Laserfiche WebLink
IMPORTAriT: The inVlYuCt one itielvw for the 7150 Upm Tube Length=C +(A) <br /> Overfill Prevention Valve awe wrKtm for 1 initial <br /> aW W%gaff at 95%,bmk on bar edjusiad to Au" Fo#testable nvo dell only,e+dbq in'r; <br /> at my d Wred teak copodtlr. Pkos&opoloct#Ira Au- Upper Tube 1Lerrgth=C+(A)- 1.1 f2" <br /> tha ky Warring Juried -den [AMJ)and review kmmL <br /> stmAt and nadonW ra &mto datormbne the regulato- YES Upper tube length is 6-112"pkts ft riser pipe <br /> rY"gt**n%eints gowerning shutoff capadty in your measurement(A). <br /> as"I as take kiw accoum other conskkHra- <br /> tk nu mach as extreme tank dlt k all casas,the up- Upper Tube Length= 6-1/2'+(A) <br /> per rube must W&WWo kft the tank me Wwd 61 W <br /> to amore lit the valve can shut of flow Into the For testable rnadels oet ly, ending fn'r. <br /> tank aomplatrly before the top of t h e mini[is wetted Upper Tube ken =6-1 " +(A)-1 t1/2W <br /> as per EPA requirements. <br /> NOiE: You errant find the amml tank p►podty num- <br /> HOW TO LOCATE THE PIDSITION OF THE 715O AT ber that dates to the!F 1Ir+(A)depth for the <br /> 05%TANK CAPACrTV station racwds. This number nw V also ba used for <br /> ($A+*vNpvtnd em bw ad end to oey capadty is the p ugwm i of cakbredng an ukrcbvok tank h"I <br /> "MPty 1Wth A Mj RegarkerM"?b) system. <br /> The length of the upper tube and the placement of the Tape meow m <br /> 71 SO valve body deteM Pqi nee the shut-off point- Fol law- <br /> irog the standard in&krLiMons for the DPW 7150 will pro- <br /> eidrfor herbal dust i ar 95W in all rases,the upper <br /> Wbe length m u5t be a rni n inmum of 6-1/2' plus the <br /> ienTh of the riser pipe- AP length measurements are In <br /> inches. <br /> Rlear�Ipe <br /> iNSTRUCT4GM wMh Face (A) <br /> t) (rl rank S alAdaptar <br /> capa&y{x(x gaJiori.S tt43rM tarrak CBPbfatjarx fv. 1 01 !�) <br /> chart provided key tank manufacturer. To reNc <br /> 2) Calculate 95%of�apaadty <br /> 3) Locate the 95%vokume n under on the tank cal ibra- <br /> Wn Chart- T <br /> 4) rind the d436tfck number{gyp which convsportds to <br /> the 95%tank valunw. And.Find the dpstkk num- Figum 7 <br /> ber(Y)which corresponds to the IOU%vofume. <br /> 5) F>L; tract the dipoIck number( )from the tank di EXAMPLE <br /> arneter M to fired lbe upper tube reference num bee <br /> 1) For an Owens-Corning adeiCr3Flberglass*-Tank <br /> akhraticn Chan <br /> (Y) -M = l Tanis C_ c�- 1 O OW94,nornInal 9AO3 gal. <br /> 6) Subtract 2"frorn (Z)to Find the upper tube depth tlOTF- Vw a0ami aModft 9* <br /> f 2) 9596 of actual tank carpadiy 0.95 x 9403 gal._ <br /> (Z)-2"-C 8933 qW- <br /> 71 Is C lass tFrin t 1 f 3) The closest"umber witich is Jess than 8933 gal.Is <br /> 891 D gal,C hoasi rig t1lbe CkMrA number ke n"r+ <br /> 95%of aural capac Iry ensures That tie in hial <br /> NO Upper tube length Fs C plus the dPstance ftem shutoff anll occur when tank is"more than <br /> the top V the Face Seai Adaptor in5tailed on 95%full_ <br /> the riser pipe to the inside.top I ip of the storage A) The calibration chart rdlnq ni 8910 cgdl.corms <br /> tank(A), sponds ro a dipstick measureynertt of 82'. <br />