Laserfiche WebLink
0 <br />I <br />ED <br />v <br />I� <br />19 <br />SIM. <br />01 <br />A3.3 <br />E <br />W II <br />i <br />w A4. <br />,j� m <br />L� <br />r <br />I <br />N <br />8'-42"24'-94 <br />03 04 I B. ALL DENOTED DIMENSIONS ARE TO BE USED. PLANS SHALL NOT BE SCALED. <br />A3.2 A3 2 I C. EXTERIOR WALL ARE 26, INTERIOR WALLS 20 U.N.O., SEE STRUCTURAL <br />2'-7" 9'-11" Ilk 2'-7 04 I 36'-8" COOLER PLANS FOR FRAMING REQUIREMENTS. <br />D <br />yN <br />E. REFERTOSHEET PLANSNG 1. FOR RDFORNSIONS TO EQUIPMENTPPLANING FIXTURES <br />F. REFER TO SHEET 02.1 FOR EQUIPMENT SCHEDULE. <br />G. ALL EQUIPMENT SHALL MEET ACCESSIBILITY REACH RANGE REQUIREMENTS. <br />1 - -- i H, PROVIDE PLASTIC CORNER GUARDS AT EDGES BELOW 6'-0". <br />OFFICE p�pb�� I 2 5 �+ I. ALL COUNTERTOPS SHALL BE MAX. 34" A.F.F. WITH A 3 -FOOT WIDE <br />TRANSACTION AREA AT CASHIER. CONTRACTOR SHALL COORDINATE WORK <br />® c <br />2 FS WITH CABINET INSTALLER FOR CABINET INSTALLATION. CONTRACTOR TO <br />°j 2A TILITY 6 13 ROUTE UTILITIES THROUGH CABINETS. CONTACT CABINET INSTALLER FOR SITE <br />uo I SPECIFIC CABINET SHOP DRAWINGS. <br />2 1 I 10 1 L --J 3 ] b <br />FD 10 2 -58 ° 12'-5" 13'-112 37 4" J. 4" HIGH BACKSPLASH AT ALL COUNTERTOPS THAT TERMINATE AT WALL. <br />BACKSPLASH TO MATCH COUNTERTOP MATERIAL. <br />1 A2.6 3 I K. THE CONTRACTOR SHALL ASSIST STORE PERSONNEL BY ASSEMBLING <br />i 04 MERCHANDISE GONDOLAS AND SHELVING AS SHOWN ON Q1.1. <br />L. ALL EQUIPMENT AND CABINETS SHALL BE FREE OF SHARP EDGES. CONTACT <br />4 A2.5 4 °' MANUFACTURER OR PREP EDGES FOR SAFETY. <br />18 I ELECTRIC L/FUELING C BINET 1 2 3 4 5 6 7 8 9 10 M. CONTRACTOR SHALL ROUTE ALL CONDENSATE DRAIN LINES TO FLOOR SINKS. <br />I <br />-- - N. CONTRACTOR SHALL INSTALL NEW PARTITIONS/WALLS WITH GYPSUM WALL <br />E _ _ O C7 2 - - - - - - - -\_x/ <br />e 1 BOARD AND FINISHES AS NOTED ON FINISH SCHEDULE AND INTERIOR <br />J ELEVATIONS ON SHEET A2.3 THRU A2.6. ALL PARTITIONS/WALLS SHALL BE <br />F.E. 2A� I ti y5 r - - - F E 1 A2.5 13BRACED FOR LATERAL FORCES, PER BUILDING CODE REQUIREMENTS. <br />1 i n A2.4 8 11 10' T 0. FLAME SPREAD CLASSIFICATIONS FOR INTERIOR WALLS SHALL COMPLY WITH <br />FS �. _ - - - 1C�14LOCAL CODES. <br />TO GO 12 A2.5 P. FIRE EXTINGUISHERS (2A:10B:C) SHALL BE INSTALLED AT SALES COUNTER, <br />Y % BACK ROOM, OFFICE, & FUEL CANOPY LOCATIONS IF NOT SHOWN <br />L; FD - J 2 PSG '� � -- -- �l � 12 5 � ELSEWHERE ON THESE DRAWINGS. VERIFY WITH OWNER FOR DETAILS, <br />`��a' /J� 1D \ CONFIRM FINAL DETAILS WITH LOCAL FIRE INSPECTOR. <br />P o Q. CONTRACTOR SHALL ASSIST THE OWNER WITH STORE EQUIPMENT TO <br />RIOT FOOD �� - - 3" PREPARE A DELIVERY STAGING AREA COORDINATE WITH OWNER FOR THE <br />< /�/ j �_ O ME T 11 8 13 <br />DELIVERY PROVIDE A CL SMOOTH SURFACE FOR GRAPHICS <br />5' 2 12' o SCHEDULE AND SHIPPING DAMAGES, AS APPLICABLE <br />_ - R. CONTRACTORSHALL PRO I CLEAN, S <br />_ _ - L� INSTALLATION. <br />�I I CD <br />S. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR FROM CABINET <br />14 <br />�. J AND EQUIPMENT CLEARANCES PRIOR TO WALL ERECTION. DISCREPANCIES <br />7 A2.5 5 ��O \ N SHALL BE DIRECTED TO OWNER. <br />FS �C 03 - - - I - I 04 hw <br />6 �� / A2.3 i A2.4 11 i 15 'F` T ALLESINKS.TERS SHALL BE CAPABLE OF DELIVERING MIN. 120' WATER TO <br />F <br />' U. ALL FLOOR/WALL TILE AND COVE BASE SHALL BE INSTALLED BY THE <br />= j DGENERAL CONTRACTOR ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS. <br />01 o V. ALL DOORS MUST HAVE NO MORE THAN 5 LBS OPENING FORCE AND MUST <br />HAVE A SWEEP PERIOD OF 3 SECONDS TO CLOSE FROM 70' <br />f7 / 00 <br />16 <br />II ao D ' 16 A3.3 co .4-3" OPEN TO FROM THE LATCH. <br />® I II 1AAIN <br />2 W PREVEOR <br />DARREA. LINE OUTLET SHALL BE TO <br />TELEPI ONE 24 5'-2710'4" M A2 4 <br />F- <br />A <br />- _ I ,7 A KEYED NOTES <br />1 ALUMINUM ENTRANCE AND STOREFRONT SYSTEM, REFER TO SHEET A5.1 <br />,g 02 - O & SPECIFICATION. <br />3, 13„ 18 8'- I `° A2.3 <br />-71 1` ! / 03 O INSTALL 6"0 PVC CHASE FOR FOUNTAIN SYRUP LINES. <br />7 t t JILVAY \ 10 I n 13 5 A2.1 O FLOOR RECEPTACLES, REFER TO ELECTRICAL PLANS. <br />L6 -A2-.6X0022 II TMAL AgEA �- F.E. 4O ROOF LADDER PER DETAIL 7/A4.1 <br />3'-2" Px� o In FA�11 <br />I I100I <br />5 o I N N 3 2A I 02 1i O 1" MINIMUM AIR GAP AT PREFABRICATED COOLER/FREEZER <br />° I I ' I A3.3 N <br />13 \ COFFE ( I p O DEPRESSED SLAB, REFER TO SLAB PLAN. <br />�IONDIM T I r "` I FD <br />-- 3 1 10 M 2A 6 I I O7 LINE OF CANOPY ABOVE <br />TYP. NP. L - 9 2.6 1 J <br />I \ I O DOUBLE SWING METAL GATE PROVIDED BY SHOPCO <br />5 0 ( 2A 12 <br />O THRESHOLD, REFER TO DOOR SCHEDULE ON SHEET A5.1 <br />W D� I A2 <br />LuI- - L J { "i 1 O LINE OF SOFFIT ABOVE <br />W �� LLLL J �/ i - I I 3'-0' A 16 11 LINE OF CLERESTORY CEILING OPENING, REFER TO WINDOW SCHEDULE <br />QpA <br />I , / 16 \ 1A 1 I � � 2A _I � 3f6,15_ON SHEET A5.1 <br />OI: TYP I 2A I I I 12 WALL SIGNS <br />A FD 4 TRANSITION STRIP <br />".. <br />' "' I L <br />5 O OF.O.S. LL I I I <br />^1� 14 /� I ( -/^ I I O 14 O 3 L J 16 14 REFER TOSTEEL LST�RUCTURALNS RPLANS FORWINDOW ILL FOR SIZE ANDOREFRONT LOCATIION. PROTECTION, <br />I ti f( <br />I STEEL COLUMN OCATION FOR REFERENCE ONLY, REFER <br />TO STRUCTURAL PLANS TO CONFIRO LOCATIONS <br />REFER TO ST CTURAL PLANS FOR ILT-UP (B.U.) <br />COLUMN LOCATIONS�P <br />:.....j it <br />l B°D <br />CO UMN <br />u_ <br />14 14 n, <br />...... <br />....) - <br />. . mm <br />J I I J <br />i UJ . <br />1 W .. W ..... ...__.__. ... ....__ W I _..... __. _... .0 _. tU4 <br />N ........ __. ... ..... <br />LL <br />14'-0"4 15'-34" 15'-7" 15'-34" 5'-24 14'-O" <br />A 66 D E F G H <br />02 STEEL COLUMN LAYOUT <br />SCALE: 3/327=1'-0!' <br />COLUMN <br />I <br />M STEEL 3 <br />E STEEL 2 <br />" <br />GENERAL <br />NOTES <br />FINISHES <br />N <br />ARCO <br />A Al I Il11JFNCUIN(Z <br />ARF To FACE nF CTI In <br />I INI FCS Nf)TFf1 <br />nTHFRWISF. <br />03 04 I B. ALL DENOTED DIMENSIONS ARE TO BE USED. PLANS SHALL NOT BE SCALED. <br />A3.2 A3 2 I C. EXTERIOR WALL ARE 26, INTERIOR WALLS 20 U.N.O., SEE STRUCTURAL <br />2'-7" 9'-11" Ilk 2'-7 04 I 36'-8" COOLER PLANS FOR FRAMING REQUIREMENTS. <br />D <br />yN <br />E. REFERTOSHEET PLANSNG 1. FOR RDFORNSIONS TO EQUIPMENTPPLANING FIXTURES <br />F. REFER TO SHEET 02.1 FOR EQUIPMENT SCHEDULE. <br />G. ALL EQUIPMENT SHALL MEET ACCESSIBILITY REACH RANGE REQUIREMENTS. <br />1 - -- i H, PROVIDE PLASTIC CORNER GUARDS AT EDGES BELOW 6'-0". <br />OFFICE p�pb�� I 2 5 �+ I. ALL COUNTERTOPS SHALL BE MAX. 34" A.F.F. WITH A 3 -FOOT WIDE <br />TRANSACTION AREA AT CASHIER. CONTRACTOR SHALL COORDINATE WORK <br />® c <br />2 FS WITH CABINET INSTALLER FOR CABINET INSTALLATION. CONTRACTOR TO <br />°j 2A TILITY 6 13 ROUTE UTILITIES THROUGH CABINETS. CONTACT CABINET INSTALLER FOR SITE <br />uo I SPECIFIC CABINET SHOP DRAWINGS. <br />2 1 I 10 1 L --J 3 ] b <br />FD 10 2 -58 ° 12'-5" 13'-112 37 4" J. 4" HIGH BACKSPLASH AT ALL COUNTERTOPS THAT TERMINATE AT WALL. <br />BACKSPLASH TO MATCH COUNTERTOP MATERIAL. <br />1 A2.6 3 I K. THE CONTRACTOR SHALL ASSIST STORE PERSONNEL BY ASSEMBLING <br />i 04 MERCHANDISE GONDOLAS AND SHELVING AS SHOWN ON Q1.1. <br />L. ALL EQUIPMENT AND CABINETS SHALL BE FREE OF SHARP EDGES. CONTACT <br />4 A2.5 4 °' MANUFACTURER OR PREP EDGES FOR SAFETY. <br />18 I ELECTRIC L/FUELING C BINET 1 2 3 4 5 6 7 8 9 10 M. CONTRACTOR SHALL ROUTE ALL CONDENSATE DRAIN LINES TO FLOOR SINKS. <br />I <br />-- - N. CONTRACTOR SHALL INSTALL NEW PARTITIONS/WALLS WITH GYPSUM WALL <br />E _ _ O C7 2 - - - - - - - -\_x/ <br />e 1 BOARD AND FINISHES AS NOTED ON FINISH SCHEDULE AND INTERIOR <br />J ELEVATIONS ON SHEET A2.3 THRU A2.6. ALL PARTITIONS/WALLS SHALL BE <br />F.E. 2A� I ti y5 r - - - F E 1 A2.5 13BRACED FOR LATERAL FORCES, PER BUILDING CODE REQUIREMENTS. <br />1 i n A2.4 8 11 10' T 0. FLAME SPREAD CLASSIFICATIONS FOR INTERIOR WALLS SHALL COMPLY WITH <br />FS �. _ - - - 1C�14LOCAL CODES. <br />TO GO 12 A2.5 P. FIRE EXTINGUISHERS (2A:10B:C) SHALL BE INSTALLED AT SALES COUNTER, <br />Y % BACK ROOM, OFFICE, & FUEL CANOPY LOCATIONS IF NOT SHOWN <br />L; FD - J 2 PSG '� � -- -- �l � 12 5 � ELSEWHERE ON THESE DRAWINGS. VERIFY WITH OWNER FOR DETAILS, <br />`��a' /J� 1D \ CONFIRM FINAL DETAILS WITH LOCAL FIRE INSPECTOR. <br />P o Q. CONTRACTOR SHALL ASSIST THE OWNER WITH STORE EQUIPMENT TO <br />RIOT FOOD �� - - 3" PREPARE A DELIVERY STAGING AREA COORDINATE WITH OWNER FOR THE <br />< /�/ j �_ O ME T 11 8 13 <br />DELIVERY PROVIDE A CL SMOOTH SURFACE FOR GRAPHICS <br />5' 2 12' o SCHEDULE AND SHIPPING DAMAGES, AS APPLICABLE <br />_ - R. CONTRACTORSHALL PRO I CLEAN, S <br />_ _ - L� INSTALLATION. <br />�I I CD <br />S. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR FROM CABINET <br />14 <br />�. J AND EQUIPMENT CLEARANCES PRIOR TO WALL ERECTION. DISCREPANCIES <br />7 A2.5 5 ��O \ N SHALL BE DIRECTED TO OWNER. <br />FS �C 03 - - - I - I 04 hw <br />6 �� / A2.3 i A2.4 11 i 15 'F` T ALLESINKS.TERS SHALL BE CAPABLE OF DELIVERING MIN. 120' WATER TO <br />F <br />' U. ALL FLOOR/WALL TILE AND COVE BASE SHALL BE INSTALLED BY THE <br />= j DGENERAL CONTRACTOR ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS. <br />01 o V. ALL DOORS MUST HAVE NO MORE THAN 5 LBS OPENING FORCE AND MUST <br />HAVE A SWEEP PERIOD OF 3 SECONDS TO CLOSE FROM 70' <br />f7 / 00 <br />16 <br />II ao D ' 16 A3.3 co .4-3" OPEN TO FROM THE LATCH. <br />® I II 1AAIN <br />2 W PREVEOR <br />DARREA. LINE OUTLET SHALL BE TO <br />TELEPI ONE 24 5'-2710'4" M A2 4 <br />F- <br />A <br />- _ I ,7 A KEYED NOTES <br />1 ALUMINUM ENTRANCE AND STOREFRONT SYSTEM, REFER TO SHEET A5.1 <br />,g 02 - O & SPECIFICATION. <br />3, 13„ 18 8'- I `° A2.3 <br />-71 1` ! / 03 O INSTALL 6"0 PVC CHASE FOR FOUNTAIN SYRUP LINES. <br />7 t t JILVAY \ 10 I n 13 5 A2.1 O FLOOR RECEPTACLES, REFER TO ELECTRICAL PLANS. <br />L6 -A2-.6X0022 II TMAL AgEA �- F.E. 4O ROOF LADDER PER DETAIL 7/A4.1 <br />3'-2" Px� o In FA�11 <br />I I100I <br />5 o I N N 3 2A I 02 1i O 1" MINIMUM AIR GAP AT PREFABRICATED COOLER/FREEZER <br />° I I ' I A3.3 N <br />13 \ COFFE ( I p O DEPRESSED SLAB, REFER TO SLAB PLAN. <br />�IONDIM T I r "` I FD <br />-- 3 1 10 M 2A 6 I I O7 LINE OF CANOPY ABOVE <br />TYP. NP. L - 9 2.6 1 J <br />I \ I O DOUBLE SWING METAL GATE PROVIDED BY SHOPCO <br />5 0 ( 2A 12 <br />O THRESHOLD, REFER TO DOOR SCHEDULE ON SHEET A5.1 <br />W D� I A2 <br />LuI- - L J { "i 1 O LINE OF SOFFIT ABOVE <br />W �� LLLL J �/ i - I I 3'-0' A 16 11 LINE OF CLERESTORY CEILING OPENING, REFER TO WINDOW SCHEDULE <br />QpA <br />I , / 16 \ 1A 1 I � � 2A _I � 3f6,15_ON SHEET A5.1 <br />OI: TYP I 2A I I I 12 WALL SIGNS <br />A FD 4 TRANSITION STRIP <br />".. <br />' "' I L <br />5 O OF.O.S. LL I I I <br />^1� 14 /� I ( -/^ I I O 14 O 3 L J 16 14 REFER TOSTEEL LST�RUCTURALNS RPLANS FORWINDOW ILL FOR SIZE ANDOREFRONT LOCATIION. PROTECTION, <br />I ti f( <br />I STEEL COLUMN OCATION FOR REFERENCE ONLY, REFER <br />TO STRUCTURAL PLANS TO CONFIRO LOCATIONS <br />REFER TO ST CTURAL PLANS FOR ILT-UP (B.U.) <br />COLUMN LOCATIONS�P <br />:.....j it <br />l B°D <br />CO UMN <br />u_ <br />14 14 n, <br />...... <br />....) - <br />. . mm <br />J I I J <br />i UJ . <br />1 W .. W ..... ...__.__. ... ....__ W I _..... __. _... .0 _. tU4 <br />N ........ __. ... ..... <br />LL <br />14'-0"4 15'-34" 15'-7" 15'-34" 5'-24 14'-O" <br />A 66 D E F G H <br />02 STEEL COLUMN LAYOUT <br />SCALE: 3/327=1'-0!' <br />COLUMN <br />I <br />M STEEL 3 <br />E STEEL 2 <br />ROOM FINISH SCHEDULE <br />INTERIOR <br />N <br />CASHIER <br />FINISHES <br />N <br />ARCO <br />SP WEST COAST PRODUCTS, LLC <br />i <br />1 S ROOF DRAIN AND OVERFLOW, REFER TO CIVIL PLANS FOR CONTINUATION <br />REFER TO FINISH CALLOUT ON A1.2. <br />FLOOR <br />lA <br />PORCELAIN <br />W <br />16 CANOPY DOWNSPOUT, REFER TO CIVIL PLANS FOR CONTINUATION <br />REFERT <br />BASE <br />F- N <br />ON 2. <br />Of <br />17 ENLARGED <br />WALL TILE <br />i//j0Fm <br />a <br />REFER TO CALLOUT ON SHEET A2.3 - A2.6. <br />WATER RES <br />I <br />12 <br />BOARD, REI <br />A2.6 RESTROOM <br />a <br />�x <br />17 FUTURE SOLAR EQUIPMENT <br />B 7 <br />A3.1 <br />FASCIA PAINTED SMOOTH FINISH 1/2" GYPSUM BOARD. <br />NOT APPLI( <br />TYP, OF <br />3 <br />PLAN <br />18 CO2 SAFETY MONITORING EQUIPMENT, REFER TO SHEETS Q1.1 AND Q2.1 <br />BOARD. REFER TO CALLOUT ON A1.3. <br />2'-4" <br />PAINTED PLYWOOD AND <br />PAINTED SMOOTH FINISH <br />FOR LOCATION AND SPECIFICATION <br />7'-38 <br />2'-4 <br />�3� <br />2'-''4 <br />3'-5" <br />11'-2" <br />REFER TO CALLOUT ON <br />19 RECESSED STAINLESS STEEL FILL BOX WITH QUICK -DISCONNECT MALE <br />GYPSUM B( <br />A1.3. <br />A1.3. <br />TO CALLOU <br />FILL AND VENT HOSE CONNECTION FOR CO2 TANK <br />4 <br />4'-102" <br />0 <br />14'-72" <br />52 <br />LEGEND <br />LU <br />LU <br />THESE DRAWINGS AND SPECIFICATIONS, AS <br />INSTRUMENTS OF SERVICE, ARE AND SHALL <br />WOOD FRAMED WALL <br />ENGINEER WHETHER THE PROJECT FOR <br />WHICH THEY ARE MADE IS EXECUTED OR NOT. <br />THESE DRAWINGS AND SPECIFICATIONS <br />SHALL NOT BE USED BY ANY PERSON OR <br />PREFABRICATED COOLER/FREEZER WALL <br />TO THIS PROJECT, OR COMPLETION OF THIS <br />PROJECT -WHEN PHASED -WITHOUT THE <br />WRITTEN CONSENT OF CSHQA OR ITS <br />AFFILIATES. Copyright 2017 <br />O 2x6 STUDS ® l6"ox. <br />ARCO NTI <br />3800 AM/PM <br />PROTOTYPE <br />SITE ADDRESS: <br />1A 2x6 STUDS ® 16"o.c. W/ THERMAL INSULATION <br />SEC W B MILE RD AND THORNTON RD <br />STOCKTON, CA 96209 <br />FACILITY # 83912 <br />DESIGNED BY: <br />7 2x4 STUDS ® 16"o.c. <br />CHEIXfD BY: <br />DRANK BY: <br />2A 2x4 STUDS ® Wo.c. W/ SOUND BATT INSULATION <br />PROJECT NO: <br />05-02-18 <br />17285 <br />DRAWING TITLE: <br />OX DOOR SYMBOL, REFER TO SHEET A5.1 FOR DETAILS <br />FLOOR PLAN <br />SHEET NO: <br />Al ml <br />OX WINDOW SYMBOL, REFER TO SHEET A5.1 FOR DETAILS <br />ROOM FINISH SCHEDULE <br />INTERIOR <br />SALES <br />CASHIER <br />REST <br />FINISHES <br />lor <br />ARCO <br />SP WEST COAST PRODUCTS, LLC <br />i <br />GLAZED PORCELAIN TILE <br />REFER TO FINISH CALLOUT ON A1.2. <br />FLOOR <br />CERAMIC SANITARY COVE BASE <br />PORCELAIN <br />W <br />REFER TO FINISH CALLOUT ON A1.2. <br />REFERT <br />BASE <br />F- N <br />ON 2. <br />Of <br />PAINTED SMOOTH FINISH 5/8" GYPSUM BOARD. <br />WALL TILE <br />i//j0Fm <br />a <br />REFER TO CALLOUT ON SHEET A2.3 - A2.6. <br />WATER RES <br />WALLS <br />BOARD, REI <br />a <br />�x <br />CALLOUT 0 <br />Z <br />FASCIA PAINTED SMOOTH FINISH 1/2" GYPSUM BOARD. <br />NOT APPLI( <br />FASCIA/SOFFIT <br />REFER TO CALLOUT ON A2.3 & A2.4. SOFFIT PAINTED <br />REVISION DESCRIPTION <br />SMOOTH FINISH 5/8" WATER RESISTANT GYPSUM <br />BOARD. REFER TO CALLOUT ON A1.3. <br />PAINTED PLYWOOD AND <br />PAINTED SMOOTH FINISH <br />PAINTED SN <br />OPEN WEB TRUSSES. <br />5/8" GYPSUM BOARD. <br />5/8" WATE <br />CEILING <br />REFER TO CALLOUT ON <br />REFER TO CALLOUT ON <br />GYPSUM B( <br />A1.3. <br />A1.3. <br />TO CALLOU <br />CLIENT: <br />by <br />lor <br />ARCO <br />SP WEST COAST PRODUCTS, LLC <br />i <br />W <br />F- N <br />Of <br />i//j0Fm <br />a <br />=) I- <br />p W o <br />/ <br />m g <br />o <br />a <br />�x <br />Z <br />N0. <br />DATE <br />REVISION DESCRIPTION <br />SEAL D <br />0 <br />�m <br />s <br />U <br />LU <br />LU <br />THESE DRAWINGS AND SPECIFICATIONS, AS <br />INSTRUMENTS OF SERVICE, ARE AND SHALL <br />REMAIN THE PROPERTY OF THE ARCHITECT <br />ENGINEER WHETHER THE PROJECT FOR <br />WHICH THEY ARE MADE IS EXECUTED OR NOT. <br />THESE DRAWINGS AND SPECIFICATIONS <br />SHALL NOT BE USED BY ANY PERSON OR <br />ENTITY ON OTHER PROJECTS, FOR ADDITIONS <br />TO THIS PROJECT, OR COMPLETION OF THIS <br />PROJECT -WHEN PHASED -WITHOUT THE <br />WRITTEN CONSENT OF CSHQA OR ITS <br />AFFILIATES. Copyright 2017 <br />DEVELOPMENT INFORMATION: <br />ARCO NTI <br />3800 AM/PM <br />PROTOTYPE <br />SITE ADDRESS: <br />2910 W. EIGHT MILE ROAD <br />SEC W B MILE RD AND THORNTON RD <br />STOCKTON, CA 96209 <br />FACILITY # 83912 <br />DESIGNED BY: <br />CHEIXfD BY: <br />DRANK BY: <br />VERSION: <br />PROJECT NO: <br />05-02-18 <br />17285 <br />DRAWING TITLE: <br />CONSTRUCTION <br />FLOOR PLAN <br />SHEET NO: <br />Al ml <br />