My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3780
>
2300 - Underground Storage Tank Program
>
PR2600076
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:03:26 PM
Creation date
10/29/2024 8:54:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2600076
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0005924
FACILITY_NAME
H&M PETROLEUM CORP
STREET_NUMBER
3780
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3780 100 N TRACY BLVD TRACY 95304
Suite #
100
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 Red Thread 11A Specification Guide <br /> 3.02 ASTM D2310 Classifications(at73.4°F) Section 4- Installation and Testing <br /> Primary Pipe SecondaryPipe 4.01 Training and Certification-Alljoints installed orconstructed <br /> 2"-3" RTRP-11AF 3" RTRP-11AF in the field shall be assembled by employees of the contractor <br /> who have been trained bythe pipe manufacturer. The pipe <br /> 4 RTRP-11AH 4'-6 RTRP-11AH manufacturerortheir authorized representative,shall train the <br /> (Mechanical properties cell classifications shown areminimums.) contractor's employees in the properjoining and assembling <br /> procedures required forthe project,including hands-on <br /> 3.03 Fittings-All fittings shall be manufactured usingthe same type participation bythe contractor's employees. Eachbondershall <br /> of material as the pipe. Fittings maybe manufactured eitherby fabricate one pipe-to-pipe and one pipe-to-fittingjointthatshall <br /> compression molding,filamentwinding,resin transfer molding pass the minimum pressure test forthe application as stated in <br /> orcontact molding methods. All fittings,adapter,and sump Section 2.03 without leaking. <br /> penetrations shall be UL971-2004 Listed. only bondersthat have successfully completed the pressure test <br /> Primaryfittings shalt be adhesive bonded,matched tapered bell shall bond pipe and fittings. Each bonder shall carry a current, <br /> and spigot and rated the same as the pipe. manufacturer proof oftrainingcard. <br /> Secondary containmentfittings shall be two-piece style to allow 4.02 Pipe Installation-Pipe shall be installed as specified and <br /> for 100%inspection of the prima ryjoi nt pressure testa nd berated indicated on the drawings. <br /> to a minimum of 50 psig per UL 971-2004. The piping I in system shall be installed in accordance with the <br /> Should hydrostatic testing be im practical,testing with tow manufacturer's current published installation procedures. <br /> pressure airor inert gas maybe acceptable. Extremecaution 4.03Testing -A hydrostatic pressure testshallbe conducted onthe <br /> should be used when testingwith air. Follow all safety precautions completed piping system. piping system shall be <br /> and testing recommendations of the pipe manufacturer. p pz g Y pp g Y 1 <br /> to 10 pressurization cycles from 0 psigto 1.5timesthe design <br /> 3.04 Connections-Connections to flex connectors or other piping operating pressure as stated in Section2.03.c. After the 10cycles, <br /> materials shall be made bythe use of NPT(National PipeThread) the pressureshallbe held onthesystem fora minimum of1hour <br /> threaded adapters orflanges bonded to the FRP piping system. and the line inspected for leaks. <br /> 3.05 Sump Penetrations-Sump penetrations shall be made by means Test pressures shall notexceed 1.5 times the maximum rated <br /> of a permanently bonded FRPcoupling. Thecouplingshallbe pressure of the lowest rated element in the system. <br /> capableof adjusting forthe slope of the piping system entering or All I e ointsshallbewaterti ht. All ointsthatarefoundto <br /> exitingthesumpwall. P p J g 1 <br /> leak,by observation or during testing shaIt be replaced bythe <br /> 3.06 Adhesives-Adhesives shall be manufacturer's standard forthe contractorand retested. <br /> pipingsystem specified. <br /> Should hydrostatictesting be impractical,testingwith low <br /> 3.07 Acceptable Products-Red Thread llApipingsystemas pressure airor inert gas maybe acceptable. Extremecaution <br /> man ufactu red by Fiber Glass Systems or engineered approved should be used when testing with air. Follow all safety precautions <br /> equal. and testing recommendations of the pipe manufacturer. <br /> National Oilwell Varco has produced this brochure for general P g Fiber Glass Systems <br /> information only,and it Is not intended for design purposes. Although 17115 San Pedro Avenue, Ste 200 <br /> every effort has been made to maintain the accuracy and reliability of <br /> its contents,National oilwell Varco in no way assumes responsibility San Antonio,Texas 78232 USA <br /> for liability for any loss,damage or injury resulting from the use of Phone: 210 477 7500 <br /> information and data herein nor is any warranty expressed or implied. Fax:210 477 7560 <br /> Always cross-reference the bulletin date with the most current version <br /> listed at the web site noted in this literature. <br /> n 2018 National Oilwell varco All rights reserved <br /> C11201ENG October 2018 <br /> Fiber Glass Systems I Key CompletionlL Production Solutions fgspipe@nov.com nov.com/fgs <br />
The URL can be used to link to this page
Your browser does not support the video tag.