My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024 AS BUILT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN VALLEY
>
16460
>
2300 - Underground Storage Tank Program
>
PR0548366
>
INSTALL_2024 AS BUILT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 4:39:16 PM
Creation date
10/17/2024 4:36:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024 AS BUILT
RECORD_ID
PR0548366
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027617
FACILITY_NAME
FAST N EASY MART #104
STREET_NUMBER
16460
STREET_NAME
GOLDEN VALLEY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
APN
19204047
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
16460 GOLDEN VALLEY PKWY LATHROP 95330
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCRETE SLAB SHALL EXTEND <br />A MIN OF 2'-0" BEYOND THE <br />ENDS AND SIDES OF TANKS, <br />SEE SITE PLAN <br />8 <br />FS4.16 <br />FS4.1 <br />12 <br />FS4.1 <br />8 <br />FS5.0 <br />6 <br />FS5.0 <br />PRODUCT LINE INTERSTITIAL <br />VACUUM LINE TO <br />DISPENSERS, ZONE 2. <br />DBL WALL PIPE TO <br />FILL SUMP TO BRING <br />VACUUM LINE TO FILL <br />SUMP FOR VENT LINE <br />VENT LINE INTERSTITIAL <br />VACUUM LINE <br />TO VENT SUMP, ZONE 2. <br />PRODUCT LINE INTERSTITIAL <br />VACUUM LINE TO <br />DISPENSERS, ZONE 3. <br />VENT LINE INTERSTITIAL <br />VACUUM LINE TO VENT <br />+CROSSOVER, ZONE 3. <br />VACUUM SENSORVACUUM SENSOR <br />DBL WALL PIPE TO <br />FILL SUMP TO BRING <br />VACUUM LINE TO FILL <br />SUMP FOR VENT LINE <br />DROP TUBE WITH <br />OVERFILL VALVE <br />SET AT 95% <br />MAG PLUS <br />LIQUID LEVEL <br />PROBE <br />DROP TUBE WITH <br />OVERFILL VALVE <br />SET AT 95% <br />MAG PLUS <br />LIQUID LEVEL <br />PROBE <br />TEST PORT WITH TEST <br />HOSE AND <br />CONNECTION CAP <br />TEST PORT WITH TEST HOSE <br />AND CONNECTION CAP <br />TEST PORT WITH TEST HOSE <br />AND CONNECTION CAP21 <br />77 <br />81 <br />21 <br />BRINE INTERSTITIAL <br />SENSOR 79 <br />76 <br />808180 <br />SEE SHEET FS2.0 FOR EQUIPMENT LIST <br />NOTE:10,000 GAL BIO-2010,000 GAL. E-85BRINE INTERSTITIAL <br />SENSOR 79 <br />BRINE INTERSTITIAL <br />SENSOR 79 <br />PAN SENSOR <br />79 <br />PAN SENSOR <br />79 <br />PAN SENSOR <br />79 PAN SENSOR <br />79 <br />BRINE INTERSTITIAL <br />SENSOR 78 <br />79A 79A <br />SHEET NUMBER: <br />SHEET CONTENTS: <br />PROJECT NUMBER:PROJECT DATE: <br />CONSULTANTS: <br />Sacramento, CA 95827 <br />PH:(916) 455-6500 FAX:(916) 455-8100 <br />3090 Fite Circle, #104 <br />REVISIONS: <br />20-007 08-14-2020 <br />K12 Architects, Inc <br />DEVELOPER: <br />CONTRACTOR: <br />PROJECT: <br />Fast N <br />Easy <br />RIVER <br />ISLANDS <br /> 16460 GOLDEN VALLEY <br />PARKWAY <br />Lathrop, California 95330 <br />1 <br />Muhammad Bilal <br />10445 Chantel Lane <br />Stockton, CA 95212 <br />CONVENIENCE STORE AND <br />FUELING STATION <br />Parcel 1 <br />BUILDING DEPT. COMMENTS 10/4/21 <br />2 PLANNING DEPT REV 10/14/21 <br />3 BUILDING DEPT. COMMENTS 06/22/22 <br />3-25-2022 <br />4 BUILDING DEPT. COMMENTS 09/21/22 <br />5 FIRE DEPT. COMMENTS 10/19/22 <br />6 EHD-HAZMAT 12/12/22 <br />7 EHD-HAZMAT 02/03/23 <br />PROFESSIONAL SEALS: <br />8 ELECT MSB 06/28/23 <br />9 OWNER CHANGE 08/02/23 <br />10 WALK-IN COOLER DETAILS 10/13/23 <br />11 VEEDER-ROOT TLS-450 05/17/24 <br />14 BIO-20 / E-85 FUEL TANK MONITORING <br />1/2" = 1'-0"SCALE: <br />FS7.1 <br />BIO-DIESEL & E-85 <br />MONITORING <br />SYSTEM <br />7 <br />11 11
The URL can be used to link to this page
Your browser does not support the video tag.