My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUTO PLAZA
>
3400
>
2800 - Aboveground Petroleum Storage Program
>
PR0528227
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 2:03:09 PM
Creation date
11/27/2024 2:02:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0528227
PE
2831 - AST FAC >/= 1,320 - <10 K GAL CUMULATIVE
FACILITY_ID
FA0010308
FACILITY_NAME
TRACY CHEVROLET
STREET_NUMBER
3400
STREET_NAME
AUTO PLAZA
STREET_TYPE
WAY
City
TRACY
Zip
95376
APN
21227011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3400 AUTO PLAZA WAY TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />CP22 - AST Tier I Inspection Report <br />Date: <br />August 13, 2024 <br /> Facility Address: <br /> 3400 AUTO PLAZA WAY, TRACY <br /> Facility Name: <br /> TRACY CHEVROLET <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Code of Fed Regulations 112.3(e)(1) 4010008 - SPCC onsite If facility staffed 4 hrs/day, or at the nearest field office if <br />not so attended. <br />OBSERVATION: A copy of the complete Spill Prevention , Control, and Countermeasure (SPCC) Plan was not available <br />for review at the time of inspection. <br />REGULATION GUIDANCE: (e) If you are the owner or operator of a facility for which a Plan is required under this <br />section, you must: (1) Maintain a complete copy of the Plan at the facility if the facility is normally attended at least <br />four hours per day, or at the nearest field office if the facility is not so attended . <br />CORRECTIVE ACTION: Maintain SPCC plan onsite if the facility is staffed at least four (4) hours per day, or at the <br />nearest field office if the facility is not staffed . Submit proof of correction to the EHD. <br />This was corrected on site. <br />This is a repeat violation (Class 2) Violation. <br /> 4 <br />Code of Fed Regulations 112.5(b) 4010009 - 5 year review performed on SPCC and documented. <br />OBSERVATION: The facility failed to perform the 5-year review of the SPCC plan. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan was last reviewed on 12/04/2019. <br />REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a) of this section, complete a <br />review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br />this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was <br />required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months <br />of the review to include more effective prevention and control technology if the technology has been field -proven at the <br />time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. <br />You must implement any amendment as soon as possible , but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation , and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br />following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), <br />and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Immediately complete and document the 5-year review of the SPCC Plan and make any <br />necessary amendments (a Professional Engineer must certify any technical amendments). Submit verification of <br />adequate SPCC plan review completion to the EHD. <br />This is (Minor) Violation. <br /> 10 <br />Code of Fed Regulations 112.7 4010012 - SPCC in writing, follows code seq/cross ref, good eng practice, mgt <br />approval, items not in place. <br />OBSERVATION: The 12/04/2019 Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to have the full <br />approval of management at a level of authority to commit the necessary resources to fully implement the Plan. <br />REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a Plan in <br />accordance with good engineering practices. The Plan must have the full approval of management at a level of <br />authority to commit the necessary resources to fully implement the Plan. You must prepare the Plan in writing . If you <br />do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan acceptable to <br />the Regional Administrator that meets all of the applicable requirements listed in this part , and you must supplement it <br /> 11 <br />FA0010308 PR0528227 SC001 08/13/2024 <br />EHD Rev. 12/06/2021 CP22 - AST Tier I OIRPage 4 of 6 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.