Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP}UD TEST (oontinued) <br /> Test Method Developed by E3 Manufacturer Ej Industry Standard Professional E=ngineer <br /> Test Type Pressure E] Vacuum El Hydrostatic <br /> Test Equipment Used. Iii I-TS1000-Hyd-15min <br /> Sump1UDC ID 11-12 <br /> Sump Manufacturer NIA <br /> Sump Depth (incites) NIA <br /> Sump Bottom to Top of 111A <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 13.34 <br /> Initial Reading 1.4053 <br /> Test End Time 13:49 <br /> Final Beading 1.4054 <br /> Change in Reeding .0001 <br /> ass ail Criteria 0.002 0.002 10.002 0.002 <br /> Tightness Test Results Pass C Fail C Pass Fail Pass rl f=ail Ll Pass ❑ Fail <br /> SumpfUDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Paas/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Result Pass 0 Fail Pass rl Fail-1- Pass fl Fail E Pass M Fall <br /> Additions) copies of this page may be attached. <br /> All tests marked "Fail" acrd arsy repairs made before or during the tigrhrness test must be described in <br /> the COMMENTS section <br /> Page 4 of 5 <br />