Laserfiche WebLink
13 <br />3 <br />1 <br />2 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />14 15 1716 1918 20 21 22 23A / WEV CHARGING PARKINGNOPARKINGNOPARKINGNOONLYEV CHARGING ONLYEV CHARGING ONLYEV CHARGING ONLYSIDEWALKSIDEWALKSIDEWALK SIDEWALKDRIVEWAYND <br />PLANTERPLANTER~NATURAL <br />GROUND~ <br />~NATURAL <br />GROUND~ <br />~NATURAL <br />GROUND~ <br />~NATURAL <br />GROUND~ <br />~AC PAVEMENT~~AC PAVEMENT~~AC PAVEMENT~CONC.CONC.CONC.FS1.1 <br />TANKS AND LINES <br />SITE PLAN <br />20 TANKS AND LINES SITE PLAN <br />1" = 20'-0"SCALE: <br />THIS SITE PLAN IS FOR REFERENCE ONLY. SEE SHEET A101 FOR GENERAL <br />INFORMATION ON THE ENTIRE SITE. SEE FS1.2 ,FS1.3, AND FS1.4 FOR <br />ENLARGED SITE PLAN FOR FUELING <br />PIPING GENERAL NOTES <br />FUEL KEY NOTES <br />FUEL LINE LEGEND <br />5 <br />2 <br />3 <br />1 <br />GENERAL TANK & LINE NOTES <br />THESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO BE AN EXACT <br />REPRESENTATION OF THE FINAL PRODUCT. GENERAL CONTRACTOR TO RELOCATE, <br />MODIFY, OR MAKE ADJUSTMENTS TO PROVIDE A COMPLETE AND WORKING SYSTEM, <br />CONSISTENT WITH THE INTENT OF THE DESIGN. CONTRACTOR SHALL COMPLY WITH ALL <br />STATE, FEDERAL AND LOCAL REQUIREMENTS. <br />INSTALL NEW DOUBLE WALL PIPING FROM 3-UST TANKS - 1-20,000 GAL 87 UNLEADED; <br />1-20,000 GAL: SPLIT TANK - 1-10,000 GAL 91 UNLEADED; 1-10,000 GAL DIESEL ; 1-20,000 <br />GAL: SPLIT 10,OOO GAL-BIO-20, 10,000 GAL- E-85 <br />ALL AUTO FUEL PRODUCT LINES (2") AND SECONDARY CONTAINMENT (3" PIPING SHALL BE <br />100% METHANOL COMPATIBLE), U.N.O. ON PLAN. SMITH RED THREAD IIA IS SPECIFIED. <br />ALL GLUES SHALL BE PERMEATED 51-D. ALL VENTS UP TO GRADE SHALL BE 100% <br />METHANOL COMPATIBLE. ALL NEW PIPING TO BE INSTALLED PER MANUFACTURER'S <br />SPECIFICATIONS. SLOPE PIPING 1/4" PER FOOT BACK TO TANKS. <br />INSTALL 4"/3" DOUBLE WALLED VAPOR RECOVERY LINES FROM DISPENSERS. SLOPE 1/4" <br />PER FOOT 87 GAS TANK. <br />4 <br />6 CFC 2305.3 REQUIRES SPILLS TO BE PREVENTED FROM FLOWING INTO BUILDINGS. THE <br />FINISH FLOOR OF THE BUILDING IS 1' MIN HIGHER THAN ALL FUELING OPERATION <br />LOCATIONS. <br />INSTALL 3"/2"" DOUBLE WALLED VENT LINES FROM TANKS TO VENT STACK. SLOPE 1/4" <br />PER FOOT BACK TO TANK. <br />DIESEL <br />VAPOR RECOVERY <br />VENT LINE <br />87 UNLEADED <br />91 UNLEADED <br />SEE SHEET FS2.0 FOR EQUIPMENT LIST <br />NOTE: <br />1.ALL PIPING SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE <br />MANUFACTURER'S INSTALLATION SPECIFICATIONS AND INSTRUCTIONS SEE NOTES ON <br />E/FS11. <br />2.FIBERGLASS PIPING SHALL BE LIMITED TO THE FOLLOWING: <br />SMITH FIBERGLASS RED THREAD IIA FOR PRODUCT, VENT AND VAPOR LINES, USING <br />ONLY DS8000 SERIES ADHESIVES TO JOIN PRIMARY PRODUCT AND SECONDARY <br />CONTAINMENT PIPE AND ALCOHOLS AND FITTINGS FOR ALCOHOL-GASOLINE <br />MIXTURES. WHEN JOINING SECONDARY CONTAINMENT FITTINGS, A SPECIAL FILLER <br />FROM SMITH FIBERGLASS PRODUCTS MUST BE ADDED TO THE DS8000 SERIES <br />ADHESIVES. <br />A)SMITH FIBERGLASS SYSTEMS: <br />3.ALL PIPING SYSTEMS SHALL BE TESTED AS FOLLOWS: SEE <br />E/FS11 FOR TESTING REQUIREMENTS. <br />MIN. AMOUNT OF <br />PEA GRAVEL ABOVE <br />THE TOP OF THE PIPE <br />MINIMUM <br />BURIAL <br />DEPTH <br />SURFACE <br />CONDITION <br />PIPE <br />SIZE <br />PIPE <br />MANUFACTURER <br />SMITH FIBERGLASS <br />RED THREAD IIA <br />12" <br />8" <br />5" <br />14" <br />9" <br />7" <br />14" <br />10" <br />7" <br />17" <br />12" <br />9" <br />20" <br />13" <br />11" <br />20" <br />14" <br />11" <br />2" <br />3" <br />4" <br />4.PIPING TO BE INSTALLED WITH THE MINIMUM DEPTHS LISTED BELOW. <br />ALL CROSSOVERS OF PIPING SHALL HAVE 6" MINIMUM BETWEEN PIPES. <br />UNPAVED <br />PAVED, ASPHALT <br />(4" MINIMUM) <br />PAVED, CONCRETE <br />(4" MINIMUM) <br />UNPAVED <br />PAVED, ASPHALT <br />(4" MINIMUM) <br />PAVED, CONCRETE <br />(4" MINIMUM) <br />UNPAVED <br />PAVED, ASPHALT <br />(4" MINIMUM) <br />PAVED, CONCRETE <br />(4" MINIMUM) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />MOUNT EMERGENCY FUEL SHUT-OFF SWITCH, +48" ON CANOPY COLUMN. <br />PROVIDE SIGN PER DETAIL , 9/FS4.0 <br />TLS 450 PLUS <br />MSB <br />FUEL ELECTRICAL PANELS <br />VENT LINES <br />FUEL LINES <br />CASHIER FUEL CONTROLS <br />LOCATION OF FIRE EXTINGUISHER IN SURFACE MOUNTED CABINET. MUST BE <br />WITHIN 75' OF ALL DISPENSERS AND FILLS. FIRE EXTINGUISHER SHALL BE <br />2-A:20-B:C RATED. CFC 2305.5 <br />FUEL DISPENSER WARNING SIGN, TO BE VISIBLE WITHIN 10' OF EACH <br />DISPENSER. THESE STICKERS ARE LOCATED ON EACH DISPENSER. SEE DETAIL <br />11,17/FS4.0 <br />20K UST FOR 87 REGULAR UNLEADED GAS TANK <br />10K UST SPLIT FOR 91 PREMIUM UNLEADED GAS TANK <br />10K UST SPLIT FOR DIESEL GAS TANK <br />TANK OVER FILL ALARM AND RESET BUTTON <br />VENT SUMP AND RACK WITH CANISTER <br />AUTO DRIVE SLAB, SEE DETAIL 2/FS4.0 <br />TSL 450 PLUS REMOTE ALARM <br />ATTENDANT INTERCOM SYSTEM CONSOLE TO ALL DISPENSERS. <br />10K UST SPLIT FOR E85 GAS TANK <br />10 UST SPLIT FOR BIO-20 GAS TANK <br />17R100'-0"1 <br />13 <br />1410 <br />11 <br />12 <br />6 <br />5 <br />6 9 <br />8 <br />15 <br />342 <br />7 <br />17 <br />16 <br />SHEET NUMBER: <br />SHEET CONTENTS: <br />PROJECT NUMBER:PROJECT DATE: <br />CONSULTANTS: <br />Sacramento, CA 95827 <br />PH:(916) 455-6500 FAX:(916) 455-8100 <br />3090 Fite Circle, #104 <br />REVISIONS: <br />20-007 08-14-2020 <br />K12 Architects, Inc <br />DEVELOPER: <br />CONTRACTOR: <br />PROJECT: <br />Fast N <br />Easy <br />RIVER <br />ISLANDS <br /> 16460 GOLDEN VALLEY <br />PARKWAY <br />Lathrop, California 95330 <br />1 <br />Muhammad Bilal <br />10445 Chantel Lane <br />Stockton, CA 95212 <br />CONVENIENCE STORE AND <br />FUELING STATION <br />Parcel 1 <br />BUILDING DEPT. COMMENTS 10/4/21 <br />2 PLANNING DEPT REV 10/14/21 <br />3 BUILDING DEPT. COMMENTS 06/22/22 <br />3-25-2022 <br />4 BUILDING DEPT. COMMENTS 09/21/22 <br />5 FIRE DEPT. COMMENTS 10/19/22 <br />6 EHD-HAZMAT 12/12/22 <br />7 EHD-HAZMAT 02/03/23 <br />PROFESSIONAL SEALS: <br />8 ELECT MSB 06/28/23 <br />9 OWNER CHANGE 08/02/23 <br />10 WALK-IN COOLER DETAILS 10/13/23 <br />11 VEEDER-ROOT TLS-450 05/17/24 <br />RIVER ISLANDS PARKWAYGOLDEN VALLEY PARK WAYFUTURE LOT G <br />20K U <br />10K D10K S <br />10K E8510K BIO-20 <br />C-STORE <br />3,447 S.F. <br />FUTURE <br />TENANT <br />1,000 S.F. <br />FUTURE <br />TENANT <br />1,200 S.F. <br />AUTO FUEL ISLAND W/ <br />CONOPY 4,800 S.F.R100'-0"1 <br />1 <br />UNDERGROUND <br />TANKS6 <br />6 <br />6 R100'-0"E85 <br />BIO DIESEL <br />18 <br />19 <br />19 <br />18 <br />6 <br />6 11 <br />11