My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3780
>
2300 - Underground Storage Tank Program
>
PR2600076
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:03:26 PM
Creation date
10/29/2024 8:54:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2600076
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0005924
FACILITY_NAME
H&M PETROLEUM CORP
STREET_NUMBER
3780
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3780 100 N TRACY BLVD TRACY 95304
Suite #
100
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Red Thread TI 11A Piping System <br /> (Specification Guide) <br /> Section 1 - Scope arewound around a mandrel ata543/;winding angle under <br /> controlled tension. Pipe shall be heatcured and the cure shall be <br /> This section covers the use of fiberglass reinforced plastic(FRP)pipe for confirmed using a Differential Scanning Calorimeter. <br /> single wait fuel handling and fuel hand lingventand vaporapplications <br /> including gasoline,unleaded gasoline,gasoline/alcohol mixtures, Pipe shall be supplied with a T.A.B. '(ThreadedandBonded) <br /> bio-diesel,DEF and diesel upto150OF and 250psigcyclicpressure. ends. <br /> Pipe shall have a minimum continuous cyclic pressure rating of <br /> Section 2 - General Conditions 125 prig at 150oF in accordance with ASTM D2992,Procedure A or <br /> 2.01 Coordination-Material furnished and work performed underthis UL971 pressure rating. <br /> sectionshall be coordinated with the related workand equipment All pipeshall be 100%hydrotested atthe factory beforeshipment <br /> specified under othersections,i.e.Valves,Flexible Connectors, at a minimum pressureof 265 psigand shall be UL971-2004 <br /> Equipment. Listed and labeled. <br /> 2.02 Governing Standards-Exceptas modified orsupplemented 3.02 ASTM D2310 Classifications(at 73.4°F) <br /> herein,all materials and construction methods shall complywith <br /> and betestedinaccordancewith the followingstandards and test 2"-3" RTRP-11AF <br /> methods: 4" RTRP-11AH <br /> Standard and Test Methods (Mechanical propertiescell classifications shown are minimums.) <br /> 3.03 Fittings-All fittings shall be manufactured usingthesame type <br /> UL9712004 Standard for Nonmetallic Underground Piping for Flammable of material as the pipe. Fittings maybe manufactured either by <br /> Liquids compression molding,filamentwinding,resin transfer molding <br /> ASTMD2310 Standard Classification for Machine-Made"Fiberglass"(Glass Fiber orcontact molding methods. All fittings,adapter,and sump <br /> Reinforced Thermosetting Resin) Pipe penetrations shall be UL971-2004 Listed. <br /> Standard Test Method for Obtaining Hydrostatic or Pressure Design ssha Fittin shall bonded matched taeredbelland <br /> ASTM D2992 Basis for"Fiberglass"(Glass-Fiber-Reinforced-Thermosetting Resin) g p <br /> Pipe and Fittings spigot. , <br /> 3.04 Connections-Connectionsto flex connectors orother piping <br /> 2.03 Operating Conditions-In addition to the above minimum materials shall be made bythe use of NPT(National PipeThread) <br /> design requirements,the system shall meet the following threaded adapters orflanges bonded to the FRP piping system. <br /> minimum operating conditions: 3.05 Sump Penetrations-Sump penetrations shall be made by <br /> a. Operating Pressure means of a permanently bonded FRP coupling. The coupling <br /> shall becapable of adjusting forthe slope of the pipingsystem <br /> b. Operating Temperature entering or exiting the sump wall. <br /> c. Fluid Conveyed 3.06 Adhesives-Adhesives shall be manufacturer's standard forthe <br /> piping system specified. <br /> d. Test Pressure <br /> 2.04QualityAssurance-Pipe manufacturer's quality program shalt Section 3 - Materials and Construction <br /> be in compliancewith ISO9001 and/orAPI Q1. 3.012"-4"Primaryand 3"-6"Secondary Pipe-The pipe shall be <br /> 2.05 Delivery,Storage and Handling-Pipe and fittingsshallbe manufactured by the filament winding process usingan amine <br /> protected from damage due to impact and pointloading. Pipe cured epoxythermosetting resin to impregnate strands of <br /> shall be properly supported to avoid damage due to flexural continuous glass filaments,which arewound around a mandrel <br /> strain. Thecontractorshall not allow dirt,debris or other at a 543/4"wind i ng angle under controlled tension. Thepipe <br /> extraneous materials to get into pipe and fittings. Allfactory shall be heat cured and the cure shall be confirmed using a <br /> machined areas shall be protected from sunlight until installed. Differential Scan ni ng Calorimeter. <br /> 2.06 Acceptable Manufacturers-Fiber Glass Systems, (501) Pipe shall be supplied with a T.A.B'"(Threaded and Bonded)or <br /> 568-4010,or approved equal. plain ends. <br /> Pipe shall have a minimum continuous cyclic pressure rating of <br /> Section 3 - Materials and Construction 125 psigat150oFin accordance with ASTM D2992,ProcedureAor <br /> UL971 pressure rating. <br /> 3.012"-4" Pipe-The pipeshallbemanufacturedbythefilament All pipe,both primary and secondary,shall be100%hydrotested <br /> winding process using an aminecured epoxy thermosetting at the factory before shipment at a minimum pressureof265 psig <br /> resin to impregnate strands of continuous glass filaments,which and shall be UL971-2004 Listed and Labeled. <br /> Fiber Glass Systems I KSY ProductionSolutions fgspipe@nov.com nov.com/fgs <br />
The URL can be used to link to this page
Your browser does not support the video tag.