My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2026 8:05:19 PM
Creation date
1/10/2025 11:21:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0508452
PE
2361 - UST FACILITY
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4405 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure fllrfPMANT.Remove a))chips and shavings germr- <br /> :' 1� ated in steps 3 th ru 5 out of the cat end of the to - DO <br /> ,- NOT m move chips and shavir►cgs by damping thru valve <br /> try . <br /> Mark Oppm Tube <br /> xCuC t kMe1 STEP 4: UPPER DROP TUBE <br /> * Sean, Fife the upper tube square,and remove any burrs or <br /> Rjum 2 <br /> rough edges. Make sure the cut is flat and square, <br /> IMPORTANT;Carefully fi I a good oha infer an the <br /> STSP S: [UT TH9 UPPER DROP TUBE Inside edge 0 the drop tube to provide a 1padrin for the <br /> palypak sea(and inlet tube irtstOW in Step 8. <br /> Attach tie supgiled band clamp to bhe upper tube just <br /> below the nm rk and errs,re that It is as"mbled square <br /> to the the. The clamp to n be used as a guide for mak- <br /> ing a square cut if a vkt,-is used,clamp on the valve <br /> body"s iing only to avoid damage to the float and <br /> tubes lSoe Figure 3N. Carefully saw thmmg4 the tub <br /> squarehy,at the mark made in Step 2. Use a hacksaw <br /> will,a new fir tooth blade. Rotating the upper tube <br /> as the sawing prtogresses will minimize run out and en- <br /> sure a squa re degree tot. Remove the Hand clamp <br /> after tube is cut <br /> CA -00 MOT vie a pipe or tubbal cuM*r to cut Firr o nait nmx, d+rb <br /> the uppw drop tube,this miay damage the tube, <br /> causing It va be out of rownd thereby prohibi flog <br /> asswrrAi4Vofth*unit. <br /> FIgLut 4 <br /> r <br /> STEPS. SAND THE UPPER DROP TUENE <br /> x � Sand the Inside of the drop babe with sandpaper and/or <br /> steel wool to remove all burrs and "rp edges. After <br /> sandi rtg wipe down the lnskk of the tube w4b a clean <br /> S' rack hom the top to apprwcbnalely 4 inches down to <br /> remove any debos# <br /> sal Failure to properly chomfor,sat4 and <br /> ckNin the drop tube may oat the seal and result in a <br /> i <br /> failure&F a prossure dm3ky leak tat. <br /> 4` <br /> Fkwm JA f <br /> ' Fie qN sawb.aa� <br /> Fogure is 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.