAINED BY <br />THE PIPING MANUFACTURER. <br />NEW HIRT VENT SYSTEM, INSTALL PER MANUFACTURER'S INSTRUCTIONS. <br />DO NOT SUBJECT THE EVR APPROVED EQUIPMENT TO PRESSURES HIGHER THAN THE MANUFACTURERS <br />RECOMMENDATIONS. <br />(b)TANKS TO BE TESTED PER MANUFACTURER'S WRITTEN INSTRUCTIONS AS TO NOT VOID THE WARRANTY. <br />FUEL GENERAL NOTES <br />FS1.0 <br />DETAILS <br />A.ALL PIPING SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE <br />MANUFACTURER'S INSTALLATION SPECIFICATIONS AND INSTRUCTIONS SEE NOTES ON <br />E/FS11. <br />B.FIBERGLASS PIPING SHALL BE LIMITED TO THE FOLLOWING: <br />SMITH FIBERGLASS RED THREAD IIA FOR PRODUCT, VENT AND VAPOR LINES, USING <br />ONLY DS8000 SERIES ADHESIVES TO JOIN PRIMARY PRODUCT AND SECONDARY <br />CONTAINMENT PIPE AND ALCOHOLS AND FITTINGS FOR ALCOHOL-GASOLINE <br />MIXTURES. WHEN JOINING SECONDARY CONTAINMENT FITTINGS, A SPECIAL <br />FILLER FROM SMITH FIBERGLASS PRODUCTS MUST BE ADDED TO THE DS8000 <br />SERIES ADHESIVES. <br />1.)UNDERGROUND PIPING: SMITH FIBERGLASS SYSTEMS: <br />MIN. AMOUNT OF <br />PEA GRAVEL ABOVE <br />THE TOP OF THE PIPE <br />MINIMUM <br />BURIAL <br />DEPTH <br />SURFACE <br />CONDITION <br />PIPE <br />SIZE <br />PIPE <br />MANUFACTURER <br />SMITH FIBERGLASS <br />RED THREAD IIA <br />UNPAVED <br />PAVED, ASPHALT <br />(4" MINIMUM) <br />PAVED, CONCRETE <br />(4" MINIMUM) <br />12" <br />8" <br />5" <br />14" <br />9" <br />7" <br />14" <br />10" <br />7" <br />17" <br />12" <br />9" <br />20" <br />13" <br />11" <br />20" <br />14" <br />11" <br />2" <br />3" <br />4" <br />PIPING TO BE INSTALLED WITH THE MINIMUM DEPTHS LISTED BELOW. ALL CROSSOVERS <br />OF PIPING SHALL HAVE 6" MINIMUM BETWEEN PIPES. <br />E. <br />16.PIPING MANUFACTURER AND INSTALLATION REQUIREMENTS <br />DRAWING INDEX <br />RIVER ISLANDS <br />CHEVRON FUEL <br />16460 GOLDEN VALLEY PARKWAY <br />LATHROP , CA 95330 <br />fuel system drawings <br />C.ABOVE GROUND PIPING FOR FUELS: <br />1.) BLACK IRON AND BLACK IRON FITTINGS. SINGLE WALL. <br />GALVANIZED PIPE IS NOT PERMITTED. <br />D.DEF PIPING: <br />1.) ABOVE GROUND DEF PIPING SHALL BE SINGLE WALL <br />STAINLESS STEEL PIPING <br />LATHROP, CALIFORNIA <br />FUELING SYSTEM <br />FS1.0 FUEL SYSTEM COVER SHEET & GENERAL NOTES <br />FS1.1 TANKS AND LINES SITE PLAN <br />FS1.2 FUEL SYSTEM MONITORING SITE PLAN <br />FS2.0 FUEL EQUIPMENT LISTS <br />FS3.0 UNLEADED, SUPER UNLEADED, & DIESEL TANKS SECTION <br />FS4.0 TANK DETAILS <br />FS5.0 DIESEL TANK SUMPS, VENT DETAILS <br />FS6.0 TANK AND LINE WET HOLE DETAILS <br />FS7.0 UNLEADED, SUPER UNLEADED, & DIESEL MONITORING SYSTEM <br />FS4.1 87 AND 91 TANK SUMP DETAILS <br />CALIFORNIA FIRE CODE NOTES <br />PRIOR TO FINAL, DOCUMENTATION FROM THE COUNTY ENVIRONMENTAL HEALTH DEPARTMENT HAZARDOUS <br />MATERIAL DIVISION INDICATING THAT THE UNDERGROUND FLAMMABLE/COMBUSTIBLE LIQUIDS STORAGE <br />TANKS HAVE BEEN APPROVED SHALL BE PROVIDED <br />NOTE: <br />THE TANK AND THE TANK SUMPS HAVE CALCIUM CHLORIDE IN THE <br />INTERSTITIAL SPACE. <br />THE DISPENSER SUMPS AND VENT SUMPS HAVE PROPYLENE GLYCOL <br />IN THE INTERSTITIAL SPACE <br />CONTRACTOR TO LABEL FILL PORTS WITH TYPE OF FILL. <br />CODES <br />THESE DRAWINGS HAVE BEEN PREPARED USING: THE 2019 CALIFORNIA BUILDING CODE, CALIFORNIA <br />FIRE CODE, CALIFORNIA ELECTRICAL CODE, CALIFORNIA MECHANICAL CODE, CALIFORNIA PLUMBING <br />CODE, CALIFORNIA ENERGY CODE, AND CALIFORNIA GREEN BUILDING STANDARDS CODE(S) AND <br />ORDINANCES. ALL WORK SHALL COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS. <br />VICINITY MAP <br />UNPAVED <br />PAVED, ASPHALT <br />(4" MINIMUM) <br />PAVED, CONCRETE <br />(4" MINIMUM) <br />UNPAVED <br />PAVED, ASPHALT <br />(4" MINIMUM) <br />PAVED, CONCRETE <br />(4" MINIMUM)GOLDEN VALLEYPKWYRIVER ISLANDS PKWY <br />5 <br />5 <br />5 <br />NOTE: <br />THE DRIVER, OPERATOR OR ATTENDANTOF THE TANK VEHICLES SHALL, <br />BEFORE MAKING DELIVERY TO A TANK, DETERMINE THE UNFILLED , <br />AQVAILABLE CAPACITY OF SUCH TANK BY AN APPROVED GAUGING <br />DEVICE . [CFC2305.1.2] <br />5 <br />FS3.1 BIO-DIESEL/ E-85 TANKS SECTION <br />FS7.1 BIO-DIESEL/ E-85 MONITORING SYSTEM <br />7 <br />7