Laserfiche WebLink
6 <br /> iota 0 CGRS <br /> . GOU TioruS❑EUVGRE❑ <br /> Secondary Flow Communication Test Certification <br /> Location: CGRS Project No : 61-29632 <br /> Tracy Triangle Fueling Test Date: January 27, 2026 <br /> W Larch Rd & N Tracy Blvd CGRS Techs: Adam Montejano <br /> Tracy, CA 96304 <br /> CGRS certifies that at the time the final ELD testing was performed,air flow communication was confirmed <br /> throughout the secondary piping components listed below. <br /> IPiping Secondary Communication Confirmation I <br /> COMPONENTS RESULTS <br /> 87 PL PASS <br /> 91 PL PASS <br /> DSLPL PASS <br /> E85 PL PASS <br /> 87 Vent PASS <br /> 91Vent PASS <br /> DSL Vent PASS <br /> E85 Vent PASS <br /> VR PASS <br /> IOTA Tech Signature: - w 1/27/2026 <br /> Adam Montejano CA Tank Tester#1775 Date <br /> Reviewed by: -4, 1/28/2026 <br /> Chris arphy V Direc(ooff CA Services Date <br />